The huge issues in the Integrated Review

 

F-35

Will the new Review provide an actual plan for the UK's F-35 purchase?

It is very much time to decide, because UK purchases are only planned out up to the 48th airplane. Specifically, the UK is acquiring:

 

3 jets in LRIP 12 (Fiscal Year 2018; delivery this year)

6 in LRIP 13 (2019; delivery 2021)

8 in LRIP 14 (2020; delivery 2022)

7 in LRIP 15 (2021; delivery was to be in 2023 but got slowed down. Just 2 deliveries expected in 2023 now)

6 in LRIP 16 (2022; delivery was to be in 2024 but got slowed down. Just 4 now expected in 2024. A total of 7 jets will thus now only be delivered in 2025)

 

The delay to deliveries was reported by the National Audit Office: basically, the MOD decided to delay delivery to spread out the expenditure across more financial years.

 

Note that Lot 15 and 16 are expected to be part of a 3-lots Block Buy (15, 16 and 17). The final production contract for this Block Buy, which will be as always concluded by the US Department of Defense on behalf also of the international partners, has not yet been concluded but will be in the near future.

The UK currently has no known plan for what to do with Lot 17: will it contain any UK aircraft? Will it be a complete gap year?  

In practice, beginning in 2023, the UK F-35 purchase is all up in the air.

 

The "138" number is probably entirely unfeasible. Many observers have been aware of this for years now, and I’ve written and tweeted about it many times over. Lately, with reports in the Press, it has emerged that this awareness is becoming very much “official” with the Integrated Review discussion reportedly focusing on having 70 accepted as the “minimum credible fleet size” to be pursued.

To me, and to several other observers, this is no surprise and no shock. Arguably, it is merely a measure of realism.

 

For several years now, the number 138 has arguably had zero actual relevance in regard to what the operational fleet can aspire to be.

The infamous key phrase to hang on to the number 138 was “the aircraft will be purchased over the life of the programme”, means the numbers would be spread over many years. Thanks to the MOD’s usual vagueness and deliberate murkyness, nobody even knows how many years.

The annual Major Projects Report has the F-35 programme end date as 31 March 2035, but how this should be interpreted is open to debate. Would 2035 see the last delivery? If so, the last order would have to be placed 2 years earlier, in 2033. Or would 2035 see the last order placed?

According to other interpretations, “over the life of the programme” should be read as “out to the aircraft’s Out of Service Date”, which is tentatively scheduled for 2048 as of these days (with the understanding that this will move to the right by potentially decades, as always happens).

Clearly it would be spectacularly dumb to be purchasing jets just before removing the fleet from service, and there cannot be absolute certainty that the F-35 production line would still be open at all by then. There are fair chances that F-35s will still be in production, but it’s just an assumption.

Not knowing on how many years the purchases are going to be spread out obviously makes it impossible to gauge the relevance of the total number. If purchases are spread out over decades, the actual available fleet will never grow beyond a fraction of the total.

Purchases very late on in the life of the programme might well be replacement airframes to make up for operational losses, or new-build machines purchased instead of replacing early production lot aircraft on value-for-money considerations.

 

In short: 138 was never going to be the F-35’s in-service fleet size.

138 F-35 would suffice for 6 or 7 squadrons, maybe more, but there is no manpower and no infrastructure for that to happen. That's why the number is meaningless and has been for years.

We have only ever been told there would be 4 F-35 squadrons.

 

And it would be very difficult indeed to create more.

The RAF currently has 7 frontline TYPHOON Squadrons and has repeatedly made clear that they want to try and squeeze an 8th one out, from a fleet of 140 machines (160 have been procured in total, but 1 was written off after a belly landing at China Lake in 2008; 3 were instrumented production aircraft for development and the Tranche 1 two-seaters have been withdrawn and dismantled for harvesting spares).

If you had 4 F-35B Squadrons, the total is 11 to 12 frontline Fast Jet units. The RAF hasn’t had this many from before 2010. And, notoriously, in 2010 the RAF shrunk down by 5,000 posts.

There clearly does not seem to be any manpower margin to create more Squadrons, even if there was the money to procure the airframes.

 

The fact that 70 F-35s are being described as the bare minimum requirement offers hope that the number of squadrons to be formed is still 4. A fleet of 70 to 80 jets should be enough to deliver that kind of force structure.

 



But again, there are too many things we do not know. One being the number of years in which the force will be built up. If 70 merely replaces 138 as a “through life” objective, we might well never see that many in service at the same time, and thus the number of squadrons would have to reduce.

If purchases are slow, the last 2 Squadrons might form only very late on, perhaps even beyond 2030. That would be very, very late indeed.

 

“70”, “138”, or whatever other number of airframes is individually almost meaningless.

If the Review finally gives us a realistic plan for the formation of the last 2 planned Squadrons by 2030, I invite everyone to leap with joy. 617 Squadron is operational, 809 will only stand up in 2023. What we need to see mapped out is the road that brings us to a third and a fourth frontline squadron.

The exact number of airframes is entirely secondary. Obviously, the more are purchased the easier it will be to form and sustain the fleet in the long term, but adjustements can be made. Less “attrition” aircraft purchased might be balanced by a greater investment in spare parts. Eventual losses should be faced with an eventual, occasional future purchase from a hot production line rather than by acquiring spare airframes early on, which will be difficult and expensive to keep up to date as the aircraft evolves.

 

I will be happy, quite literally, if people stop pestering us with a meaningless 138 number without dates attached to it in favor of an actual plan to get to 80 in 4 squadrons in an acceptable timeframe.

In fact, the UK should not commit to a fixed number of F-35s, and especially not such a high number. There will be time to make future purchases from a hot production line (for example if TEMPEST encounters delays, which is, let’s be honest, almost certainly going to happen; it always does) without having to unnecessarily constrain the Equipment Budget right at this time. 

 

My chief worry is that cutting back on the distant, long-term total number is in itself going to generate zero savings in the short term, were the financial problem sits. What needs to be settled satisfactorily is the timeframe 2023 – 2030 (2035 at the very latest).

This is especially true because the closer we get to 2030, the more F-35 will have to contend with TEMPEST for the same slice of budget. If you want TEMPEST by 2035 it means expenditure ramps up very quickly indeed. The UK has pinned on TEMPEST the future of its Aerospace industry and of its international credibility as a country able to lead a programme of this complexity. As a consequence, TEMPEST is an absolute priority and F-35 will inexorably tend to get crushed under its growing burden.

 

The real question is: can the UK afford another circa 40 F-35B by 2030? It would require the purchase of 5 jets per year beginning in 2023. This should not be unfeasible (the UK has ordered 6 or more jets in every year from 2019 to 2022) and is less aircraft per year than several other F-35 countries regularly order, but we know that the Combat Air budget is not looking very roomy in the next years and the RAF will have TYPHOON upgrades to fund; TEMPEST to develop and, hopefully, the LANCA unmanned loyal wingman to acquire. The same, small share of money will have to be cut up among these main programmes.

The situation is thorny enough that, I will repeat it again, 70 jets should make us all rejoice, provided that they are acquired over a reasonably short timeframe.

The real nightmare scenario we face is the impossibility to even do that.

 

Late 2020s and early 2030s will see TEMPEST expenditure ramping up more and more. As a consequence, I feel that the bulk of F-35 procurement will be over by 2030, by lack of money if not by design. Every effort, in my opinion, should be directed on getting those other 2 Sqns of F-35Bs by that date. And it is not going to be easy. It is in no way a given.

It is to be hoped that getting to 4 F-35B Squadrons will still happen, and that it will happen in a reasonable timeframe. The RAF will be severely short of Stealth capability until that happens, and the aircraft carriers will have a very hard time embarking a meaningful air wing. It would be a very embarrassing situation, as well as a dangerous one.

 

One welcome side effect of this much needed injection of realism is the fact that, if the RAF is at all sane, this will be the end of the ridiculous “Split Buy” idea. The fleet needs to be made up of one type, the B, which can work from the carriers as well as from land.

The F-35A is individually less expensive, yes. Has a slightly longer unrefueled range, yes. And can carry larger weapons in its internal bays, yes.

While these justifications are all true, the numbers (money, manpower and thus number of Squadrons, number of airframes) were never  sufficient to truly justify a split buy and were never going to be unless there was to be no TEMPEST. Splitting the fleet would result in tiny, operationally-ineffective fleets and in near-empty aircraft carrier decks.

The F-35A’s “advantages” would be totally illusory as well: the aircraft would be cheap, but there would be new costs associated to running two separate sub-fleets. Despite much commonality, F-35A and F-35B are not and will never be the same thing and there would be a constant fratricide struggle for securing a slice of the budget for covering the respective “unique” needs.

Moreover, the RAF does not own or plan a single payload which would fit the F-35A’s larger weapon bays but not the B’s ones. The large payloads are too large for both; the others fit the B just fine. So that is, and has always been, a moot point. Looks good on paper but never meant a thing in the UK’s context.

 

Hopefully, with the formation of the next two Squadrons now officially in jeopardy (unofficially, they have been uncertain for years to all who could look at the facts with the necessary realism) and the total number of airframes being revised downwards by 50% or even more, everyone will realize how utterly demented the idea of a split is.

 

The last time there was a 2-Squadrons small fleet, said fleet was offered up for the ritual slaughter because it was “too small to be sustainable and to support any sort of enduring operation, at sea or on land”. And honestly, it was. 2 Squadrons are too few to rotate in and out of task in a sustainable way. 4, ideally 5, is the number you are looking for.

That ‘s why the reduction of the number of squadrons in 2009 sealed the fate of that fleet, well before the 2010 SDSR even started.

That fleet was the HARRIER GR9 fleet. The number of airframes, ironically enough, was still 72 when the cut was decided. The number of crews and frontline squadrons operational on the type determined the cut, not the number of airframes.  

 

Whoever suggested that splitting the F-35 purchase in two to create not one but 2 barely-sustainable small fleets, both too small to meet their requirements, was being very unwise when 138 jets were still the assumption.

Whoever was to still insist on a split buy now would be, and I will unapologetically say this no matter how many might feel offended, an idiot. There really isn’t a kind way to say it.

 

 

CHALLENGER 2 Life Extension Programme

 

There is now a consensus on the fact that, if CHALLENGER 2 cannot be very decisively upgraded, it might be better to just remove it from service because it is suffering severe obsolescence, including in its main armament. The problem is well known: the rifled gun is a british oddity which has the drawback of employing two-piece ammunition. This means that the armor piercing rod cannot be lenghtened, creating a more effective round and putting an hard ceiling to the tank's lethality. It also means that there is no way to adopt the extremely flexible new generation of programmable, multi-mode explosive shells which are critical to counter reinforced positions and urban obstacles. 

I do not disagree on this assessment. The CHALLENGER has aged badly. It is also underpowered: its 1200 HP engine was arguably already inadequate when still new, especially considering that the british tank is heavier than its 1500 HP-powered counterparts. More weight and less power are a bad combination, that even the hydrogas suspensions cannot balance. 

What is extremely irritating, if not downright dishonest on the Army's part, is to come up with this radical assessment only now. Up to literally last year, the official position was that CHALLENGER 2 had no major lethality problems and only needed a refresh to optics, communications and electronics. 

For years i've written about the CR2 LEP and campaigned for the Gun and Powerpack to be at the very heart of the programme,. I went so far to suggest that LEP had no real sense to exist if the main issues were not to be considered. I did so before it was even confirmed that Rheinmetall was bidding a re-gunned upgrade solution, as this 2016 article shows

Yet, the Army initially launched LEP as a very limited obsolescence-removal effort, and it is only thanks to Rheinmetall's courage to show up with a new turret with the smoothbore 120/55 (what the Army wanted but did not dare asking for) that we are now looking at a LEP that, if it will progress, will actually mature the CR2 into that "world beater" it was falsely described as for all these years. 

Specifically, the latest Major Project spreadsheet, released in July and current to September 2019, reports on the sudden "change of heart" regarding CR2 LEP: 


The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/07/28, has lengthened by 791 days since last year's Q2 1819 date of 01/06/26, due primarily to the following factors;


 - In this period the programme's scope was expanded from obsolescence only to include enhancements to its lethality and survivability. The expanded scope has also lengthened the time to complete the work and increased cost over the assessment, demonstration and  manufacture phases.  These dates are currently subject to negotiation and will be confirmed when the full business case has been approved. 



The baseline Whole Life Cost at Q2 1920 (30th September 2019) is £1,304.19 m, due primarily to the following factors;


 - This reflects the financial position following the capability uplift endorsed by HMT. This sees a capability uplift and extension to the Main Battle Tank out to 2035.




Speaking to the Defence Committee, the Chief of the Defence Staff, previous Chief General Staff and mastermind of Army 2020 and Army 2020 Refine, General Sir Nick Carter, said that it has been "realized" that the CHALLENGER 2 needs the lethality upgrade to effectively face russian armor. 


I think the requirement is now pretty clear, and that is one of the reasons why Challenger 2 is taking a long time. It is because there was this realisation that the programme was not ambitious enough. It needed a smoothbore gun. It needed the ability to put a missile down that barrel to overmatch Armata, as you rightly describe. It needed its protection levels to be significantly enhanced. So the requirement has evolved. I think the Army now has a very clear idea of what it needs. The trick now is to find the resources to get behind what
it needs.

[Note: the mention of a "missile" can be interpreted as a new requirement for a gun-fired ATGW missile, but it seems that Carter was just being very "byzantine" in describing what is just the APFSDS round, but the longer-rod one enabled by the smoothbore cannon]


Carter's words do not reflect positively on him and on the Army as a whole. If they couldn't see the need for upgrade before 2019 they were not doing their job properly. 

The Army, of course, knew perfectly well that the gun needed to change: it was, in fact, looking for solutions already in the early 2000s, when the Challenger Lethality Improvement Programme was tentatively launched. It was in 2006 that a CHALLENGER 2 was first retrofitted with a 120mm smoothbore gun, in fact. Swapping the gun was never an issue: the issue was in the complete redesign needed to fix ammunition storage spaces and make room for the much longer single-piece rounds. This is the main issue to this day: the driver behind the need for a new turret. 

Have they forgotten everything about that phase? Was Carter being overly kind to his political masters, to the point of having the Army shouldering more blame that necessary? He was not shy earlier in the same hearing saying that it depends on money: why, then, say something as hopelessly stupid as this about CR2 lethality problems suddenly "dawning" on an oblivious Army...? 


The handling of the whole CHALLENGER 2 saga is horrible, and it makes me think very unpleasant things of the Army and of the current Chief Defence Staff. 

It strikes me as a binary choice: either there is staggering incompetence at play, or there is a fundamental dishonesty. 

The sudden "extremism" on the CHALLENGER 2 LEP issue at a time in which the risk of seeing the whole fleet axed for real is staggeringly elevate is very puzzling indeed. Up to last year they were fine with doing little more than changing radios and thermal cameras; now it's all or nothing. 

It's a terribly risky gamble. 

If not a deliberate ploy to direct the incoming cuts exactly in that direction. 

It feels like the 2009 reduction to the number of HARRIER Squadrons, which effectively made cancellation of the whole fleet the following year a foregone conclusion. 


Maybe i'm being overly harsh. Maybe my suspicions are unfunded. But it very much smells to me like an underhanded move on the part of what i suspect is a "wheeled faction" which seems to have gained the upper hand within the Army since 2015. 

I've long suspected the existence of a fundamental disagreement at the heart of Army planning between Tracks proponents and Wheels supporters. The dramatic change of priorities in 2015, just after the massive AJAX contract was signed, will always have me wondering. 


It is safe to say that, whatever the final outcome, as far as i'm concerned, the sooner General Carter's era ends, the better i'll feel. The original Army 2020 plan was a mess that had to be fixed with a long list of U-turns in the following years, and Army 2020 Refine now risks to destroy what's left of the British Army. It could hardly have gone any worse than it has. 


The prospect of the Army losing its MBTs and IFVs is one that is very hard to stomach. The destructive effect of such a decision would ripple farther across the force structure than most realize. It would be a life-changing injury for the Army. In the graphic below, I tried to evidence some of the less immediately-evident ramifications of such a scenario.

 

 

 

This graphic shows some (not all) of the true implications of doing away with the tank.
This graphic shows some (not all) of the implications of doing away with the tank. 

 

What is most infuriating about the tracked heavy armour situation is that the Army has laid its head into the guillotine all by itself. As we wait to see if the blade descends or not, we might contemplate the fact that in late 2019 the MOD signed into a 2.8 billion pounds contract for 523 BOXERs, as part of a Mechanized Infantry Vehicle contract which has an overall budget for procurement and first few operational years that is given as 4.6 billions in the latest Major Projects spreadsheet.

It is a fact that the Army put itself into this thorny corner by making BOXER its absolute number 1 priority, despite knowing that these 523 vehicles are a mere start, insufficient in numbers and variants to cover the need of the 2 STRIKE brigades.

 

In an alternate universe, the British Army has not strayed away from the 3 armoured  brigades of Army2020; has not yet bought a Mechanized Infantry Vehicle (MIV) and is making do with MASTIFF in its place but has but those billions into continuing the job it had started on Armour, getting CHALLENGER 2 LEP and WARRIOR CSP under contract and is, as a result, riding out the Integrated Review with a lighter heart.

This is a fact, and no hindsight is required. I’ve been shouting warnings for 5 years about the STRIKE adventure, as you will know if you have been following me for a while. I’ve collected hate from multiple corners, but I’m sadly, once again, proven right.

Believe me, I would very much like to be proven wrong in these cases, but it does not happen.

In pursuit of a concept that remains uncomfortably vague, the Army has put its core capabilities into a guillotine.

 

The MBT – IFV combo is the heart of any modern army. As the graphic hopefully helps understand, the ramifications extend across multiple formations and roles. All of that would have to be re-imagined and re-built around new concepts and new vehicles. This would be very expensive… and thus would likely not happen. Not anywhere near the scale that would be required.

 

Doing away with MBTs would require a very honest and very significant downgrade to national ambitions; a complete re-write of how the Army fights and against what kind of enemy it can go; and the rebuilding of the force structure around new and different vehicles and sources of firepower.

 

The problem is the UK would probably do none of the 3. Multiple governments have shown not to possess the necessary coherence and honesty to admit that having less capability only ever means doing less, not more. And the expenditure required to rebuild the army would be monstrous. If the tanks are cut for lack of money, you cannot possibly expect big amounts of money to be available right away, if ever, to launch a complete reconstruction of the force.

 

The Army would be left with BOXERs for some 4 infantry battalions, and plans for 4 regiments on AJAX. And that would be it. Half of 3rd Division would virtually cease to exist in one go, and since 1st Division is mostly only an empty shell containing multiple Light Role infantry battalions, there would be very, very little left to work with.

 

This is not the time to lose the MBT. Such a decision would also shut Britain pretty much out of any attempt to secure an industrial role in future MBT programmes. One popular option that gets mentioned a lot is “joining the franco-german Maing Ground Combat System”. There are multiple issues with this: France and Germany are not really looking for partners to treat with any equality. Industrial opportunities for other countries will be extremely limited. The UK would be welcomed as customer, not as partner.

And even if this was to change, the UK will have very little chance to secure any important industrial role simply because the relevant capabilities in this sector will have gone.

 

Rheinmetall BAE Land Systems is offering an incredibly fascinating option for a deep modernization of CHALLENGER 2: a whole new turret. This solves the ammunition problem of the CR2, which is the only NATO tank that uses 2-piece ammunition, which prevents the armor-piercing rod to be lengthened, thus hard-capping lethality. The CR2 ammunition is increasingly obsolete and is an oddity that offers zero commonality to NATO stocks and developments. No path to greater armor-piercing capability (important in the light of new Russian developments) and no chance to adopt modern programmable explosive rounds either. The new turret has been tested on a CHALLENGER 2 hull armed with the NATO standard 120 mm smoothbore and the very latest ammunition.

The new turret also comes fully digitalized and with modern systems, including new optics shared with AJAX, offering logistical commonality.

 


The first LEP demonstrator by Rheinmetall (now RBLS) focused on a "conservative" approach by going with the standard 120/55 smoothbore. 




The second demonstrator, publicly unveiled only last July, is more radically new as it comes with the 130/51 smoothbore. The turret is the same, but fitted with extra armour on the front and sides, possibly also as a form of counterweight for the cannon. Rheinmetall is betting big on this turret and this cannon; for them the CHALLENGER 2 LEP is an exciting opportunity, but the turret is very clearly aimed at future developments (MGCS) and at the LEOPARD 2 upgrade market. The first CHALLENGER 2 demonstrator was showcased at the NEDS show in the Netherlands in 2019, along with the 130 mm shell. It was a hint of what was coming, and a clear sign of the turret being meant for far more than just CHALLENGER. In the Netherlands, nobody cares about CHALLENGER. LEOPARD 2, on the other hand...


But more than that, the new turret is a product that Rheinmetall is using to develop next-generation solutions that could find a vast market in the future as LEOPARD 2 customers around the world take an interest.

 

In July it was revealed that the new turret, mounted on a CHALLENGER 2 hull (presumably the 2nd of the tanks given originally to Rheinmetall to become demonstrators for LEP proposals) has been trialed with the new 130/51 gun, which offers an estimated 50% lethality boost.

This new cannon is not yet a given for the franco-german MGCS, but is expected to eventually be officially picked, and it is assumed it will become a NATO standard in time as a consequence.

 

Clearly there is a risk that, in the end, the new gun won’t be so widely adopted. Or perhaps it will only be adopted over many years.

Then again, every risk comes with an opportunity. There is a more than real possibility that this new gun will only grow in relevance in the future, and that it might pick up big export orders.

If the UK became the launch customer and got RBLS to launch production of the turret, gun and ammunition in the country, the heavy armour industrial capability of the country would go from moribund back to very healthy. It would be much easier to secure a role into a future tank programme too. Perhaps even have a leadership position into an alternative programme to the franco-german one, with countries like Italy and Poland not at all thrilled by the virtually inexistent role for their industries if they were to buy into the MGCS.

Rheinmetall is likely to be sympathetic with a UK base for the new turret and gun because London is less likely to impose bans that prevent the company from bagging massive and lucrative middle east contracts. The german parliament has killed off several opportunities that Rheinmentall would have loved to pursue.

 

There is a huge opportunity within reach. In order to make CHALLENGER 2 fit for the next 2 decades, the new turret is a must. And whether it is armed with the 120 mm or the new 130 mm, new ammunition will have to be part of the expenditure. Arguably, this is exactly the time to be bold and adopt the new gun.


 

 

MIV and WARRIOR

 

MIV is a huge part of why the Army’s budget is in trouble, but BOXER is a good vehicle, and there are understandable reasons for wanting wheeled armour. Ideally, there should be both fully tracked and fully wheeled brigades, but the British Army does not have the resources to make it happen anytime soon, and so a different approach is required.

 

As I’ve written multiple times, I think the best compromise that can be pursued from where the Army currently stands is the French one. This means giving up tracked IFVs in favor of wheeled ones.

 

WARRIOR CSP is not yet under production contract, and since the base hull, even after the upgrade, shows all the limitations of age and of a powerpack that is not being replaced with a more modern and powerful one, it might be wiser to just abandon the project and the whole fleet.

 

The money (more than 800 million are earmarked for the WCSP production), the 40mm gun and the turrets should instead be put into BOXER.

Integration of the turret into a BOXER module should not be overly complex. Lockheed Martin fit one onto a BOXER and carried out some early trials, including weapon firings, as far back as 2015. While these industry-led demonstrations involve integrations that are far less mature than one might think, there should be no reason for the turret not fitting on a troop-carrying module.

 

The turreted BOXERs would then be mixed with the APCs already on order with the aim of eventually forming 8 battalions: 2 for each Armoured and Medium brigade. There are many reasons for me to formulate this recommendation, but they all more or less stem from the following main considerations: the Warrior hull is old and tired and the CSP does not quite solve that, nor does replace the old powerpack; an all MIV fleet helps standardization; having the infantry on wheels helps the Army be more self-deployable and means the precious few Heavy and Light Equipment Transports (89 and 77 respectively) are free to focus on moving the MBTs and other tracked platforms, such as AJAX and TERRIER; having at least a portion of the BOXERs well armed with a 40mm gun means that, apart from being able to get to the fight, they will also be able to fight. The current MIV, armed like a SAXON, can get there but can’t get into a fight, only drop its infantry a safe distance back. 



With thanks to Jon Hawkes (@JonHawkes275) who dug up these old slides and posted them on his Twitter. He is a must-follow in the field of Armour. 

Finally, plans for a new tracked support vehicle to replace FV432 seem to have died entirely, and it would border on ridiculous to field a 28 tons tracked Warrior supported by wheeled 8x8s weighting close to 40.

 

Boxer is a modern and well protected hull, and if the Army cannot afford a proper split of tracks and wheels, on balance of merits and defects, wheels should probably take precedence. This is what France has done with the VBCI replacing the last tracked IFVs of the Armee de Terre. 

It is a compromise, since there a tracked IFV will always have a greater ability to run down obstacles and dug-in positions and will always have greater all-terrain mobility than a wheeled platform, but I feel it would be a good compromise all the same.

 

Again, a priority for me would also be to re-evaluate the variants of MIV to be procured, reducing to the bare minimum the number of ambulances and command posts in favor of pursuing instead a 120mm mortar and an ATGW variants as well as, potentially, more APCs / IFVs to increase, if at all possible, the number of mechanized battalions in the Army. With over 500 vehicles already on order, it should be feasible. I’ve written about this in greater detail in a previous article.  

 

The Ambulance role and, wherever possible, the C2 role would be instead “offloaded” onto much cheaper Multi Role Vehicle Protected variants. Regarding MRV-P, I’d personally urge the Army to finally proceed with the programme with the aim of rationalizing the current dog’s breakfast of multiple “mini” fleets, getting rid progressively of Husky, Panther, DURO, Pinzgauer and part of the Land Rovers.

My favorite for Group 2 would be the Thales Bushmaster, to be assembled in their Glasgow plant as promised by the company and by the Australian government.

 

I do realize, however, that a quiet, unspoken further delay to the whole of MRV-P is likely, as it defers expenditure into a vague, undetermined future.



Further pre-Integrated Review reading material: 


- Amphibious without ships  - There is no amphibious capability without adequate ships and ship to shore connectors. A look at the USMC reforms and the question mark over the Future Commando Force


- A different angle to "difficult choices" - If the UK really doesn't want to spend money to maintain its capabilities, it needs to at least be wise on what it invests on. Building on strengths is more cost-effective than trying to reinforce weakness. 


- The many weaknesses of STRIKE - 5 years on, there is still not a consensun on what STRIKE is actually good for. And it is becoming painfully clear just how much it might cost the Army to pursue this plan. 


- Towards the SDSR 2020 - This was written in December 2019, before the COVID spending generated the current psychosis around public expenditure. While we wait to understand if HMG chooses to obsess about Debt reduction and launches a new Austerity drive (hopefully not), the overview of the main issues remains valid. 

Saturday, July 21, 2018

British Army going wheeled?



British Army going wheeled?

The MOD has released to the public a voluntary ex ante transparency notice in which it reveals that it has asked the Organisation for Joint Armament Cooperation (OCCAR) to enter a contract for the delivery of between 400 and 600 Boxer 8x8 for the Mechanised Infantry Vehicle programme.

The notice says that 4 variants are requested, in addition to driver training vehicles, reference vehicles and related support.
The four variants are not detailed, and subsequent reports are not in complete agreement. APC and Command variants are a given, and there seems to be a consensus on the third variant being the Ambulance, but the fourth variant is given as either a Mortar Carrier or an “Equipment Support Vehicle”, which presumably would combine Recovery and Repair functions in a single vehicle. It must be noted that both Mortar and Recovery/Repair variants of the Boxer aren’t yet in production and have not been ordered by anyone, although the development of both is a distinct possibility and one of the latest Boxer customers, Slovenia, has expressed a mortar requirement.
Naturally, the development of new mission modules is a possibility and could indeed represent a chance for the british industry to develop something that could be exported to other users.

What is most interesting in the notice is the number of vehicles that are anticipated: a first batch of at least 400 vehicles is significantly larger than the expected 300 – 350 that were commonly mentioned in recent times. 400 vehicles would comfortably cover the “Strike” requirement of 4 battalions, with substantial room for additional vehicles which would cover, probably, the replacement of FV432 variants in other formations; beginning, judging from the variants, with the FV432 ambulance which is found in tank regiments, armoured infantry battalions and armoured medical regiments. The Warrior CSP requirement is understood to be for 380 vehicles, of which 245 IFVs and the others in Joint Fires direction (FV524 variant) and the 522 and 523 REME variants. The number of battalions is the same, 4, so it is immediately evident that even the lowest quantity mentioned in the notice includes vehicles for roles outside the STRIKE infantry; or, less likely, an ambition for additional mechanized battalions.

The notice specifies that additional variants and requirements could follow, and it specifically mentions the adoption of a “medium gun”, basically implying an IFV variant.
Moreover, the notice specifies that the MOD is asking for the option of ordering up to 900 more vehicles, for a total of 1500.
1500 does not appear to be a casual number: the Army has been planning for 380 upgraded Warriors; declares on its website 409 FV432 still in use; and fields / stores a fleet of 305 Mastiff Troop Carrier Vehicles plus 127 specialistic variants (Enhanced Communications Variant, Interim ECM, Interim EOD [possibly 23], ambulance, Protected Eyes / Praetorian) plus 118 Ridgback Troop Carrier Vehicles and 51 specialistic variants (Command, Ambulance), supported by 125 Wolfhound (Utility and at least 44 between Military Working Dog and EOD).
The total is 1515. Coincidence? Probably no.

It seems more and more likely that the troubled Warrior CSP will, in the end, be cancelled. This MIV notice seems to prepare for a WCSP cancellation scenario by making provision for the numbers and the addition of a medium gun.
Moreover, it clearly includes numbers sufficient to cover the replacement of all remaining FV432 variants as well, which means that the Armoured Battlegroup Support Vehicle, officially “descoped” in 2016 as part of cost-growth management measures within the programme “Armoured Infantry 2026”, might just be dead for good, in favor of a huge MIV purchase.

The Warrior CSP has repeatedly missed its target dates and remains without a manufacture contract. Work is advanced on the turret and the 245 CTA40 guns are under contract, but it is not impossible to imagine a scenario which migrates the turrets onto Boxer hulls.
Lockheed Martin, perhaps genuinely aiming at future MIV requirements or perhaps shielding itself from the possibility of a WCSP cancellation, has already showcased its Export version of the turret on a Boxer.

The replacement of WCSP with more MIV would put the British Army on the same path chosen by France with the VBCI, which entirely replaced their own tracked IFVs. Moreover, the replacement of FV432 with MIV variants would represent a rather dramatic shift in favor of wheels, completely changing the scenario that currently exists within the British Army.   
Such a change of heart would do wonders for commonality and obsolescence removal from what is an aging fleet of fleets, but it would also sideline Ajax even further, leading to further questions about where the tracked heir to FRES should sit.
Ever since the SDSR 2015 was published, Ajax has looked more and more lost, ultimately resulting in its “re-branding” into a “medium armour” capability which has, it is fair to say, convinced very few people.
I’ve been and I continue to be a huge critic of the idea of leaving the armoured infantry brigades devoid of their own recce cavalry, especially if the reason to do so is to use the Ajax’s 40mm gun in support of toothless APCs in Strike Brigades. That, in my opinion, is the way to ruin both brigade types at once, destroying the capability of both.

Boxer showcased with the LM Export turret with CTA 40mm and double AT missile pod. 

Boxer with the LANCE turret with 30mm and Missiles, as selected by Australia. The module is being lifted out of the craddle. Or lowered in, depending on how you want to see it! 

A reassessment of how the various fleets will work together and how the various requirements can be covered has been a clear necessity for years, and has been a recurring theme in my posts on armour plans. A “full-MIV” scenario is not a bad outcome, and this notice seems to prepare the ground for such an approach, but it is absolutely regrettable that in the meanwhile hundreds of millions will have been expended for near zero return. If WCSP is cancelled, the Army will have once more wasted years and hundreds of millions for nothing.
Moreover, it is extraordinary that Ajax took less than a year from contract award to become a “problem”; a platform desperately looking for a role and place which is not in conflict with everything else.
Another rational alternative would be to renegotiate the Ajax contract if possible and add an IFV variant, which is being offered by General Dynamics for export, including to Australia. If Warrior CSP was cancelled in favor of an Ajax IFV variant, the british army could then concentrate all tracks in the armoured brigades and all wheels in the Strike brigades, which would enable the two formations to truly exploit their own strengths without the compromises imposed by a sub-optimal mix.
I can’t help but say it again: that the army has gotten this far without being able to formulate a comprehensive plan is an extraordinary failure, born not so much out of lack of money (Ajax is anything but cheap) but out of lack of long term vision.
I’d “gladly” sacrifice WCSP if it meant finally making a choice and getting on with it. This is the kind of thing that the Modernising Defence Programme should be about, but any residual bit of confidence in the process has been disintegrated by the insultingly pointless “statement” released this past week.


A variety of internal arrangements are offered. The Australian CRV comes with four dismounts, but an IFV variant with manned turret and a full team of 8 dismounts is also a possibility. Warrior CSP would have six dismounts; if replaced by more MIV it might allow an uplift in the number of dismounts without armoured infantry battalions

The Germans giving a visual demonstration of the payload of a Boxer APC

The notice notes that a 1500 vehicles programme could mean an expenditure of 11.5 billion over two decades. Is this unaffordable? For sure it would be challenging. However, in April 2014, the MOD decided to split the massive “Mounted Close Combat Capability Change” programme into four:

-          Armoured Cavalry 2025
-          Armoured Infantry 2026
-          Armour; Main Battle Tank 2025
-          Mechanized Infantry 2029

The date at the end indicates the desired completion time. The budget for the Mounted Close Combat super-programme was 17.251,83 million pounds, with a project end date set for 31 december 2033.
Data released this year, and current to September 2017, reveals that the Armoured Cavalry programme has a budget of 6258,19 million, for procuring, putting in service and supporting for the first few years the Ajax fleet.
The Armoured Infantry programme was composed by Warrior CSP, but was also meant to include the Armoured Battlegroup Support Vehicle programme. The budget was consistently given as higher than 2 billion, even when ABSV was descoped and pushed to the right with the ambition of becoming its own Categoary A programme. In the latest report, pretty much all data, including the budget value, is not disclosed for reasons of “commercial interest”, as the MOD is locked into discussions with Lockheed Martin, the prime contractor for WCSP.
The budget for the Challenger 2 LEP is also not disclosed although in previous years it danced between 700 and 900 million.
Mechanized Infantry 2029 seems to now be just “MIV”, and naturally, all numbers for it are hidden as well.
A part of those 17 billions has been of course expended, but the new “super-MIV” programme would extend past 2033 (significant costs are related to support in the long term, not to procurement). In theory, there were always going to be significant sums available for armour programmes, but keeping track of it is simply impossible due to the insufficient and often contradictory information released by the MOD.
Boxer modules already ordered by other countries. 
A Boxer module

Boxer module on its container-like frame for transport 

Industrially, Rheinmetall / ARTEC have put together an impressive proposal, with 100% assembly in the UK and a commitment to manufacture 60% of the vehicle value in the country. Before the MOD choice was announced, one of the two partners in the ARTEC consortium, Krauss-Maffei Wegmann (KMW), had already funded new tools at William Cook’s Sheffield and Leeds factories to prepare to manufacture the high strength steel castings, bullet and blast proof, for the Boxer.
A production line will be stood up in the UK, where “most” of the design work for eventual new, British-specific mission modules would take place, along with construction and integration of modules and final assembly of the vehicle.
ARTEC has taken onboard BAE Systems, Pearson Engineering, Raytheon U.K. and Thales U.K as partners for the Boxer programme, and a sizeable production run would bring a lot of work to the sector, for many years.

So far, Germany has ordered 272 BOXER starting in 2009, with a follow-on order recently for another 131. The Netherlands purchased 200 and the last delivery has just taken place. Lithuania ordered 88; Australia selected Boxer for its army reconnaissance vehicle requirement for 211 vehicles and 223 modules and Slovenia has selected the Boxer for its battlegroups and plans a first batch of 48 IFV.
The UK’s order will at least equal Germany’s and could, depending on follow-on decisions, become by far the largest. Indeed, if the options were to be exercised, the UK’s order would swell the Boxer fleet until it is the second largest 8x8 programme in NATO after the US Stryker.
This, obviously, would have a technical and economical impact on UK’s capability in the armoured vehicle sector.


Boxer's win in Australia after a long selection process was an important factor in the British Army's own decision. It could be another key area of cooperation after Type 26

Capability-wise, the Boxer is a proven solution and was all along the candidate with the best growth margins. Reportedly, the UK will go from the start with the “full-fat” variant sized for 38.5 tons gross weight, giving ample margin to add new capability, including turrets and weapons.
The Boxer notoriously uses a common hull which is “missionized” thanks to modules installed in the back cradle. This modularity is unlikely to ever be a major factor during operations (“swap module and role mid-way through an operation”) but greatly eases the addition and evolution of capabilities during the service life. The modules can be detached from the hull and mounted in container-sized cradles for transport or to be operated inside bases, once hooked up to power and services. This potentially eases training and can reduce somewhat the requirement for hulls: the Australian Army, notably, somewhat downsized its planned purchase (from 225 to 211 vehicles) and procured more mission modules than hulls.

Generic Vehicle Architecture-compliant modules for the UK can be developed and installed over the common hull.
If Warrior CSP ends up cancelled, one particularly important variant to be acquired would be the Joint Fires variant, and Australia's work in this area could bring beneficial lessons.  



A different British Army?

The Army could be the service bringing the most changes to the MDP table. Jane’s is reporting that Gurkha numbers will swell further, probably because there is never a shortage of willing Gurkhas to recruit. The biggest novelty is that next year Gurkhas will stand up their own Specialised Infantry Battalion. Not clear yet if it’ll be the “optional 5th” which was always given as a possibility or if they will replace 2 LANCS as the 4th such unit.
2nd PWRR converted to Specialised Infantry role this year, following 4 RIFLES and 1 SCOTS.

The rebuilding of the Gurkha numbers after the cuts ordered in 2011 had already been announced and i had written about it already two years ago. 
What has since been detailed is that 2 additional Gurkha squadrons will be raised to strengthen 10 Queen’s Own Gurkha Logistic Regiment, while 2 extra signal squadrons are standing up: one within 3rd UK Division Signal Regiment (249 Sqn) and one within 16 Signal Regiment (247 Sqn). Gurkha engineers growth is also expected, perhaps with a new squadron to be formed within 36 RE.

It is also now official that the Wide Wet Gap Crossing capability is to grow, with the stored M3 being reactivated, and it has been announced that the capability will stay put in Germany, along with vehicle storage and a presence at the Sennelager training facility. Details are still scarce: in particular, the M3 permanence in Germany means a change of plans for 75 Royal Engineers.

The Royal Signals are about to disband the short-lived 2 Signal Group, which was created within 11 Signal Brigade to control the reserve signal regiments under Army 2020. Reserve signal regiments are being resubordinated as their roles expand (notably with FALCON training and equipment). 32 and 39 Signal Regiments, of the reserve, have resubordinated to 1 Signal Brigade in support of ARRC and High Readiness formations. Further changes might follow as the Royal Signals looks at the creation of hybrid regiments of regulars and reservists.
10 Signal Regiment, given its specialized roles (from reserve ECM to installation specialists), is resubordinating directly under 11 Signal Brigade, while 37 and 71 joint the regular regiments within 7 Signal Group, 11 Signal Brigade.
The Army’s Information Manoeuvre Strategy which was half-announced by Fallon has not surfaced yet, but could bring great changes. According to what Fallon said at the times, it would bring together the Corps of Signals with the Military Intelligence Corps, and also bring the creation of a second EW regiment. Nothing has been heard or seen since, but hopefully one day we’ll know more.

The Royal Engineers are about to reform 35 RE into an EOD & Search regiment, joining 33 RE in the role, at the cost of one armoured close support engineering formation. 33 and 35 RE will contain the Regular EOD squadrons, while Reserve EOD will be once more centralized in its own regiment, 101 RE. This reverses, once more, an Army 2020 decision which had turned 33 and 101 into Hybrid regiments. One can’t help but notice the completely different directions followed by Signals and Engineers…
In the meanwhile, 12 HQ & Support Sqn has stood up anew in 23 (Parachute) RE, after the regiment took in some extra manpower as part of Army 2020 Refine. 12 had disbanded in 2013 as part of Army 2020 changes. 
Next year it is expected that 28 Royal Engineers will stand up as CBRN formation, presumably pulling in FALCON Sqn, Royal Tank Regiment (Fuchs and wide area surveillance) and the Light capabilities of 27 Squadron, RAF Regiment, which has already absorbed 26 Sqn and is now standing up a Parachute capability for support to high readiness formations.
The formation of a (joint?) CBRN regiment is, of course, another U-turn over 2010 decisions. Did you notice the trend yet…?

26 Royal Artillery is now 3rd Division's Fires specialist, with GMLRS and Exactor, which means there is one less AS90 regiment and that a number of batteries have resubordinated (such as 176 (Abu Klea) Bty moving from 19 to 26 RA, or H Bty (Ramsay's Troop) moving from 1 RHA to 26 RA, rallying under the flag of 19 (Gibraltar) Bty), while others have gone into suspended animation, namely 17 (Corunna) Bty and 38 (Seringapatam) Bty
This reverts the de-centralization of GMLRS which had taken place under Army 2020. I'll be honest and say that this was one of the very few things of Army 2020 which i actually appreciated, because having a wider spread of GMRLS and Exactor meant putting the capability where it needs to be. 
26 RA will still end up parcellized all the time, sending out batteries to be battlegrouped to support this or that brigade, and while there are probably advantages to having all GMLRS training and management in the same place, the mixed artillery regiment is, i believe, the right way to go. Notoriously, i'm a champion of the approach "structure and train as close as possible as to how you fight", and i've already said more than once that i'm also all in favor of permanent combined arms battalions with tanks and armoured infantry working shoulder to shoulder. 
I'm also a huge supporter of Exactor and would very much like to see it employed more widely, perhaps not by the Royal Artillery but directly by infantry and cavalry. For now at least, the Army is not "listening". But it eventually turned back on many of the decisions of Army 2020 that i thought made no sense, so perhaps one day... 

Meanwhile, 42 Air Defence Support Bty has been disbanded and 12 and 16 Royal Artillery regiments will rebuild their own dedicate support elements to be able to deploy independently. They had been joined at the hip by Army 2020 cuts and related force structure changes, but, once again, a U-turn has followed. 

These are mostly good news, but we might find unpleasant truths later on. The long-delayed report on the future of the Army Air Corps bases is still not coming out, and the promised 4 squadrons of Wildcat helicopters are still only 2, even though deliveries have ended. This is worrying.

There could be big changes coming if Warrior CSP is given up and an “all-MIV approach” is approved.
My own advice to the British Army is to consider a wide-ranging rethink of Cavalry, reconnaissance and ISTAR. The confusion over Ajax’s role and deployment within the brigades and the fact that the future of battlegroup ISTAR is up in the air with no endorsed path to a Desert Hawk III replacement is alarming, and shows that FIND doesn’t have enough of a voice, or of a direction.
The Royal Artillery and the Cavalry are reportedly sparring over who should be responsible for the post DH III FIND, and depending on who you listen to, the spar seems to be about staying OUT of the role. I had a discussion with a cavalryman who said that “playing around with toy aircraft” is not a Cavalry role. I think and hope he doesn’t speak for the whole Corps, but it certainly left me with the worst of impressions. FIND is a key function which deserves a lot more effort. Brigades without a dedicate reconnaissance unit are a terrible idea which shouldn’t even have been put forwards. And it is ridiculous to think that the British Army can seriously think about high intensity warfare while fielding a grand total of 5 counter-artillery radars, and short ranged too.
If it takes a specific “ISR Corps” to bring a more rational approach in the sector, so be it. Each brigade will need its own ISR formation which can conduct reconnaissance, counter-reconnaissance and surveillance of the area of operations. Most nations have been organizing their cavalry according to these requirements or forming specific battlefield surveillance brigades in the case of the US Army. Mast-mounted sensors, radars and unmanned vehicles, both air and ground, have become part of the cavalry mission pretty much anywhere, with the UK as the only notable exception.
Ajax, and with it the whole recce cavalry concept, seem to have bogged down somewhere midway between the Squadron of American Brigade Combat Teams and the 8x8-based cavalry squadrons planned by the Italian army.

The US Army cavalry squadron in armoured BCTs is now composed of a tank company with 14 Abrams MBTs and the “6x36” model, in which each Troop has two platoons of 6 Bradley IFVs, each carrying 3 crew and 3 dismounts. One every two vehicles in the Troop is fitted with a LRAS long-range sensor, and the Squadron has its UAV platoon with RQ-7 Shadow drones, plus HUMINT/IMINT intelligence element.
Wheeled BTCs on Stryker replace the MBTs with the Mobile Gun System and TOW variants of Stryker. Notoriously, the US Army is moving towards the introduction of 30mm guns on the other Strykers.
In practice, the American recce cavalry has moved towards greater firepower and a greater number of dismounts. The Americans also hold on for dear life to mounted 120mm mortars.



The Italian army intends to restructure its cavalry on homogeneous regiments each containing a squadron of 8x8 Centauro II tank-destroyers, with 120/45 mm cannons; 2 squadrons of Freccia 8x8 in two variants, FAR and CLOSE; and another squadron of supporting elements.
The Freccia FAR closes equipped with HORUS tube-launched UAVs and a combined radar-EO sensor which can be dismounted or deployed on a telescopic mast; while the CLOSE carries dismounts plus an unmanned ground vehicle UGV, while replacing the HORUS tubes with SPIKE anti-tank missiles.

An early Freccia Recon FAR shown with the LYRA radar selected for it, in dismounted mode. It will also employ the HORIZON optical sight. 

The UGV seen on the CLOSE's ramp 

This image shows the UGV, the Lyra radar and HORIZON sight near a Freccia Recon CLOSE
HORUS drone seen coming out of its launch box on the Freccia Recon FAR 

The Ajax is similar to the Bradley used by the American squadrons, but does not carry dismounts. Each Sabre Sqn will continue to have a support platoon with dismounts riding in Ares APCs, replacing the current Spartan, but it will be a small component.
We were told that there would be around 20 vehicles in a “Ground Based Surveillance” sub-variant of Ajax but it is not clear if it is still the case and what additional sensors, if any, this sub-variant will be able to bring to bear. Mast-mounted long range sensors are still nowhere to be seen, leaving Ajax essentially only with its main sight, which because of very questionable design decisions needs to be removed if a Protector remote weapon station is deemed necessary. Taken all together, these weaknesses expose just why I feel that the focus of the Ajax programme was sadly not really on ISR at all.

With the rush to Strike in 2015, Ajax is now attempting to re-invent itself as a “medium tank”, with at least half of the regiments literally leaving recce behind in favor of a combat role more akin to a real MBT.
This continues to be a rash and irrational decision, that the MDP should reverse.
Despite claims to the contrary, it looks like the Ajax family has been purchased as a one-for-one replacement of the Scimitar / Spartan combination, just much larger and heavier. Ajax as the dismount-less “tank”, with more protection and firepower but less deployability and stealth, supported by a handful of APCs carrying small teams of max four dismounts. There should be an “Overwatch” sub-variant of the Ares to give the formation some anti-tank punch, but it is not clear if it will offer any more capability than just carrying a Javelin dismounted team. In this sector, in many ways, the Army took a backward leap when it retired Striker and its Swingfire missiles back in 2005.

As it stands, the Ajax family does not have the firepower, nor the full range of sensors to be a truly capable ISR system. As for its attempt to be a Medium Tank, that is just insane.
The Army needs to approach the MDP as a chance to urgently reassess how Ajax will be used and distributed. A decision on WCSP is needed, and ABSV must absolutely be taken into account as well. If all the parts aren't considered within a much needed long term plan, the Army will end up in trouble again very soon.
And i will add that the Army also needs to organize the cavalry into a force that delivers the kind of ISR and punch that a modern brigade needs. And / or procure a "true" Medium Armour variant of Ajax, which would at least possess a more credible firepower.