Friday, December 2, 2016

Strategy is a long term vision


There is not too terribly much that can be said on sir Parker’s review of the UK shipbuilding situation, at the moment. His is merely a list of suggestions, an independent report which might or might not generate policy changes. To know whether his recommendations have changed anything, we’ll have to wait for the actual Shipbuilding Strategy which the government has promised to publish sometime in “spring 2017”.
That document is the one we want to read, and the one from which answers should come. We can only hope that something serious comes out of the whole exercise, but skepticism is more than justified.

The single most important recommendation formulated by sir Parker, in my opinion, is this:

The MOD Sponsor should establish a transparent Master Plan for naval shipbuilding that lays out Defence’s procurement plans for each series of naval ships over the next 30 years. This should be backed by “set and assured” capital budgets for each new series of ships. The Master Plan should be reviewed at each SDSR.

The importance of an overarching, long term vision cannot possibly be overstated. What sir Parker denounces in his report is that the Royal Navy’s future is dependent on a series of programmes that almost come out of the blue. There is no master plan, there is no long term vision guiding the succession of studies, assessments and attempts to launch a new shipbuilding programme of any kind.
The result of the short-termism is evident in today’s frankly desperate situation, in which the Royal Navy, at very short notice, has been saddled with 5 OPVs that it didn’t really want nor yet need (the current ones could easily last another decade, as was planned until recently); while at the same time seeing its main frigate programme not only delayed, but broken into two halves, the second of which has no defined shape, role, budget. RFA Diligence is gone without replacement, RFA Argus is very much at risk of ending the same way within the next 4 years, and the future of everything else is still vague and indefinite, subject to the shifting fortunes of yearly budget negotiations.

Ultimately, the current process involves many people and too many ‘hand-offs’. Too many think they have a vote, or even a veto, in the process. Current governance is not sufficiently clear. There is no assured “Capital budget” for a RN project which means programmes are subject to arbitrary intervention and delays adding to cost. Senior Responsible Owners’ objectives and accountability are not always properly aligned. There is a clear system of financial approvals via the Investment Approvals Committee, but the system is not always applied intelligently to ensure that good quality information and early engagement with decision makers results in well evidenced and timely decisions. The result is a lack of empowered project grip.  

Sir Parker talks of “set and assured” capital budgets for the 30 year plan, and this would clearly be helpful, but it is also evidently very complicated. Even just a more flexible commitment would help, however, as it would help the Royal Navy’s struggle to preserve what’s left of the fleet.
The navy itself needs to plan that far ahead, not so much in terms of what the singular ship will look like that far away in time, but in terms of how to retain and possibly enhance a capability. There are, in my opinion, two critical cases in which long term planning is long overdue: one has to do with the role of the MCM, Hydrographic Capability (MHC) mothership expected to eventually replace current Hunt, Sandown and Echo classes, beginning in 2028. The MHC mothership plans have taken, this far, a very far back seat, with all MHC attention going to the payload development and test.
There are certainly good reasons for focusing on the new unmanned vehicles and the new kind and breadth of stand-off mine clearing they enable. It is a great innovation, with all the risks that innovation entails, and until the system is proven the Royal Navy cannot take a final decision on whether the future mothership will be a steel-hulled, multi-role vessel or a novel edition of the super-specialized GRP hulls in use today.

The Royal Navy, however, needs to take a decision quickly because as Type 31 drops down the capability ladder to become a “light frigate”, or a General Purpose vessel, the fields of usefulness of Type 31 and of the potential MHC Mothership begin to overlap.
Without a plan, there is a very real risk that the Royal Navy, within a decade, goes from having no “second line” flotilla to having three classes of second rank ships: Type 31, River Batch 2, MHC. It would be an incredibly bad use of money, because it would leave the high end fleet of escorts short of numbers and capability, while overcrowding the lower segment.
Sir Parker mentions that containerized MCM kit could one day be deployed from Type 31, and while this might well be, the point that needs to be made, very quickly, is what overlap exists between Type 31 and MHC – Mothership. Can they become the same programme? If not, how can the RN make sure that the Type 31, while being “light” is an escort oriented towards the high end of warfare, with MHC covering the low end, rather than duplicating a same set of limited capabilities?
This is how wasteful procurement is born: lack of clarity, lack of long term vision.

The Type 26 itself is already suffering from severe lack of long term vision. The Royal Navy arrived to the Type 26 programme after close to two decades of desperate attempts to get a new frigate programme on the move. Countless efforts began and died without ever generating a single ship, and the last of the big studies had eventually come up with a fleet-wide plan for 10 “C1” high-end ASW combatants supported by 8 “C2”, simpler “general purpose” frigates, with a third class, the “C3” for OPV roles and MHC mothershipping.
Type 26 came out of the killing blow dealt to that tentative long term plan: C1 and C2 were merged into Type 26 and their cumulative total was reduced to 13, with any C3 equivalent deferred to a vague future.
Then, just a few years into the Type 26 programme, the Royal Navy has been effectively kicked back to a C1 and C2 situation, where 8 Type 26 are supposed to be the C1 element and the Type 31 the C2.
This is an example of catastrophic long term planning failure, and the Type 26 now arguably suffers of design imbalances caused by having to be the “one and only”. The Type 26 has been designed with extremely long logistic endurance, a vast defensive armament spread in two different areas of the ship, a very large mission bay and a Chinook-capable flight deck, and thanks to the MK41 it has the potential to be very well armed as well (overlooking for a moment the fact that right now she is far more likely to have empty cells than filled cells, again for lack of clarity on the future and cash shortage). Was all this necessary in an ASW-roled escort which, by virtue of its role, would spend most of its time in task group? They are all very helpful attributes, but being in task group means having relatively easy access to extra firepower from the other vessels; access to fuel and stores replenishment; aviation support.
Currently, the RN is facing the prospect of having a large, multi-role ASW vessel inside the task group and a cheap, light frigate doing solo deployments. One is left to wonder if it wouldn’t make more sense to have built a somewhat simpler ASW escort, more rationally thought out for Task Group roles, and a capable “global combat ship” as supporting element, designed to be a capable “solo player”.
Imbalances caused by lack of long term clarity, again.

Another area that needs long-term clarity is the amphibious capability, left in disarray by the loss of HMS Ocean without replacement, which damages very badly the UK’s capability in the sector and imposes a hybrid use of the new aircraft carriers, under the acronym CEPP, for Carrier Enabled Power Projection.
The long term solution, if a realistic amphibious capability is to be retained, is to replace the current LPDs with LHDs, combining aviation spaces with well dock and large landing crafts. But this will be extremely complex unless a coherent plan is worked out well beforehand and the government endorses the requirement. As of now, would you be willing to bet any money on the LPDs being replaced at all…? I would be very torn.

The lack of a long term plan inexorably makes it almost impossible to sustain the shipbuilding sector. How can a serious industrial and infrastructural project be put together if there is not a realistic idea of what it is that the Navy will buy, how it will do so and when? Who could ever seriously invest in shipbuilding if the only thing somewhat assured is that a few frigates will, indeed, one day be built again, while everything else might simply be replaced by vessels built abroad, if not by nothing at all?
A long term plan is desperately necessary. Everything depends on such a plan, and on decisions to be made. If we look ahead, we see that a shipbuilding plan for the surface fleet includes:

-          3 large Solid Support Ships, probably close to 40.000 tons each, to be built between 2020 and 2025
-          8 Type 26, between 2017 (hopefully) and the 2030s
-          N Type 31 between X and the 2030s
-          N MHC ships, to be defined, from the late 2020s onwards

The LPDs should enter “replacement age” around 2030 – 2032. Now that they alternate in and out of service in 5 year intervals their useful life might be effectively stretched out, but their lack of aviation facilities and overall insufficient troops and vehicles capacity, in light of the loss of Ocean, suggests that a replacement is needed sooner rather than later, so the carriers can eventually concentrate on being carriers, rather than LHAs. Depending on the choices that will be made, building the LHDs would also help sustain the whole shipbuilding sector.
By 2039, the Type 45 will all have gone out of service too, unless their 25-years life is extended. The Royal Navy is currently planning to have them gone by 2039, taking the last MK8 Mod 1 guns with them (there is currently no money for ever retrofitting the 127mm gun on Type 45).
Depending on how the government wanted / was financially able to proceed, there is no real shortage of work: these programmes often overlap, suggesting that for many years there could be a relative abundance of orders. Assuming all programmes eventually start and that ships are not procured abroad. And this is what the strategy needs to say.
In the early 2020s, the RFA Argus question will resurface as well, and a successor to RFA Diligence is highly desirable, so there is in theory a need for a couple of large civilian ship conversions or new builds, if the government is willing to endorse the requirement.

The Venator 110 is sir Parker's idea of what a Type 31 base design could be. Hard not to agree with him, especially since the two BAE alternatives seen so far, the Avenger and Cutlass, have little good to offer, particularly the former. 

 
The Royal Navy desperately needs a long term plan for weapons, too. VL or canister? Type 23/45 would need the latter, Type 26 the former, Type 31? Land attack? Anti-ship? Currently, only confusion is apparent. 

All decisions about the future of the shipyards can only be taken if there is a long term master plan upon which assumptions and plans can be built.
If the three MARS SSS ships were built in the UK, in Blocks and Super Blocks, even Rosyth could have a future as the yard of assembly. As of now, Rosyth does not have much of a post-carriers future, with the Goliath crane already expected to be sold once the work on the flagships is over and all that remains is nuclear submarine dismantling and, maybe, the carrier refits over their service life.
A decision to have the SSS built in the UK could change the situation entirely, and the LPD replacement could slot on the back of the three ships (with a bit of a gap in the middle, admittedly, but probably manageable).

The recommendation to assemble the Type 31 away from the Clyde is a political hot potato. In some ways it is highly desirable, in others it is a problem. The SNP will be given something to moan about if the Clyde does not assembly the new frigate. On the other hand, if a yard down south does the job, the SNP can be told, much more credibly, that if they play their independence stunt, the flow of work for the yards will dry up and construction will move south.
It is also evident that trying to built two different frigate types at the same time in the same yard could cause all sorts of problems, including the transmission of delays from one programme to the other whenever something does not work as intended. It might be reasonable to assume that BAE systems will attempt to craft out a plan to use Govan and Scotstoun differently, perhaps assigning a frigate type to each site. What will happen with the Type 31 is, at this moment in time, anyone’s guess.

The exportability bit is the one that leaves me shaking my head. It is hard to imagine that Type 31 will turn out a great export success. The market is already quite saturated with “cheap” warships which come with extremely good capability and a very heavy load of weaponry. If the Royal Navy insists on its usual trend of trying to contain cost by shredding sensors and weapons rather than adjusting building standards and other areas, the Type 31 will never sell. Look at the ships that are being sold, or seriously considered by this nation or that: they are capable vessels. They have probably cut corners somewhere, otherwise they would cost more, but they carry sensors, they tipically have an ASW capability, perhaps not always exploited by the customer, but present. They are heavily armed. The MEKOs sold to Algeria, for example. Or the Aster-armed ships recently sold in the Gulf.
Extremely well armed and cheap vessels from Russia and China are an increasingly attractive proposition.
And there is now a strong political pressure on the US Navy calling for the design of a new “small” surface combatant to build in place of the LCS-derived Fast Frigates in the 2020s. If such a ship was to emerge, it could deal the killing blow to any Type 31 export hope before Type 31 even becomes a thing.
For a variety of good reasons, it is very hard to imagine the Type 31 actually selling, especially if it is built as something which is little more than an OPV.

The Royal Navy needs to get a Type 31 which is actually useful at escorting. It also needs, possibly, to reconsider exactly how Type 26 and Type 31 will be used to cover future requirements. Perhaps it makes more sense to have Type 31s with variable depth towed sonars doing Task Group escort work and Type 26 in solo deployments.
The Royal Navy needs escorts that are credible and that respond to the two greatest dangers out there: air and sub-surface attacks. Type 31 must focus first of all on this simple truth, like the French FTI “intermediate” frigate is doing. The lower end constabulary tasks should not be a design driver, nor, arguably, should they be the Type 31’s concern. What kind of role will the MHC mothership be able to play in that area? Knowing it in good time is fundamental.

The Marine Nationale has been clear all along about what it wanted out of FTI: a ship with capable AAW defences and a good ASW capability, at a lower cost than that of a FREMM. The Type 31 should follow the same path rather than venture in "General Purpose" non-ASW land which will never deliver what the navy effectively needs from its escorts.  

Two other recommendations stand out to my eyes: that the MOD and Navy should be more intelligent buyers of ships; and that a marine design centre of excellence is missing from the picture.
There is a bond between the two things, I feel: the Royal Navy needs to be part of such a design centre of excellence, and it must probably have its own design office inside the organization. Much, if not all, of the Royal Navy’s internal know how and capability in designing warships was lost years ago, leaving the service more or less completely in the hands of industry. This was supposed to save money, but it has probably generated more trouble than benefit.
A Navy able to design its own solutions is a more capable and intelligent customer by default. It will not need to buy the solution to every problem: it can design it and then have it realized. The Italian navy is currently kicking off a major shipbuilding programme building 7 PPA, “light frigates” that will complement the FREMMs and replace everything from two of the old Destroyers down to the current OPVs. The programme also includes a massive and very capable LHD and a supply ship. The cost of the entire programme is lower than the Type 26 alone is expected to cost, and this is extraordinary.

Only 2 of the 7 PPA will be fully equipped with sensors and weaponry, at least initially (torpedoes, towed sonar, Aster missiles, Teseo SSM, 127mm, 76mm CIWS), with a few more having an intermediate fit including 76mm CIWS on top of the hangar, 127mm gun and Aster missiles and the remaining having lighter sensors fit and only the guns, with no Aster. But all come with significant innovations in their design, from the bow to their high speed, from the mission spaces under the flight deck and amidship to the new fixed-face radars to the impressive two-man "cockpit". 

One of the “secrets” of the current Italian shipbuilding programme is that the new ships have largely come out of the work of the Navy’s own design office. Industry is involved, of course, but in a very good way: the new ships introduce a large number of new systems (a new CIWS 76mm turret, new IRST, new radars, new towed sonar, a modular and multi-mission design, an innovative wave piercing bow for very high speeds (PPA is meant for 35 knots speeds) and others) designed by the nation’s industries. Why the UK can’t put together something as ambitious? Why has the Type 31 to be affordable only through being a depressingly low capability hull?


The long-term shipbuilding strategy for the UK must include a real centre of excellence in shipbuilding design, and the Royal Navy probably needs to have its own office inside. Shoulder to shoulder with industry, but with doors that can be locked when the moment calls for it. 


Friday, April 29, 2016

The Shipbuilding Strategy: beware of the "Pointless" class



The Shipbuilding Strategy document is expected in October this year. It is hard to say what we should expect: there are many very serious, very important questions waiting for answers, but all previous experience of MOD documents sadly suggest that the question marks are likely to continue floating even when the paper is published. Possibly, we'll have even more questions popping up. 

The largest question mark floats above the whole General Purpose Frigate (GPFF), also known by most as “Type 31”, even though this designation does not appear to be officially accepted. The many questions connected with this project begin with a massive: “what is it good for?” and continue through "how it fits in the wider Royal Navy situation and budget".


Type 26 and GPFF

The new favorite line of HMG is that “nothing has changed since the SDSR”, which is probably true (we don’t really know, since we were never given clear timeframes and details to start with), but conveniently ignores how everything has changed compared to what had been the earlier plan. We have gone from a plan for 13 Type 26, 8 kitted for ASW and 5 “without sonar tail” to just 8 in the ASW configuration; from a 2016 start of build to at least a 2017 date (and we are not sure that will be it, either, maybe it’ll slip further), from a 12 months drumbeat to 18 months or two years.

Assuming that the first Type 26 still enters service in 2023 (we don’t actually know if and how this has changed), delivering one every two years means that the last of 8 ships will be delivered possibly in 2037, one year later than earlier planned for delivery of the 13th and last ship in the original schedule.

We are told that the numbers will still add up, though, thanks to the “cheaper, simpler, exportable” General Purpose Frigate (GPFF, despite reports of the contrary, the “Type 31” designation does not seem to be official) which will be designed over the next X years for build “somewhere” in the timeframe Y. We have literally no idea yet what the GPFF will be like, and how, where and when it’ll be built. We are told that the Shipbuilding Strategy is “looking” at building the GPFF and the Type 26 “concurrently”. One would hope so, because otherwise 5 of the Type 23s will have to be stretched and dragged over several more years than currently planned (and already their originally intended service life has been stretched a lot as it is).

There is a potential political bomb in there, as buiding two classes concurrently looks likely to mean building the GPFF away from the Clyde. The MOD and BAE, in fact, are expected to invest some money to upgrade both the Govan and Scotstoun sites, but the uplift will still mean that the Type 26 is built across both sites, with the project for consolidation into a single "frigate factory" yard having been rejected.  
It is quite hard to imagine GPFF blocks being built between the Type 26 blocks, at the same time, unless the commonality between the two is so high that the same procedures and manpower can be employed. But this would mean reverting to building Type 26s for both roles.

The problem of building GPFF away from the Clyde (SNP bitching aside, and this unfortunately is a big issue in its own right) is that other british shipyards options are far from evident. Thanks to the closure of the BAE shipbuilding plant in Portsmouth, it might take a significant amount of money to restore/uplift infrastructure and manpower elsewhere, further eroding the supposed margin for cheapness of the new class.

Let’s spend a few words about the GPFF and the “General Purpose” frigate as a whole: who has been following this blog for a while has already read a sizeable two-parts article with my considerations on GP and alternatives to “frigates” for the role.
I hate the guts of the GP frigate idea, simply, because its effective usefulness is dubious at best. The current “GP frigates” are just mutilated Type 23s which did not receive the 2087 towed sonar array when the earlier sonar was replaced on the rest of the class. Tail-less, their ASW capability is immensely reduced. They are just less capable ships, with the saving grace of having been built originally as ASW frigates, keeping, in theory, the door open for a future retrofit of the towed array. I say in theory because it is extremely unlikely to expect the emergency regeneration of ASW capabilities on these ships: even assuming the sonars themselves can be sourced “quickly”, the specialized personnel cannot.
The Type 26 GP would have perpetuated this absurd situation. 

The run-down of ASW capability in the 90s was part of the “peace dividend” following the fall of the Soviet Union, which was seen as including a “holiday” in the submarine threat to UK interests. I find that assumption was always very, very, very debatable, since submarines are incredibly dangerous and even a small and weak flotilla of SSK in the hands of an enemy becomes an enormous risk factor around which operations have to be planned, and large forces have to be assigned to counter it. The ARA San Luis and ARA Santa Fe, during the Falklands war, were a major menace and it is very fortunate that Santa Fe was caught on the surface and thus easily dispatched. San Luis was never nailed, and the Royal Navy can be grateful for her unreliable torpedoes, because she launched a few attacks on british ships that could have been fatal.
The submarine threat is now growing quickly once more, and much of the threat is once more represented by Russia, which couples a resurgent, modernizing fleet to a muscular foreign policy which is causing tension at levels unseen for years.
In this scenario, it hardly make sense to have frigates that aren’t frigates. If they aren’t useful for ASW and they have just a basic local area air defence fit (CAMM / Sea Ceptor), what are they good for? What is their realistic wartime role and position? How do they solve the shortage of escort vessels in the Royal Navy?
Simply: they do nothing to solve that shortage.

Abroad, the french are purchasing a cheaper "intermediate" frigate design to complement their own expensive new FREMM frigates, but they are showing greater wisdom with their FTI (Frégate de Taille Intermédiaire), which will have ASW capability.  
The US Navy, after its own ASW capability holiday, is now retrofitting towed arrays to all DDG-51 and all Ticonderoga cruisers, while fitting a powerful ASW sensors kit to some of the LCS and requiring a towed array as a permanent fit on the "Fast Frigate" LCS derivative. 
The UK, for unclear reasons, seems to be "copying", so to speak, the italian navy, which is building several ships in "GP" configuration, without towed sonar (including 6 out of 10 FREMM frigates and several of the incoming PPA "patrol frigates"). There are several good things that the italian navy is doing with its warship projects, but the UK, amazingly, seems determined to copy the one dumb thing.  

The latest reports suggest that GPFF designs being proposed are a modified Khareef, stretched by some 12 meters in length to gain a Merlin-capable flight deck and some space amidship; and the BMT Venator 110. Very modest ships, destined to be lightly armed, lightly crewed, with little to no mission spaces and with no ASW equipment. 
Supposedly, the idea is that Type 45s and Type 26s will be devoted to providing the escorts to the Task Group, while the GP ships will “cover a variety of other tasks”.
One has to wonder what those tasks are. Op Kipion? Not really, in the Persian Gulf, to keep an eye on Iran which would present a very sizeable air, missile and sub-surface threat, you’ll want, guess what, a Type 45 and an ASW frigate.
South Atlantic…? Yes and no. Yes mostly just because the Argies are unlikely to want to pick up a fight anyway.
NATO Standing naval groups…? Yes, they could be sent to SNMG-1 or 2, but would it make much sense to try and deter Russia with a 127mm and a small battery of CAMM missiles…? No. It would be a statement of political will, but not one of meaningful capability.
Caribbean? You don’t need CAMM and 127mm to chase drug smugglers, while you need space for carrying Disaster Relief supplies and personnel, so that for half the role the GPFF would be overkill and for the other half it would be too small and inadequate. Little better than a River, the currently deployed ship type.
Counter-piracy? Yes, but even here the effective usefulness depends on how many boats she’ll carry, how many embarked Marines, what helicopter / UAS options she’ll offer for surveillance and intervention.
Fleet Ready Escort? Yes and no. If she is suddenly needed to react to a crisis where submarines are part of the threat, she’s out unless escorted herself by ASW vessels. If it has to keep watch on peacetime passages of Russian task groups in the Channel, her equipment fit won’t make that much difference. River OPVs have done that before, and while it doesn't "look" right, it doesn't make too terribly much difference in practical terms. 

Venator 110 

And frankly, there is every chance that the GPFF will have no anti-ship missiles other than Sea Venom for the embarked Wildcat, so she won’t be of much help against large surface warships either. Remember that the Harpoon replacement is still an open question, and that whatever is chosen is highly likely to be vertical-launched, due to the Type 26 having 24 Strike Length VLS and no space for traditional over-deck launchers. A stretched Khareef or a Venator won’t have MK41 VLS, so the problem is pretty obvious. Problem that extends to Type 45 too: currently four ships are being retrofitted with over-deck Harpoon ramps, but the future of the SSM capability for the class is absolutely unclear. While missiles like NSM/JSM and LRASM are heading down a path which will see both tube and VL launch variants offered, recent history suggests that the RN will not put much money into solving the issue.
The Type 45, though, has room for 16 additional cells, MK41 Strike Lenght sized, which, while primarily considered these days as an "easy" path to anti-ballistic capability (via adoption of the US SM-3 missile), could also help solve the SSM problem if there ever were the will and the money to do so. 
The GPFF could end up being exceptionally lightly armed, and I don’t think anyone would be actually surprised. 

Khareef class corvette. The close relationship with the River Batch 2 is evident.  

The question is always the same: what is the GPFF actually good for?

Building a 3000 – 4000 tons lighter escort ship, and do so by re-activating a second shipbuilding site in the UK, is not at all a bad idea. If it can be done, it is actually an excellent thing. But an escort and a “GP frigate” can end up being very much different things. The Royal Navy is certainly short of hulls, but moreover it is short of escorts, and building “frigates” that haven’t a clear usefulness in a war scenario isn’t a good solution. The escort problem is only solved by escorts, the hulls problem can be solved in cheaper, alternative ways.

It should also be noted that, unlike what is apparently being suggested now, it would make more sense to use the smaller frigates to beef up the protection of the Task Group (where the presence of other ships and intimate helicopter and aviation support from the carrier better compensate the single ship’s weaknesses) rather than send them abroad on single-ship deployments.
Personally, I think that it makes a lot more sense to cover Op Kipion with a Type 26 rather than with a GPFF, even fitted with towed array for ASW: the Type 26 will have more Sea Ceptor rounds available; better aviation, small boats / Unmanned Vehicle capabilities and capacity; and, possibly, Tomahawk and/or land-attack capable anti-ship missiles in its Strike length cells.
If It has to be a single ship, doesn’t it make more sense to use the large, well armed one that is less dependent on intimate support and that can, via Tomahawk, give an immediate firepower option in the area without having to relay entirely on the SSN(T) positioned east of Suez or having to wait for the task group to arrive?
It will also be a far better fit in NATO Standing Maritime Groups, for obvious reasons.    



The “Pointless” class?

There are another two reasons why GPFF could become the “Pointless” class: they could be born old and obsolete; and much of their limited usefulness could end up being almost duplicated by another ship class the Shipbuilding Strategy will have to tell us about: the MCM and Hydrographic Capability (MHC) mothership.
They could be born old and obsolete because technology is evolving incredibly quickly and we are on the edge of a major revolution in naval warfare, brought about by several technologies which are maturing steadily and are likely to become an ever greater factor over the coming decade. These are, in no particular order:

-          Hypersonic missiles
-          Ballistic (including anti-ship) missiles
-          Rail gun
-          Laser
-          Unmanned vehicles

It is already concerning enough that the Type 26 herself is potentially going to struggle to adapt over the course of her life. It will introduce the 127mm gun with 40 years of delay, right while the rail gun enters the frame. It will use CAMM missiles right while hypersonic and ballistic anti-ship weapons become part of the picture. It will use Artisan, a single-face, rotating radar in the age of unblinking, fixed-multi plate radar coverage.
It will have a CODLOG propulsion arrangement that could make it complex to squeeze more power out of her to retrofit the new systems.
But at least she’ll have the mission bay and 24 MK41 cells, enabling carriage of new missiles and new systems. The GPFF might not have any of these saving graces due to the size apparently being considered and the need to save money.

Finally, MHC. This programme, earlier known as MHPC, with the P standing for “Patrol”, is meant to introduce a replacement capability for the current Hunt and Sandown MCM vessels and for the hydrographic vessels Echo and Enterprise.
The P has been provisionally dropped as a consequence of the order for 3 new River Batch 2 OPVs, followed by another 2 to be ordered. This has removed the “short-term” (the first MHC mothership isn’t expected before 2028!) patrol requirement represented by the need for a River Batch 1 replacement.  
The MOD is so far “keeping the options open”, not refusing the possibility that new build, “traditional” minesweepers could end up being required. But the direction of travel is completely different, with the money spent so far going all on creating a family of unmanned systems (Surface, Sub-Surface and potentially Air) destined, initially, for embarkation on suitably modified Hunt ships. A UK-only combined influence sweep package is in the development / prototyping phase, and a wider MCM family of systems prototype is due to be formally ordered, jointly with France, later this year.

If the unmanned systems keep the promises, the mothership will be built out of steel and will be pretty large (the only known, very generic indication is for a ship in the 3000 tons range). It will have long legs and good deployability plus, almost certainly, aviation spaces (at least an helicopter pad, probably also a hangar), all things that the current minesweepers do not have.
This makes the new ships useful across a wider range of roles. They will be a lot fewer than the MCM hulls they replace, but they will be more useable, not to mention that the unmanned systems could also be launched from vessels “of opportunity” or from the shore, giving new options for training and deployment.
France has given a few indications about their own plan, which would involve 8 system of drones and 5 motherships, two of which normally used to cover home waters needs, 2 expeditionary and 1 for training.

The Shipbuilding Strategy will have to tell us some more about the MHC direction of travel, especially if the 2028 ISD for the first new mothership is confirmed: that date would imply that the construction of the MHC vessels would overlap with that of Type 26 and GPFF.
Where does everything fit, in shipyard terms and in budget terms? Because it is unthinkable that MHC does not happen at some point: sooner rather than later, it will start eating into the GPFF and Type 26 plate. 

A particularly important question for the Royal Navy is: how many motherships should be built to replace the 15 (but soon enough 12) MCM ships and 2 hydrographic vessels? And again, even more key to the whole strategy: what usefulness can be squeezed out of the MHC mothership in addition to carrying MCM and hydrographic drones? How does adding capability to MHC impact the role / need for GPFF?
This question is of absolutely key importance.

In simple terms: GPFF, if it is built, should be about increasing the number of credible escorts. If it can’t, perhaps it is better to just built 2 more Type 26 ASW and cancel GPFF altogether and focus entirely on MHC to make it as useful and useable as possible.
Hulls and Standing Tasks should be an MHC and OPV concern and opportunity.
If GPFF ends up being good only gor “glorified constabulary tasks” with CAMM and a big gun, it will offer little additional value over OPV / MHC ships while still eating a considerable amount of money.

With 5 to 6 OPVs (depending on the fate of HMS Clyde) in the future fleet, the Royal Navy will have a healthy “second tier” flotilla. Assuming all 6 OPV remain, one should be forward based in the Caribbean and one possibly in Gibraltar. The Rivers, even the Batch 2, have the big defect of not having a hangar (a rather dumb trade-off on capability if there ever was one), but can do well enough against drug-smuggling and for presence / defence engagement in north and western Africa. The OPV forward based in Gibraltar could also take part in non-combat operations in the Mediterranean (where the current instability and migration crisis will probably last for a long time)and even move as far away as Somalia or Nigeria to take part in counter-piracy missions in the two areas. In these missions, it will do almost as well as the proposed “stretched Khareef” GPFF, at very little additional cost (they are being built anyway, let’s give them a meaning).

And then there will be MHC. What will MHC deliver? Back when it was MHPC, it was described as “an OPV mothership”, with a 30mm gun and River-like constabulary capabilities.
If the GPFF gets built, this is what most likely will be built, as there won’t be money for anything more, nor an easy case to be made in front of the treasury for fitting more.
That would give an oversized constabulary flotilla, since there are only so many things that an OPV can do.

Another question arises, at this point: what if the GPFF and MHC were merged?
Before Type 26, the Royal Navy was considering a 3-tier fleet made up by C1 (10 high-end ASW escorts, 8 C2 (more or less what the current GPFF is supposed to be) and then a number (8?) of C3 patrol / MHPC vessels.
Type 26 ended up merging C1 and C2, in what turned out to be (predictably, for how I see it), a bad decision and one that the budget would not support.
The alternative to a return to C1 (Type 26), C2 (GPFF) and C3 (MHC) at much reduced numbers could be a two-tier approach in which C1 is ideally returned to 10 ships, supported by a C”23” which puts the “fighty” bits of a “cheap” GP frigate together with a sizeable work area in the stern for the needed MCM / Hydrographic (and one day, possibly and probably, ASW) unmanned systems. The DAMEN CrossOver would then become the obvious example to follow in designing such a vessel.
The LCS is the obvious example in terms of concept / philosophy, as it has merged the role of small combat ship with ASW and MCM. Just not in the happiest of ways, due in no small part to absurd speed requirements. Don’t copy the ship, but do copy the base idea.

The Royal Navy should not suddenly go from a “we want no 2nd Tier warships, no matter how much we struggle to put together a task group while wasting destroyers to chase pirates” to a “multi-layered constabulary flotilla with uncertain/no wartime usefulness at the cost of real escorts”.
The relationship between GPFF and MHC should be very carefully considered, because the wrong choices in this area will completely screw up the shipbuilding strategy as a whole. And the Royal Navy too as a consequence.

Make GPFF a light but capable escort by including ASW capability, or don't bother with it, because there are probably better ways to spend that finite, precious money and obtain greater overall capability.



MARS FSS: Fleet Solid Support Ship

The SDSR finally gave the go ahead to the much delayed programme for building three replacement ships for the current Fort class (Fort Austin, Fort Rosalie, Fort Victoria) “around the middle of the 2020s”, but we don’t yet really know what design will be chosen and, moreover, we have no clue about where these massive (we are probably talking of 40.000 tons ships at full load) vessels will be built. Is there a place in the UK that can handle this project? Will they be built abroad?
The assumption, years ago, was that the complex and sensible nature of these replenishment vessels destined to carry ammunition, stores and spare parts would require building them in the UK. Now, it is hard to guess what the thinking might be. If built in blocks around the UK, these ships could probably give quite a bit of work to several shipyards. But what would be the cost implications?


Will this be the FSS, or will the budget dictate a drop in ambitions compared to this proposed design? 

In terms of timeframes, it seems likely that there will be a slide to the right, as current OSDs for the Forts (2023, 2024, 2025) would require the replacements to enter service before, not after, 2025. It seems this will change.



Argus and Diligence?

RFA Argus has a 2024 OSD, and Diligence’s own OSD has been pushed to the right again and again. We’ll see if the Strategy document will make any mention of them and provide any indication for a replacement. These two vessels provide invaluable capability, and losing them without replacement would be a major blow.



Long term shipyard sustainability

If the GPFF (or my proposed “C23”, for that matter) resurrects a british yards down south, how can it then be sustained in the longer term? Answering to this question might prove pretty complex, to say the least.
The Clyde shipyards have an answer at easier reach: by 2037, when work on the Type 26 should be over, the Type 45s will have more than exhausted their intended 25 years service life. HMS Daring will have already been in commission for 28 rather than 25 years.
Of course, we all expect to see the Type 45 service life stretched, as always happens, but it seems reasonable to assume that its replacement will keep the Clyde going almost without interruption, if things are done well.

But the first Type 26 won’t reach the end of an assumed 25 years service life before 2048, and the first GPFF / C23 will hit hers later still, meaning that two “escort yards” continue to look unsustainable in the long term. Export cannot be counted upon as the savior: even assuming GPFF turned out being an export success (something I sincerely think will not happen, in a market which already offers tons of well established options from GOWIND to MEKO designs), the chances that export ships would be built in the UK are pretty low. The design might gain the interest of some customers, but the building is very likely to take place in the customer’s country. 

On the large ship front, sometimes in the 2030s the LPDs could do with replacement via LHDs, and building two large LHDs would be a blessing for, potentially, more than one shipbuilder. 


Tuesday, December 30, 2014

A golden year for Russian military programmes


We could probably discuss for days about how much of a real danger Russia represents for Europe, but those who doubt of its resurgent military capability should probably take note that Russia in the year that is about to end has been making dramatic progress in its weapon programmes. 

The navy's shipbuilding and refitting results for the year are good enough to openly talk about a golden period, and the plans are to speed up the process even more in the new year. 

Air force deliveries have also been significant, and there is now a contract in place to upgrade a total of 110 Mig-31 interceptors. Deliveries of 129 Su-34 are underway (the first two batches of 5 and 32 have been completed, and in June the first 3 of 92 aircraft in the third batch were delivered). At least 37 Su-30SM should have been delivered to, and by 2016 they will be 65, with a possible order for 50 more to follow. 
Deliveries of 48 Su-35 ordered in 2009 will be completed next year with the last batch of 14. 
By 2017 there will be also 50 Mig-29SMT, while 79 Su-25 will have been modernized by the end of this year. 

The army has not been forgotten either, with hundreds of helicopters being refurbished or newly produced, plus developments in armored vehicles, with work ongoing on the ARMATA concept which should be shown to the public in the new year.

Nuclear forces have even announced they have started a programme for putting into service new ICBM-launching trains, something that had fallen out of fashion with the end of the Cold War. 
Conventionally armed Missile brigades are steadily being re-equiped with the Iskander M tactical ballistic missile and a new missile, the R-500 Iskander K, is in development, reportedly in breach of the INF treaty due to a range much superior to 500 km. 

Keeping track of all russian programmes and deliveries isn't easy, but i want to write here a recap of the particularly impressive progresses in the Navy's programmes, particularly the submarines production. 



SSBNs

This year the russian navy has finished overhauling the Delta IV-class submarine K-84 Ekaterinburg, and returned it to active service. That brings to 6 the number of Delta IV submarines refitted and overhauled, and all are operational with SINEVA missiles. 
There are also 3 Delta III SSBNs still in service, with the SS-N-18 missile. 

The building of the new SSBNs of the Borei class (Type 955 and 955A) is progressing: Yuriy Dolgorukiy and Aleksandr Nevskiy have been joined by Vladimir Monomach , commissioned on December 19. 
That gives a fleet of 12 SSBNs, although the Borei are still not completely operational due to enduring difficulties with making their Bulava missiles reliable. 

Knyaz Vladimir, first of the improved second batch (955A) is in build, and during 2014 Russia has started building 2 more: Knyaz Oleg had its keel laid down on July 27, and Knyaz Suvorov had its keel laid down December 26. We do not yet know exactly what improvements the 955A introduces: long running rumors of it having 20 instead of 16 missiles are not confirmed. 
Over the course of next year Russia plans to lay down a further three Borei SSBN. 



SSNs 

The first Yasen-class SSN (885M) Severodvinsk was commissioned this year. Kazan is in build and planned for delivery in 2016.
Novosibirsk was laid down in july 2013 and this year Russia laid down two more (Khabarovsk and Krasnoyarsk) on July 27. 
Two more Yasen are planned to be laid down in the new year. 

In december 2012 the Russian Navy signed a contract to overhaul, upgrade and reactivate the two Sierra I (945) submarines Karp and Kostroma. I don't know the current state of the programme, though. 



SSKs  

The Russian Navy has this year commissioned the first of six Improved Kilo submarines (Project 636.3), all destined to the Black Sea Fleet. The submarine, named Novorossiysk, was commissioned on August 22. 
The second boat in the class, the Rostov-on-Don, has been commissioned today [correction from earlier]. 
The third, Stary Oskoi, was launched on August 28, while the remaining three (Krasnodar, Veliky Novgorod and Kolpino) were laid down on february 20, october 30 and october 30 respectively. 

One Lada class (677) submarine is in service and two more in build, and the Russian Navy has announced days ago that it is satisfied of its experimental AIP propulsion system, which is apparently due for insertion into a Lada submarine next year. Production in series is planned beginning in 2017, and earlier this year Russian Navy officers said a new class of SSK, a "5th generation" class to be known as Kalina, would be built with the AIP propulsion. 
Not clear yet how the passage from Lada to Kalina will play out. 



Surface fleet developments  

The surface fleet has been getting new items as well. The Kirov-class battlecruiser Admiral Nakhimov is now in refit and upgrade, and should return to service in 2018. 

The second frigate of the Gorshkov class (Project 22350), Admiral Kasatonov, has been launched on December 12. 
Golovko and Isakov are in build. 

Two more frigates, of the Grigorovich class (Project 11356) are on the way: Admiral Grigorovich should have been delivered in November, and Admiral Essen has been launched the same month. 
Admiral Makarov, Butakov, Istomin are in build and a further ship is planned, the Admiral Kornikov, for delivery by 2017. 

One heavily armed Steregushchiy (Project 20380) corvette has been delivered this year, the Stoiky, in May.
Four ships have been delivered/are in service and four more are in build, including two
Greniyashchy (Project 20385), an improved of the 20380. The Russian Navy plans to build several more of these vessels, aiming to reach a total of 20, but orders have yet to be formalized.

The Russian Navy has launched a programme for 6 patrol ships, Project 22160, and laid down the first 2 (Vasily Bykov and Dmitry Rogachev) on february 26 and July 25 respectively. 

A second amphibious ship of the Ivan Green class (Project 11711) has also been ordered and laid down this year, on december 4. 

The brand new Submarine Rescue ship Igor Belousov has started its second round of contractor sea trials on December 25, and they should close by December 31. 

And there is of course the thorny issue of the two Mistral class LHDs ordered in France, which might or might not be delivered at some point. 

And i might be missing other elements. Not bad at all, for a single year!   



Naval aviation  

In the new year, deliveries of 24 new Mig-29K (20 single seat K and 4 twin seaters KUB) for use on the aircraft carrier will be completed. The aircraft carrier itself, though, is one bit of a bad news as she is long overdue to go into a massive refit and overhaul programme which keeps slipping further away. Forays into the Mediterranean due to the Syrian crisis and conflicting schedules with the Kirovs' own docking needs have so far prevented the launch of the ambitious rebuilding the Russian Navy was planning a while ago.   

The Russian Naval aviation is also receiving at least 12 new Su-30M, land based. 
32 navalized Kamov Ka-52KM attack helicopters are ordered for use on the Mistrals. Deliveries have begun in september. 3 in total are being delivered this year, with 13 more due in 2015-16.
Not sure yet of what, if any impact the Mistral situation will have on this issue.  

Six Be-200 seaplanes are on order, and one should have been delivered this year. They will be used to form two search and rescue squadrons of 3 aircraft each, one for the Pacific Fleet and one for Western Fleets.