- The general has confirmed what was clear all along: the "Defence Engagement Battalions" will be tiny and the manpower recouped from their downsizing is what will be available to beef up the units needed for the Strike Brigades. N battalions (2 to 5) will go down to "around 300" personnel, from the current 560 (Army 2020 Light Role battalion establishment, all-ranks, all-trades). The DEBs are tiny, but don't you go thinking it is yet another fudge to avoid disbanding unsustainable battalions! No, they are just going to be "very specialized", with more officers and NCOs, linguists etcetera, according to the general. We'll see.
- The Strike Brigades are apparently going to have a very questionable structure: Carter talked of 2 regiments on Ajax and "probably" 2 mechanized infantry battalions for each brigade.
This suggests a very modest uplift of one battalion compared to earlier plans for 3 mechanized / heavy protected mobility units. What cost will be paid by heavy armoured infantry and tank units, we do not yet know.
With 4 regiments of "50 to 60" Ajax vehicles planned as key parts of the Strike Brigades, we are most likely looking at armoured brigades without a heavy cavalry formation: 4 regiments is already one more than earlier planned, and with no extra vehicles on the horizon it is hard to imagine any more regiments using the type, unless all recce troops within armoured infantry and tank regiments are sacrificed to scrape up enough Ajax to build up some kind of recce formation.
The Ajax will be the "medium armour" element of the Strike Brigade, and this is incredibly annoying because FRES SV did include an actual Medium Armour segment, which envisaged a medium tank with a 105 or even 120 mm smoothbore gun, but it was cancelled and it is not coming back.
Ajax was then designed and built for reconnaissance, and now will be squeezed into a medium armour construct, with reconnaissance a distant second and with the heavy armour formations apparently cut out.
The whole Strike Brigade concept appears to be built upon the french army operations in Mali, which have evidently fascinated Carter to no end. Supposedly, the Strike Brigade will be a self-contained, self-deployable formation able to move "up to 2000 km" on its own, covering a large battlespace, "dispersing and regrouping" as necessary.
This is what the french did in Mali with their mechanized, highly mobile battlegroups, but whether that experience is in any way indicative of future scenarios and needs is up for debate.
The french in Mali have enjoyed the firepower of 105mm guns on AMX-10 and 90 mm guns on Sagaie. In the future, they will have the EBRC Jaguar with the 40mm CTA plus 2x anti-tank missiles, so they won't have the same kind of direct fire punch. They might very well feel the loss.
Ajax comes with no anti-tank missiles, as of current plans, so it'll have even more of a firepower deficit. That Medium Armour element would be very handy now, if this is the plan the british army thinks it needs to follow.
Also, it is worth noticing that the french medium brigades will have 2 cavalry regiments, but more than 2 infantry units. In addition, french infantry regiments are much, much larger than british ones.
The Strike Brigade seems an imitation made by the poor cousin.
Again, the french have taken the "self-deployable", "highly mobile" part of the concept very seriously by introducing combat squadrons in the logistic regiments to ensure that supply convoys have a permanent, organic escort.
Again, the french can count on mobile, mechanized artillery in the form of CAESAR, while the British Army is most likely going to count on towed L-118.
Having to rely on Ajax for the Medium Armour capability also goes against another of the British Army's own recommendations from the Agile Warrior experiments: do not mix track and wheel in combat formations.
Many, many doubts remain. The price that the heavy armour will pay to allow this to (try to) become reality will be the measure of the wisdom of this plan. If the cost is contained, it'll be somewhat acceptable. Otherwise, it'll be a disaster under a fancy label.
- Force generation cycle. According to the written evidence submitted to the Committee, the army will adopt a new 4-year cycle, with 2 armoured and 2 strike brigades, alternating in such a way to ensure that one of each type is always at readiness.
Ajax was then designed and built for reconnaissance, and now will be squeezed into a medium armour construct, with reconnaissance a distant second and with the heavy armour formations apparently cut out.
The whole Strike Brigade concept appears to be built upon the french army operations in Mali, which have evidently fascinated Carter to no end. Supposedly, the Strike Brigade will be a self-contained, self-deployable formation able to move "up to 2000 km" on its own, covering a large battlespace, "dispersing and regrouping" as necessary.
This is what the french did in Mali with their mechanized, highly mobile battlegroups, but whether that experience is in any way indicative of future scenarios and needs is up for debate.
The french in Mali have enjoyed the firepower of 105mm guns on AMX-10 and 90 mm guns on Sagaie. In the future, they will have the EBRC Jaguar with the 40mm CTA plus 2x anti-tank missiles, so they won't have the same kind of direct fire punch. They might very well feel the loss.
Ajax comes with no anti-tank missiles, as of current plans, so it'll have even more of a firepower deficit. That Medium Armour element would be very handy now, if this is the plan the british army thinks it needs to follow.
Also, it is worth noticing that the french medium brigades will have 2 cavalry regiments, but more than 2 infantry units. In addition, french infantry regiments are much, much larger than british ones.
The Strike Brigade seems an imitation made by the poor cousin.
Again, the french have taken the "self-deployable", "highly mobile" part of the concept very seriously by introducing combat squadrons in the logistic regiments to ensure that supply convoys have a permanent, organic escort.
Again, the french can count on mobile, mechanized artillery in the form of CAESAR, while the British Army is most likely going to count on towed L-118.
Having to rely on Ajax for the Medium Armour capability also goes against another of the British Army's own recommendations from the Agile Warrior experiments: do not mix track and wheel in combat formations.
Many, many doubts remain. The price that the heavy armour will pay to allow this to (try to) become reality will be the measure of the wisdom of this plan. If the cost is contained, it'll be somewhat acceptable. Otherwise, it'll be a disaster under a fancy label.
- Force generation cycle. According to the written evidence submitted to the Committee, the army will adopt a new 4-year cycle, with 2 armoured and 2 strike brigades, alternating in such a way to ensure that one of each type is always at readiness.
How it is supposed to work, i sincerely can't quite imagine. There are only so many ways you can try and keep at readiness 2 out of 4 brigades, year after year.
- Reserves. The Army has suddenly awakened to one fact: it is not realistic to expect that reservists will be available in sufficient numbers to routinely complete understrength, mutilated regular units.
The Reserve will still be "integrated", but it'll return to a "warfighter reinforcement" model, as well as continue to be a supplier of specialists (for example, 80% of the medical capability, as already happens).
I'm not paid by the Army or MOD, nor am i inside their secrets, but if you read this same blog in November last year, you were faced by the prophecy about the true nature of the Defence Engagement Battalion and by the problem of force generation cycle and all other adjustements needed for this 4 brigade approach.
Had the defence committee read my post, they would have had today's answers with greater detail and background, several months early.
And this should be a reason for concern all by itself, because the MOD and Army top brass are supposed to do a little bit better than me on my own in my spare time...
The little we learned today, in practice, is enough to confirm that we are heading into a new questionable castle of fragile compromises, as was easily predictable. And we still do not have a measure of the other stealthy cuts that will be involved in this exercise of make believe. What will be the two armoured brigades look like? Will the number of MBTs fall further? What about reconnaissance in the heavy formations?
And what will be the capability of the 6 remaining infantry brigades? What will their role be in the force generation cycle, and will the UK retain the ability to sustain an enduring brigade-sized deployment?
Meanwhile, from Eurosatory we hear that the expected date for the first MOD choices regarding the Multi Role Vehicle - Protected has come and gone in the silence, with no decisions evident.
The Royal Artillery is expected to put out an Invite To Tender early next year for two precision artillery solutions for the 155mm calibre: one requirement is for "Near Precision", and will be most likely fullfilled (assuming it receives funding one day) with course-correction fuzes that can reduce the CEP of standard, unguided shells.
The "Extreme Precision" requirement would be met by a guided shell, which could be Excalibur, or Vulcano, or the Standard Guided Projectile, or any of the other contenders on the market. Even if the ITT goes out early next year as now apparently planned, it'll be 2019 before a choice is made. Don't hold your breath. The Royal Artillery has been trying to get this programme to progress for so many years that it isn't even funny anymore.
Industry is forming teams that will compete for the Challenger 2 LEP programme, but, again, it'll be a while before anything happens and for now, apart from the pricetag, there is nothing particularly exciting in this obsolescence-removal programme of desperation.
ABSV, as always, tends not to make any news, ever.