Saturday, August 19, 2017

Building on strengths


Shortage of resources require coherence and joined up thinking at the budgeting table. Pursuing vague “revolutionary” concepts such as Land Strike while knowing full well that there is no chance to ever be able to afford the equipment needed to make it remotely workable is simply suicidal, particularly while the SDSR 2015 is already under a new review, exquisitely money-driven. Nobody in their sane minds can believe this new review has actually anything to do with supposedly changed geopolitics due to Brexit. It is about money, and they might as well admit it and show some honesty for once.
It is urgently time to go back to basics and set out a coherent way forwards that builds on the strengths the british forces already posses, rather than continuing to disorderly knock pieces off them in order to fit into the annual budgeting circle while pursuing two hundred different programmes, most of which end in nothing but sunk costs (FRES, LIMAWS, Soothsayer, FRES UV, SMART, FIST, Fire Shadow etcetera, I’m looking at you). The modern day army, although of course not entirely for faults of its own, has been particularly guilty of this sin.
Budget delegation is in many ways a welcome development, but asking each service to generate “savings” from within their budget without considering the wider implications is a recipe for further disasters.
A general direction of travel needs to be decided and then defended. It must be coherent and joined up: all services need to be working according to the same strategic guidelines. At the moment, this is not the case, as the talk of split buy for the F-35 or the dismantling of littoral and amphibious capability demonstrate.

Aim of the UK’s defence policy should be to preserve, as much as possible, the ability of the country to take independent action where absolutely necessary and within a realistic scale. Second, the equipment and force structure choices should be oriented towards making the UK a Leader within NATO, by making it a perfect candidate framework nation for the construction of multinational forces for more complex operations. UK policy makers in recent times like to remind us that future operations are likely to be coalition efforts, but the actions do not quite match the rhetoric as cuts and corner-cutting have far too often hit areas which were of great importance alliance-wide.
It is the case, notably, of the maritime patrol aircraft cut, thankfully eventually corrected, but also of Sentinel R1 (a unique capability in Europe), amphibious shipping and logistic shipping.

What does the UK bring to the table that is unique, or particularly valuable; and how can it get the most from what it has? This should be the question at the base of an honest review.
Excluding the nuclear deterrent and the SSNs (by far the biggest influence buyers, as well as areas with a rather solid plan already in place), the UK’s areas of excellence include:


Special Forces. Highly respected and valued, the british special forces are a powerful strategic asset and an influence buyer. Repeatedly, government has promised to boost them, but progress cannot be measured from the outside for lack of information.
What can be seen is, however, not actually encouraging: as will be discussed further below, the SDSR commitment to providing long-range vertical mobility (air refuel-able) to the Special Forces seem to have died in early stealth cuts. Another problem without an evident solution is 657 AAC, which is part of the Joint Special Forces Support Wing and provides support in the form of light assault helicopters (Lynx AH9A at the moment). 657 AAC is planned to move into Yeovilton, which suggests that it will probably convert to Wildcat when the last 8 AH9A are withdrawn from service as soon as April 2018.
Director Special Forces was almost saddled with 8 “Light Assault” Wildcat in 2011, of which 4 would have been additional new buys and 4 conversions of airframes from the 34 purchased for Army and Royal Marines. That project was announced, costed, and then killed without explanation. Reportedly, Special Forces were not happy with the helicopter.
Now, however, 657 AAC might end up being not an additional Wildcat LAH Sqn, but just one of 4 (?) Army sqns, equipped with the Battlefield Reconnaissance variant, with little or no mods. In other words, Director Special Forces is getting a far worse solution than the one it reportedly turned down in 2011.
The UK Special Forces Support Group (1 PARA) also recently disbanded one of its companies, removing a platoon from all Strike Coys and redistributing the Fire Support Groups to partially compensate.
21 and 23 SAS, the reserve formations, underwent a change of role as well, towards Human Environment Reconnaissance and Analysis. An important role, but the impact that this change had on availability of personnel for more “traditionally defined” tasks is unclear.
In addition, Special Forces are still waiting for the full range of mods and additions to the C-130Js under Project HERMES. Ever since the C-130Ks configured for SF work went out of service, there has been a gap in capability.
Not a reassuring picture. We have to hope that the "black" programmes, the ones we don't hear about, are doing better, because for the rest, facts do not match rhetoric. 


Air Mobility. The UK has a very valuable C-17 fleet which is unique in Europe. There is a NATO mini-fleet of 3 C-17, but as helpful as that can be, it is clearly not enough. The combination of 8 C-17, 22 A400M, 14 stretched C-130Js and 9 (14 as max effort) Voyagers is a powerful one, and one of the most valuable assets that the UK can offer to its allies. A capability valued by allies means influence.
France and Germany will have much greater numbers of A400M, but no C-17s, and there are things that only the latter can do. France experienced in full the difficulties caused by lack of strategic airlift while transferring forces into Mali for Op SERVAL. 8 C-17s are too few to solve the problem entirely, but they certainly mean the UK is better positioned.

The UK also is going to have a capable, large fleet of 60 Chinook, which represent a lot of lift capability for Air Manoeuvre of land forces. 23 Puma HC2 and 34 Wildcat also help, although a greater number of more capable medium helicopters would be desirable.
It also possesses a capable fleet of 50 Apache which, considering the Tiger’s constant woes, are arguably by far the most capable attack helicopter force in Europe.

Heavy airdrop has been gapped 
16 Air Assault has much reduced access to light armour these days

A lot of money has been expended to build up this air mobility fleet, yet a succession of corners have been cut, denying the full exploitation of this sizeable investment.
In particular:

-          16 Air Assault Brigade has been cut back in capability as well as size. The gapping of Heavy Airdrop capability and the failure to progress with the adoption of precision airdrop mean that the brigade’s already limited parachute capability is essentially virtual unless the Americans drop the heavy bits (vehicles, L118 Light Guns etcetera).
-          The acquisition of long-range vertical manoeuvre assets seem to have been quietly cancelled once more. Although the SDSR was deliberately vague about providing longer reach to Special Forces, it was pretty clear that two options were on the table: MV-22 Osprey, which could refuel in flight from Voyager KC3s; or the retrofit of air refueling probes to at least part of the Chinooks and the fitting out of a couple of short C-130Js to serve as tankers. None of the two options seem destined to materialize.
-          The failure of efforts to purchase internally transportable vehicles that would give air mobile troops far greater mobility after reaching the LZ inside Chinooks.
-          The Voyager’s lack of a boom as well as the choice not to invest in a reconfigurable top-deck, which would have made it far more capable by opening up huge cargo possibilities.

Foxhounds of 2 Gurkha Rifles are air landed in support of 16 Air Assault during ex Joint Warrior

Air mobility, including air manoeuvre of ground troops via Chinook and Puma lift, is a partial excellence. The UK is an extremely good position under some points of view and in an extremely poor one under others. At the moment, it is an unfinished work.
In recent times there have been some welcome developments thanks to the end (op TORAL requirements aside) of the very demanding Afghanistan air bridge. In particular, the RAF has finally started to employ the tactical capabilities of the C-17instead of employing it just to lift heavy / high volume cargo from A to B. Airdrops and tactical air landing have been opened up, and 16 Air Assault brigade has experimented with “air-mechanized” operations by inserting small “packs” of Foxhounds (apologies for the pun) in support of the air assault task force during the last Joint Warrior.

This is an area of excellence which:

-          Enables UK long-range operations, not just as part of a coalition, but, at limited scale, in substantial independence
-          Is valuable to allies and, in its C-17 part, unique in Europe (which is a bonus in light of the need for influence during the Brexit process)
-          Is valuable to the main ally, the US, and can be a vector for further integration

As such, it is a battle-winning and influence-gaining asset which deserves greater attention, instead of being repeatedly run into the ground by small money-savings measures that add up to huge losses of capability.

A more detailed look into the Air Mobility area is here and here.



ISTAR. The UK has the most complete air-breathing ISTAR force outside of the US Air Force. This asset is highly valued by the US, as evidenced by the extremely close relationship in operating the Rivet Joint element. The 3 UK aircraft complement a fleet of just 17 in US service, making it an important contribution in terms of mass as well.
Protector, if “at least 20” are effectively put into service as promised by the SDSR, will represent the largest MALE fleet in Europe and the most capable, at least until the European MALE 2020 project delivers results. Something that it might or might not do.
The 9 P-8 Poseidon are a critical asset for the safety of the UK, which remains as exposed as ever to submarine warfare in the, perhaps unlikely but certainly catastrophic, eventuality of conflict against Russia. The new MPA fleet will also represent a large portion of Europe’s capability in the MPA sector, which is suffering NATO-wide and was officially listed already a few years ago as one of the critical weaknesses to correct.
And Sentinel R1 is as precious and unique as it is unlucky and constantly targeted by cuts guided by short-termism of the worst kind. The reduction of the fleet to just 4 aircraft and, more importantly, the marked reduction in the number of crews have already determined, or at least undoubtedly played a part in the gapping of this capability in Operation SHADER.
The UK is extraordinarily weak in terms of satellites. It has no radar, optical or SIGINT satellites of its own, relaying on the data supplied by US constellations instead. Even a good portion of the communications capacity comes via participation in the US AEHF constellation.


Sentinel R1: a unique, praised capability facing a never ending struggle for funding 

The ISTAR fleet is another key excellence. Cutting back on the number of Sentinel R1 and crews is an example of damaging short-termism determined by lack of joined-up thinking. The RAF budget holder had to save money somehow, and I’m willing to believe this was the least damaging options among those at his disposal, but it remains, overall, a disproportionately negative outcome.
It is also very worrying and disappointing that there is still complete uncertainty about how to preserve this unique battlefield surveillance and targeting capability post 2021. It is true that, by then, capable SAR radars with Moving Target capability will be widely available (on Protector, Watchkeeper, F-35 and on Typhoon once it is retrofitted with the CAPTOR E AESA radar), but none of these is a full Sentinel R1 replacement all the same. 

ISTAR ticks all the boxes again:

-          It enables UK operations, in coalitions and in independence
-          Is valuable to allies and, in several ways, unique in Europe
-          Is valuable to the main ally, the US, and can facilitate further collaborations (with Norway and beyond, particularly thanks to P-8)


Long range strike. A multi-pronged capability made up by:

-          Tomahawk
-          Land-based aviation with Storm Shadow
-          Carrier based aviation
-          Stealth

The UK will be the only country in the European side of NATO to tick all boxes at once / in significant numbers, thanks to the F-35. This area of absolute excellence is not without its own problems, with the main one being the tiny stock of Tomahawk and the relative poverty of platforms able to fire it. The Type 26 will introduce the ability to fire long-range missiles from surface vessels for the first time, but Tomahawk by then will be out of production unless US plans change or the UK lodges in an order before it is too late.

In the future, Tomahawk and Storm Shadow (and Harpoon) could be replaced by the same weapon, the new SPEAR 5 / Future Cruise and Anti-Ship Weapon to be jointly developed with France. Entry into service is not expected until the 2030s, however, with the Storm Shadow OSD being 2032.
Much too late to avoid a lot of problems for the Navy, forced to lose Harpoon already next year and facing the dilemma of how to arm the Type 26 in the meanwhile.
Long range strike capability could be expanded by putting cruise missiles on P-8 Poseidon or even by resurrecting the idea of ramp-dropping Storm Shadows from the back of cargo aircraft.
Future long-range strike should also be able to relay on the FCAS unmanned aircraft in development in collaboration with France.
This area is in relative health, despite the cancellation of Storm Shadow integration on F-35B. Unfortunately, the integration would only become effective much too close to the missile’s OSD to truly make sense, so spending money on it is not, in any scenario, wise. SPEAR 5, however, should definitely find its way on F-35B and Type 26.
The worst problem in sight is the dramatic firepower gap on Royal Navy warships with the loss of Harpoon.


Carrier Enabled Power Projection

For a long time, the UK has talked of the new carriers in terms of Strike, as that was the fashion of the moment. The truth is that “Carrier Strike” understates what carriers are for, reducing them to one mission when in reality they have many. The “Strike” capability of the new carriers come from their size: they can carry enough fuel, stores, weapons and aircraft to generate enough sorties to be a true power projection tool, unlike the Invincibles, which arguably achieved all they could and then some, but could never go past the limits imposed by their size.
Carrier Enabled Power Projection better summarizes what the carriers really are about: they ensure the fleet has the air support it needs to operate in the congested, cluttered, contested, connected and constrained environment of current and future warfare. Without organic air power, a fleet cannot venture far from the air cover coming from land. Without a fleet capable to go into a contested environment, far from home and potentially far from friendly land bases. there can be no power projection at any serious  scale.
With the Navy planning to have one carrier at Very High Readiness (5 days notice to move) and the other at 20 to 30 days notice to move, continuous carrier capability is a realistic aim.
The programme for the first two squadrons of F-35B and for Crowsnest is now firm. The biggest risk for the realization of the CEPP’s promises regards the formation of the F-35B squadrons number 3 and 4. These are threatened by the “split buy” idea which could see the RAF go for the F-35A, in what would a sublime example of single service reasoning.
Unfortunately, to the F-35 budget holder (the RAF), the F-35A is alluring because it is cheaper than the B, and has (potentially) a larger internal, stealth payload and a bit more range. If joined-up thinking doesn’t win the day, there is every possibility that CEPP will be compromised for little to zero actual gain: the RAF does not own or plan a weapon for which the larger weapon bays of the A are both necessary and sufficient. SPEAR 5 will almost certainly be too large for internal carriage regardless, while all other weapons in service or planned do not need a larger bay.
The split buy must be avoided at all costs, at least until the B fleet doesn’t comprise a fleet of 4 frontline squadrons, which represent the threshold for a realistic, self-supporting force.



A more detailed explanation of the dangers of the split buy idea is here.

The Royal Navy’s effort should be focused on its Joint Expeditionary Force – Maritime, centered on the carriers and including the amphibious group. The UK has the tools needed to put to sea an “Expeditionary Strike Group +” , more capable than those fielded by the US Navy, which are centered on a LHA / LHD, a LPD, a LSD and some 3 escorts. The UK group can buy substantial influence:

-          Its global deployment is a statement of intention that is not matched by any other short-term deployment form
-          It is valued by the US as it helps cover all stations, enabling the progressive shift of US attention to the Pacific
-          It represents a capability that, in Europe, only France can, in part, replicate


Royal Fleet Auxiliary

Too often overlooked, the RFA is an extremely valuable tool and one that truly sets the Royal Navy apart from other European navies. The capability and capacity of the RFA is unmatched in the European side of NATO. It is the tool that enables the Royal Navy to have blue water and expeditionary possibilities.
Unfortunately, some of its most valuable assets have been lost or risk being lost without replacement: RFA Diligence had no equal in Europe, yet it was sacrificed to short-termism in the hunt for savings. RFA Argus risks suffering the same fate in a few years time.
Two Point-class Ro-Ro sealift vessels and one Bay-class LSD were also lost to cuts, and the loss in capability far exceeds the savings.


A design proposed for the Solid Support Ship, including a well dock for landing craft for increased amphibious support capability 

Particularly important to the RFA’s future is the nascent Solid Support Ship programme, which aims to build 3 ships that will replace Fort Austin, Fort Rosalie and Fort Victoria around the middle of the 2020s. Critical enablers for complex CEPP operations, these vessels should represent a priority in planning and their design should include Joint considerations, primarily through the provision of support to forces ashore, to the greatest possible scale.
The RFA is a key enabler for independent and coalition operations. It allows the UK to support multi-national efforts at reach and thus represents an influence-buying asset.


Amphibious capability

Amphibious capability is a key element within Carrier Enabled Power Projection, but it deserves to be detailed further.  
The future of this capability is particularly concerning as it is being squeezed to death by lack of joined up thinking and budgetary short-termism. With the budget holder (Navy HQ) forced to slice the salami to somehow fit into the annual budget cycle, the Royal Marines have taken a long series of hits, most recently the removal of 42 Commando from the traditional assault role in favor of “maritime force protection” task.
Equipment-wise, the amphibious force is about to lose Ocean after losing one LPD (in mothball) and 1 LSD plus 2 Ro-Ro sealift vessels.
Modernization efforts have been almost entirely frustrated by killing off:

-          Force Protection Craft
-          Fast Landing Craft
-          BV206 replacement
-          Joint Mini UAS (a proposed Royal Marines / Army replacement for Desert Hawk III)

The picture is currently very depressing and the future is full of worries, despite the Royal Navy correctly listing amphibious capability as one of its three defining capabilities (together with Continuous At Sea Deterrence and Continuous Carrier availability).
The dramatic reduction in amphibious capability extends to the Royal Logistic Corps losing its own large landing craft without replacement.
3 Commando Brigade, just like 16 Air Assault, has been partially dismantled and turned into a “demi-brigade” on two battlegroups alternating yearly into readiness.
And all this has happened in open contradiction with doctrinal studies that have reaffirmed, year after year, that the future of global geo-demographics is Littoral. This requires UK forces that are able to mount substantial littoral and riverine manoeuvre, as joint and Army papers, including the Agile Warrior experiment, constantly reaffirmed.
The Royal Marines are also historically connected to Norway and are one of the formations tasked with reinforcement of the Northern Flank in case of a “Russia scenario”. Consequently, they are defence’s sole specialists in Arctic and Mountain warfare. Even this aspect of their capability is under threat, with arctic training for 2018 reportedly entirely cancelled due to Navy HQ simply not knowing how else to fit into next year’s budget. In a triumph of bitter, humiliating irony, days before the news emerged, UK officers were saying, at the Air Power Conference, that the next theatre of operation will be the frozen north.
As too often happens in british defence, words tell one story, actions paint another one entirely.



The UK’s amphibious capability is a key asset for future independent and coalition operations; it is valued by the US and by other allies, in particular Norway; and represents much of the amphibious capability available to the European side of NATO.
The trend of reductions and capability losses should be immediately reversed. Royal Marines and Army integrations should increase, if this is what it takes to encourage more joint thinking and a common response to correctly identified trends. The current situation of agreeing on the key and growing importance of littoral and amphibious manoeuvre while cutting back on all elements of said capability is ridiculous and must end.

The UK also took the leading role in a NATO initiative to develop solutions for the opening of sea ports for deployment abroad. Considering that all UK operations, considering geography, will inexorably deal with multiple seaports every time, and that entry into a theatre of operations might well be complicated by damaged / poorly kitted out / contested and semi-demolished ports, this capability is a key national requirement as well as an influence-buyer within the alliance. It also has peacetime value as a disaster relief instrument.
Literally nothing has apparently move since the launch of the initiative, and it would be really important to revitalize the effort and invest in this area.

A more detailed look into the state of the amphibious force can be found here and here.


ASW

Anti-submarine warfare is back on the list of priorities as tensions in Europe remind NATO that the basic scenario has never changed: if things ever go seriously wrong, the fate of the conflict in central Europe completely depends on the ability of the navies to escort convoys loaded with American tanks and supplies across the Atlantic.
The UK’s vulnerability to submarine warfare is unchanged as well. There are less submarines these days, but there are far fewer escorts as well, and today supplies and fuel travel on a far, far smaller number of far larger tankers, container ships and other vessels.
The loss of a few large merchant vessels today would have catastrophic consequences comparable to the complete annihilation of a few convoys back in the old days, a fact not always appreciated.
During expeditionary operations, the presence of a few diesel submarines is enough to put the task force in grave danger and tie down a lot of resources for defensive action. Undervaluing the threat is very risky: there is no certainty that the next torpedo fired at a Royal Navy warship will fail like those fired by the argies' ARA San Luis in 1982.

The Royal Navy remains a champion and an authority in the field of ASW operations, and its Type 23 frigates, Merlins and, tomorrow, Type 26s and MPAs will be particularly precious. Gaps do exist, however, including the absence of a long-range anti-submarine weapon for warships. The Navy also has just 8 ASW escorts these days, and there is worrying talk of Type 31 being a non-ASW vessel as well. A rethink is urgently needed.


Survey and MCM

The Royal Navy has great survey and MCM capabilities, and both will remain precious in the future, since mines remain a huge danger.
The Royal Navy’s MCM capability is particularly valuable in part for the US Navy’s relative weakness in this area. From an European point of view, the RN’s MCM force is less valuable, only because pretty much all countries in Europe have maintained capable flotillas of their own.
The ability to survey the seabed and clear it from mines remain crucial for the safety of the UK and for the conduit of operations abroad.
The MHC programme that should eventually define the replacement of the survey vessels Echo and Enterprise as well as of the current MCM ships is particularly important.


The deployable Division

The ability of the UK to field a capable Division for operations at range is a key element in determining the country’s power and influence. Division-level deployment gives the UK a more realistic “independent” option and keeps the country in the top tier of contributors within the alliance. Deploying a division far from home remains a major undertaking and one that is beyond the possibilities of many states: as such, there can be no doubt about the influence brought by this capability.

The ability to deploy a Division should not, however, come at the cost of a force structure adequately thought out to sustain brigade-sized enduring operations, which are more frequent and just as important. Army 2020 Refine pursues a vague concept of “Joint Land Strike” at the cost of making the Army a one-shot only organization, with little to no staying power. It is a completely illusory target, built upon shaky, vague doctrine. The myth of merry, quick land wars is well and truly debunked, yet the British Army is effectively pursuing a structure that embodies that myth. General Carter made mentions of Operation SERVAL, the French operation in Mali in early 2013, as being an example of rapid, decisive action as that envisaged for the Strike brigades. However quick and decisive the combat ops of January 2013 were, SERVAL eventually lasted 1 year and 6 months, between January 2013 and July 2014, equating to 3 successive tours if the 6 months deployments are to stay true. And its conclusion became nothing other than the beginning of operation BARKHANE, which endures to this day. I will also remark that the particularities of Operation SERVAL make it hardly useful as an inspiration for British Army future operations: in particular, the French were able to move so rapidly because much of the troops employed in the first phase were already forward based in Africa. Again, the rapid movement overland of wheeled formations was enabled by the presence of allied forces that secured the rear (not just Mali forces, but allied contingents from Niger and Chad which were more numerous than the French contingent itself). I hope to write a more in depth analysis of what Mali can and cannot say about the utility of “Medium Weight” forces in the context of the STRIKE infatuation in the British Army.

As I’ve already done several times, I suggest the British Army abandons the current, suicidal course and thinks about using its resources, beginning with manpower and existing equipment, in smarter ways. Joint Land Strike is a wobbly concept, based on dreams more than on realistic assessment of historical operations. Its implementation is essentially limited, due to budget and manpower shortages, to four battalions worth of wheeled APCs and, maybe, a wheeled 155mm howitzer in the future, all paid for by severe mutilation of other areas of the force structure. It is not just a flawed concept, it is a flawed concept that the Army will attempt to pursue while knowing from the start that it does not have the necessary equipment pieces.
The Army should rethink its force structure and make good use of what it has, instead, ensuring that the current “fake” brigades are used to deliver true deployable formations instead, grouped in two deployable divisions, albeit lighter. That will give the army a more realistic and sustainable balance of forces. Army 2020 Refine reportedly aims to be able to deliver a “best effort” division of 2 armoured and 1 strike brigade.
There is every reason to be skeptical about the feasibility of such a deployment in the first place, which would require 100% of the Army’s heavy armour and 50% of its medium armour, right from the get go. Who was in the army at the time remembers what a struggle it was, for a much larger army than today’s, to deliver 1st UK Division in Iraq in 2003. That division had only one armoured brigade, 7th Bde, plus 3 Commando and 16 Air Assault Brigades plus divisional assets.
In terms of equipment, Army 2020 Refine’s stated ambition matches or exceeds the Operation TELIC numbers: a division of 2 armoured and 1 strike brigade would deploy, in theory, with 112 Challenger 2 (vs 116 at the time); more than 200 Warriors in all sub-variants (versus 140 IFVs plus sub-variants), 36 AS90 (same) and 12 to 18 L118 or their future replacement (vs 39), plus one hundred or more Ajax and probably one hundred MIVs.
Talk about doing more with less. 1st Division’s deployment had a long-lasting ripple effect that dragged on for years in the daily running of the army and in the allocation of spares, and one can only imagine what kind of impact would come from trying to deploy 3rd Division today, from a much smaller army.

Modernization should continue in the heavy armour sector, which is actually the one, together with light infantry, where the British Army has the best spread of experience. Substantial armoured forces were deployed in two Iraqi wars, and heavy armour is now once more in high demand with defence of East Europe now at the forefront of NATO tasks.
Going back to the Air Mobility point, seen earlier in this article, air-mechanized manoeuvre can and arguably should be the true “Land Strike” focus for the British Army.

While there are undoubtedly merits and attractions in wheeled armour, the British Army should not pursue them at all costs by turning itself in a “make it or break it” silver bullet that would leave behind little more than a smoldering empty case once fired. It has a number of ongoing programmes already competing for shares of an ever tight budget and a longer list still of capability gaps, weaknesses and new requirements coming up in the next few years. There is no real urgency to pursue the STRIKE myth: in Europe it would be of limited and questionable utility against far more capable Russian formations, hybrid or not; while in Africa and the Middle East it would be helpful but far from decisive. As currently envisioned, a Strike Brigade with MIV would not be too much of a step up from a deployment of infantry mounted in Mastiff. The MIV comes with far better off-road mobility, but with same (or indeed less, as the new 8x8 will definitely be in the 30+ tons region) strategic mobility and same (insufficient) firepower.
The whole thing costs too much for what it actually adds. The “8x8 revolution” has been announced many times but has never really materialized. While wheeled armour does work, undoubtedly, it has not and will not change warfare anytime soon.
The US are still trying to make their Stryker brigades work, and their latest attempt to make them more useful is the addition of 30mm guns and Javelin under-armour launch capability; both things that MIV is almost certainly not going to enjoy. France is building on its experience of wheeled armour by investing on vehicles substantially lighter and simpler than the 8x8 and Ajax envisaged for the Strike Brigades: the Griffon 6x6 APC and the Jaguar 6x6 armoured car. French brigades enjoy more firepower, more and far larger infantry regiments than the two battalions of the british strike brigades, and self-escorting logistic formations.
Italy is (slowly) building up the most complete 8x8 force in NATO, thanks to the combination of Freccia and Centauro, with Centauro 2 on the way. None of the 8x8 available have made any kind of game-changing difference to the operations we have seen in modern times.

In terms of availability of the capability, it should be noted that 8x8s have been chosen by smaller European armies which have had to renounce to their tanks for budgetary considerations. Denmark is investing in them, Belgium has them (and will in future stay wheeled but downgrade even further by going Griffon 6x6 after announcing recently the purchase of the new French vehicle) and Spain wants a large number to replace the wheeled vehicles already in use.
There is no shortage of 8x8s in NATO. There is, instead, a shortage of heavy armour and artillery, which is becoming more evident by the day as Russian forces modernization progresses. France is rebuilding a fourth tank regiment; Germany is bringing back more than 100 MBTs, the US are rebuilding at least two armoured brigades over the next three years.
The UK, conversely, is looking at dismantling one of its three tank regiments and cut back on what is a proven, battle-hardened capability, albeit weakened by the obsolescence of Challenger 2, delays in Warrior CSP and weakness in artillery.
Instead of fixing well known issues, the army is looking at making them worse, just to mount four infantry battalions on 8x8 APCs. It remains, in my opinion, the dumbest possible course of action. There really isn’t a gentle way to put it: it is just a suicidal direction.
Heavy armour is still the measure of an army’s combat power as well as the main asset for high intensity warfare, the only one which has existential implications and thus should be the priority.
That is not to say that the Strike Brigade could or would not be deployed in Europe for reassurance initiatives. I’m sure the british army would gladly copy the US 2 ACR’s road march with Strykers across Europe if it already had MIV. It would be certainly impressive and appreciated in East Europe, but if push ever came to shove, the MIV as currently envisaged (without turret and cannon) would be maybe able to race to the front but it would be crushed once there.
Peacetime shows do not strictly require MIV. The British Army attached Jackals to the 2 ACR’s road show, and as a political statement, it suffices. For operations, MIV is not enough.
The Strike Brigade, as of now, is just not a wise use of money, manpower and kit.

An in-depth examination of all the gaps in the British Army force structure and a proposal to close them is here.


Combat engineering

You don’t often read this, but the British Army has excellent combat engineering regiments, well equipped and capable. They have a great spread of bridging capability, which is not easily found elsewhere, and they have great breaching equipment in the form of Trojan.
They are extremely valuable assets, which remain fundamental to any operation and which are likely to be more important than ever in future, heavily urbanized scenarios.
There are weaknesses too, though: the demise of SHIELDER exemplifies a dramatic decay of Counter-Mobility capability, which absolutely needs to be reversed as it would be key in any European war scenario, however unlikely.
Urban battlefields arguably suggest that re-introduction of a short-barrel, high-calibre demolition cannon such as the old 165mm is also highly desirable.
Project TYRO is (slowly) working on life-extending and upgrading or replacing the bridging equipment.
The M3 rigs are still operational and, in one of few good news contained in Army 2020 Refine, the regiment utilizing them. 75 RE; is due for considerable expansion as a renewed focus goes into wide wet gap crossing.



At the same time, Army 2020 Refine would remove 35 RE from the Close Support role, if not from the ORBAT altogether. This is part of the reductions that compromise the ability of the army to keep a brigade in the field for enduring operations, and should be reversed.


Battlefield recovery and repair

Despite the cuts suffered by REME in 2010 and an unfortunate and substantially failed re-organization of REME resources into battalions, the british army still enjoys a considerable richness of Recovery and Repair assets and expertise. A look at the equipment available in other European armies will rapidly show that the other countries tend to cut this corner a lot.
What is in short supply elsewhere becomes automatically valuable when the time to mount an operation comes.


Training

The level of training and expertise that can be found in the british armed forces remains considerable. Training delivered by british forces is respected and valued, and the UK can buy security and influence through provision of training and assistance to friendly countries all over the world. Training deals also play a substantial role in supporting british defence industry in the export market: Typhoon jets can result a lot more attractive, for example, if british training comes along with them.
While there are good reasons to be skeptical about the “Defence Engagement Battalions” being created within the army, the general idea of having units permanently tasked with defence cooperation abroad is good under many points of view. Substantial uncertainty remains about the nature of these battalions, their effective capabilities and their employment. Several press reports have suggested that these battalions will be similar to American Green Berets, acting as Special Operations Forces where necessary, supplying covert or overt assistance directly on the battlefield. If true, this would make them particularly valuable but also particularly expensive to set up, man and maintain.
The area of foreign engagement, albeit unglamorous in many ways, does deserve attention and further work.
Delivery of naval and air training can be just as valuable. One problem in the Air domain is the puny size of the new training fleets. These are modern and capable, but truly minuscule. The SDSR 2015, by reverting some of the cuts of 2010, massively increased the requirement for trained aircrew, but did not adequately expand the training fleets to account for it. The number of instructors was expanded considerably compared to pre-2015 expectations, but the number of training aircraft was not corrected. There is already talk of adding an extra 2 Phenom and of doubling the T-6C Texan II line, from 10 to 20 or more aircraft, but well known budget issues have to be overcome for this to happen.
The reduced size of the training fleet means that there is little to no room for foreign pilots training, but cutting back on this kind of engagement is damaging.

Another important aspect of UK capability is the availability of a capable Red Air element to train against. Hawk aggressor squadrons, backed by EW and in-flight simulation deliver high-value  preparation for warships and aircrew. In the post-2020 era, the fate of this capability rests on the ASDOT (Air Support to Defence Operational Training) programme.

Further to the training aspect, the UK is investing a lot of money into building an Integrated Training Center for F-35 training at RAF Marham. So far, this ITC is the only one planned in Europe, with the other countries planning to have their personnel trained in the US.
Substantial opportunities for collaboration exist due to the Marham ITC, and every effort should be made to valorize it.



In conclusion

The above list of considerations is a “back to basics” assessment of what elements of the armed forces have a clear, special value and a defined role in current and future operations. All of them are backed by the two true game-changing attributes that the UK has:

-          The nuclear deterrent, with the freedom of action and the political clout it buys.
-          The willingness to engage and use force where required.

Other countries have impressive armies but never really employ them for their unwillingness to engage in unpleasant, dangerous business.

The capabilities listed in this article have particular relevance and the range of possibilities they open up should drive the UK’s strategic thinking. These areas of excellence should be developed and valorized with the aim of buying influence in peacetime and delivering decisive effect in wartime.
The measure of their usefulness comes from evaluating their importance to the UK’s conduit of war operations as well as their relevance within NATO.
Is it a capability matched by other allies? Is it unique? If other allies have it, is it important enough to deserve investment all the same? Can I afford to disinvest in it, with the reasonable certainty that I will still have access to it through allies?
Even with the UK determined to stay out of any future “European army” (arguably even more so because of it, in fact), the UK must be very careful in assessing its capabilities and that of its allies, including a realistic assessment of how easy it would be to obtain access to said allied capabilities in times of need. Just saying that future operations will be a coalition affair is not enough: if the UK had been counting on France’s equipment to retake the Falklands, today the islands would be the Malvinas.
A capability that adds something to the overall roster is particularly valuable, and should be accorded priority. Overall, the most complete and balanced spectrum of capabilities possible should be pursued, to preserve the UK’s ability to act alone when truly necessary.


The UK retains many areas of excellence, but has badly damaged all of them in repeated salami slicing exercises that have fixed the short-term budget while opening large capability gaps all over the place. Coherent, joint thinking is required to preserve those excellences and build on them to deliver a capable force. It might well mean not having medium, pardon “Strike” brigades, but that is someone else’s area of excellence. 4 MIV battalions will not improve the UK’s world stance; this still impressive roster of military capabilities, if maintained and well resourced, will.  



Thursday, July 16, 2015

SDSR 2015: Air capabilities




SDSR 2015 – Issues, analysis and recommendations going towards the review

Budget

Army 

Royal Air Force 
Air Capabilities

 
Royal Navy 



Having already written something about the Budget and my vision for fixing Army 2020, I decided to continue with more posts summarizing the situation ahead of the SDSR 2015 and exposing my thinking about what the priorities are. In this post, I’m going to cover the main areas of Air capability.


Built around and in function of ISTAR

I will start this piece by quoting a key document, presented recently by Group Captain Paul Godfrey, RAF. The subject technically is the F-35 and how its “combat-ISTAR” capability can be best exploited to ensure that the new aircraft isn’t just considered “the new jet in the stable”, but is exploited more widely, as a catalyst for change within the force. The passages that most interest us at the moment, however, are those which describe the general structure of the RAF come 2020. One slide in particular, showing the transition from 2010 to 2020, catches the eye, as the 2020 RAF includes the photo of a P-8 Poseidon.
The notes accompanying the slide make no mention of it, noting instead “lose MPA capability”. Yet, it is there, clearly recognizable. Curious, and hopefully a good signal.

The notes also say the Ground Moving Target Indicator capability currently provided by Sentinel R1 will be provided by “SCAVENGER”, the future MALE solution which is supposed to replace Reaper.
Sentinel R1 and Shadow R1 remain assumed to bow out of service in 2018. Reaper itself is currently funded out to 2019 only, and the way ahead seems littered with question marks.

My list of priorities for the SDSR 2015 is very much tied to the sorting out of problems directly and indirectly connected to ISTAR provision.



The Unmanned Side

One big problem in the assumption that SCAVENGER will take over the role of Sentinel is the fact that SCAVENGER is a (semi-?) dead project. The hope had been to develop a new MALE in collaboration with France, but the resulting Project TELEMOS has never progressed. It broke down soon after it started, and France moved on instead to sign a MOU with Germany and Italy for the design of a trinational, European MALE for the 2020s. The UK’s plans post-TELEMOS are a mystery, and it looks pretty certain that with all the time lost, in no way can a new uas be ready for 2019. It looks pretty likely to me that SCAVENGER will be, for the foreseenable future at least, a mere running on of Reaper.
Moreover, the Fr-It-Ge MALE 2020 project already seem to be encountering its share of issues, with France’s defence minister saying that it won’t be armed, with negotiations dragging on without contracts actually being signed and with Airbus already frustrated and saying that it will pull out of the project if governments continue rising issues. 
The road to a new MALE seems to be effectively blocked.

Unfortunately, even modest efforts to add capability to Reaper and prepare it for longer-term RAF service seem to be bogged down, for lack of money and/or lack of decisiveness. A long-term training solution has not yet been fleshed out; clearance for flying in UK civilian air space is not on the way and even basing is an issue. Operation Shader against ISIS in Iraq is practically a blessing for the Reaper squadrons, which have jumped at the chance of basing and flying the Reaper from the Middle East . The post-Afghanistan future of the Reaper, otherwise, was planned to be storage into its shipping container. Waddington is the base that hosts the Ground Control Stations, but no Reaper is allowed to actually fly from the base.

This is part of why I find the recent Prime Minister’s call “for more drones” somewhat irritating. The long term UAS plan seem in very urgent need of decisions and action, with clarity needed on several things before more money is splashed out on simply buying more Reapers. The RAF is heavily using all 10 it has, it is true. A written answer yesterday detailed that Reapers have fired 155 Hellfire and dropped 4 GBU-12 against Daesh in Iraq up to 30 June 2015. But before ordering more of them, a plan for training, basing, sustaining and evolving the UAS capability is needed. Reported discussions with France on a collaborative approach to the Reaper crews training problem are to be welcomed, hoping that they bring to something.

If Reaper has to make up for the loss of Sentinel’s GMTI capability, it will be necessary to fit the UAS with a larger and more capable radar. A Reaper was demonstratively fitted with a SEASPRAY 7500E surveillance radar already back in 2012, but while other countries now plan to pick this path, the UK does not seem to have given it further attention.
Trials have also successfully been carried out with Brimstone fitted to a Reaper, and Paveway IV trials were considered. But despite successful Brimstone firings back in 2014, even this development has not seen any significant progress since. For years, the UK has purchased and employed Hellfire missiles and GBU-12 bombs specifically for the Reaper. It is not efficient to continue with double stocks. Besides, Paveway IV and Brimstone 2 offer more capability. It was acceptable to arm Reapers with the same weapons used by American ones as long as Reaper was a UOR, a time-critical project. But if Reaper becomes a long term component of the RAF due to the failure in securing development of a new MALE, it will be fundamental to put british weapons on it, as well as better sensors to make up for the loss of Sentinel R1 and Shadow R1. A realistic training, basing and support solution is also needed. It might also be desirable to buy into the off-the-shelf modifications developed in recent years to expand range and endurance of the Reaper.  

The Brimstone has been successfully fired from the Reaper in trials. One of the many advantages it brings is the triple rack, which gives 6 Brimstone against the current load of 4 Hellfire.

Reaper has been demonstrated with Seaspray 7500E radar fitted. This configuration now interests both Italy and Netherlands, while the UK, which was at the forefront in the original demonstration, seems indecisive.

As far back as 2005, the UK also proved in trials with the US that the RAPTOR DB110 reconnaissance camera can be fitted and operated on Predator/Reaper. Again, the trials seem to have ended up as successess without consequences, since no further steps have been moved since.

New landing gear, new, longer wings with greater tanks and external fuel tanks are all modifications available Off The Shelt and already purchased by the USAF. They result in a massive increase in mission endurance.

It is important that the RAF, the MOD and the government finally take decisions, instead of going on and on with half-hearted trials and experiments which seem to never deliver, in the end. Decide what you want; see what is realistic; and then act to get the best of the realistic solutions. If getting a new MALE is not realistic, stop being indecisive and focus on Reaper to bring it up to the long-term task. There are ample margins to improve it and get more out of it. General Atomics is already working on adding sense and avoid sensors and safety enhancements that will allow the certification of Reaper for flying in civilian air space. This should start becoming available from 2017. 

Perhaps stop snubbing Italy, which happens to be flying Predators and Reapers routinely in corridors in its air space, flying them off the Amendola air base and employing them over the Mediterranean to watch out for immigrants. The Italian air force is seeking additions and improvements to its Reapers, which include fitting the Seaspray radar and the Reccelite pod. Italy is also working to stand up the first “UAV academy” in Europe, having already ordered simulators thought to train Reaper operators. It might be very advantageous to exploit such academy for the training of UK and French crews. If not, think about setting up an alternative training centre. But formulate a long term plan, and then stick to it. You’d be amazed by what can be achieved when a long term plan is made, and then actually followed.


Recommendations:

-          Join Italy’s UAV training academy, or set up an alternative one
-          Move to integrate of Brimstone 2 and Paveway IV
-          Focus SCAVENGER efforts on developing podded, portable sensors which can first be added to Reaper and then, eventually, migrated onto a new MALE when this will be available




Buy MPA, think ISTAR

Overall, the climate seems to be favorable to the purchase of a number of MPAs, and despite the talk of competition and competitors, it is widely accepted that the race is almost certainly restricted to two options: P-8 Poseidon, or nothing at all.

The need for a proper, ASW capable MPA is clear and I don’t think it needs to be detailed yet once more. One aspect that deserves to be covered in greater detail, however, is how I see a P-8 purchase fitting the wider ISTAR picture.
An MPA purchase is very, very likely to put the final nail in the coffin for Sentinel R1 and Shadow R1, as manpower for the new MPA will have to come from somewhere, and that somewhere won’t be a net manpower uplift for the RAF. To a degree, it’ll be a matter of robbing Peter to pay Paul. However, the capability brought to the table by Sentinel R1 is a real force multiplier, and one that sets the RAF apart from other medium power air forces. Even assuming Reaper gets equipped with a more capable GMTI radar, it will still not replace Sentinel in its entirety.

The P-8 Poseidon, however, has great potential to serve not just as MPA, but in wider sense as an ISTAR (and possibly Combat ISTAR) platform. The Poseidon comes with ample growth margins and multi-mission capability, as well as with 11 hardpoints for weaponry, 5 of which in the weapon bay, 4 under the wings and 2 fuselage stations.
India’s version, the P-8I Neptune, makes use of some of the growth potential: differently from US Navy Poseidons, the P-8I is fitted with a second radar, covering the aft sector, and the main radar has seen the addition of an air-to-air mode. The Indian P-8 is thus not just an MPA, but also, to a degree, an AWACS platform.
The US Navy itself is working on adding to the P-8’s arsenal a new, large, capable sensor, the APS-154 Advanced Airborne Sensor (AAS). This radar is the result of a highly classified development programme. It is thought to be particularly powerful in achieving mapping of surface targets in the littoral, and it has a formidable GMTI capability over land. The APS-154 might be the base of the radar the USAF wants on its JSTARS replacement aircraft, to be purchased in the next few years, but this is just a guess since the USAF hasn’t provided details yet.
The AAS is fitted in a canoe fairing which can be fitted under the front fuselage of the P-8 Poseidon, and the flight trials began last year, with the aim of putting AAS in service with the P-8 Capability Increment 3.
As of now, the AAS seems to have one major defect: looking at photos, it would appear that its carriage makes it impossible to lower and employ the MX-20HD EO/IR turret. Assuming that I’m correct in this observation, perhaps the problem will be fixed on the production line going into Increment 3. Currently, the P-8 is seeing the introduction of Increment 2 capabilities, while the Increment 3 roll-out is a 2021 affair.

 
This image shows the weapon bay open and the MX-20HD turret deployed.

The MX-20 turret out of its bay

The AAS radar "canoe" seem in conflict with the current positioning of the MX-20


From a UK perspective, purchase of the AAS would enable the Poseidon fleet to fully replace Sentinel R1, and indeed provide increased capability in all areas, over sea and land. There is a risk that being a classified, highly advanced development, the AAS might not be cleared for export so soon, but I’d recommend engaging with the US Navy from the very start to try and secure the inclusion of such capability in a british purchase.
If export clearance for the AAS cannot be obtained, it would be important to still exploit this P-8 possibility, by seeking to integrate another radar in a suitable pod. Even re-use of the Sentinel’s own radar, if at all possible, could be a good start.

Sentinel R1 proposed upgrades include tweaks to the radar to enable it to track surface targets at sea, and possibly the addition of the DB110 (better known as RAPTOR in RAF service) reconnaissance camera to add a long range optical capability as well. Weight and space growth margins in the Sentinel R1, however, are limited, and it will be financially challenging to both purchase a MPA and run on Sentinel. Although Sentinel is almost certainly considerably cheaper to run per hour, two fleets means two training and logistic lines to sustain, and more manpower needed. Moreover, it means there are two aircraft which will compete for investment going ahead in time, when both will need upgrades but the money won’t be there for both. I think that, although Sentinel is a good performing system and indeed better in some ways in its role, a single, larger fleet is a more realistic proposition for the MOD’s finances. Having a MPA fleet of Poseidons and keeping the Sentinel at the same time would be better from a capability point of view, but would quickly become a problem from the financial and manpower angles.

The P-8 has a lower service ceiling than Sentinel (41.000 feet versus 49.000), which is unfortunate as height allows radar sensors to look further away; but it comes with some SIGINT / ELINT capability, an MX-20HD EO/IR sensor, a powerful multi-mode radar (AN/APY-10) and a powerful communications suite, plus air to air refueling capability (although via receptacle only). Its unrefueled endurance all in all might not be quite as good as that of Sentinel, however.

Over time, the P-8 could become a Combat ISTAR platform thanks to its significant payload. The integration of weapons such as SPEAR 3, for example, would enable a P-8 AAS to survey a massive area, track moving and fixed targets from a great distance and even engage them directly as necessary. France, in recent times, has been using its Atlantic 2 MPAs in a Combat ISTAR role, integrating GBUs on them for use in operations in Africa and over Iraq. Something similar was envisaged as a Nimrod MRA4 capability, as well. The MRA4 was also seen as a potential Storm Shadow carrier, and the P-8 could one day carry cruise missiles as well.

Under a purely MPA point of view, the P-8 Poseidon purchase is desirable due to it including the very latest Multi-static Active Coherent sonobuoys, which are to massively increase wide-area ASW capability. Moreover, the P-8 means close partnership with the US Navy on development and integration of future updates. A support and upgrade arrangement similar to that adopted with Rivet Joint, which sees british aircraft integrated in the USAF rolling programme of bi-annual maintenance and upgrade, is highly desirable. This is a crucial factor: it is no use to purchase a cheaper MPA, if there is no clear path and reliable partner for future upgrades and support. The MOD no longer has the financial power to keep bespoke systems up to date without partners to share the cost with: we do not want, in a few years time, to see the new MPA start declining in capability because it is a unique, bespoke solution which no one else is interested in investing in. For that, there’s already the Challenger 2’s rifled gun.
In my opinion this is one major point in favor of the Poseidon: none of the other competitors can promise the same assured future as the main MPA platform of the US Navy. The USN is the partner you want, if you seek economies of scale and a plan that ensures the system stays up to date.

Notorious “issues” with the Poseidon include the fact that, to depart as little as possible from the USN’s own variant, the UK will have to adopt the High Altitude ASW approach. This means having to not only integrate Stingray Mod 1 torpedoes, but having to fit these with the same wing kit that will be added to the USN’s MK54 torpedo for launch from high altitude. This will add some to the cost.
High Altitude ASW also means no use for MAD: the MAD is not a silver bullet and its usefulness is kind of limited, but nonetheless its complete absence is not entirely desirable. The US Navy is considering adopting MAD sensors built into expendable drones which can be dropped at altitude from Poseidon. If purchased, these will add some to cost, as well. The promise is that such drones will be very cheap, of course, but the reality more often than not is not quite as rosy as the original targets.
It is true, however, that the MAD drone’s cost would be compensated, at least in part, by not having to fit a MAD to the aircraft itself. Moreover, High Altitude ASW is less stressing on the airframe, and this should give a longer operational life, and reduce maintenance needs. 



Stingray Mod 1 will need a wing kit, to work as a part of the High Altitude ASW construct


High Altitude ASW also improves survivability of the MPA and its efficiency in the hunt: it is much harder, if not impossible, for the submarine to hear the incoming aircraft (turboprop, low-altitude MPAs are tipically picked up easy on passive sonar) and the high altitude puts the aircraft out of the range of the submarine-launch SAMs which are beginning to appear and that might become a factor to consider, in the future.


Recommendations:

-          Purchase P-8 Poseidon, with the mindset of it being an ISTAR / Combat ISTAR platform, not just a MPA
-          Secure the addition of a side-scan, surface search, GMTI-capable radar, ideally the same AAS being integrated by the US Navy. AN/APY-10 offers good capability as it is, but the addition of a dedicate radar would make the withdrawal of Sentinel pretty much painless in capability terms.
-          Phase out of service Shadow and Sentinel progressively as P-8 enters service.
-          Adopt the High Altitude ASW method, and in general stick as much as possible to the USN’s own configuration, to ensure efficiencies in long-term maintenance and upgrades
-          Look at integrating weaponry beyond Stingray: anti-ship capability and ground attack.
-          Secure the higher possible number of aircraft. Rumors talk of an initial purchase of 6, with 6 options. At least 8 / 9 would be needed, especially considering the wider ISTAR role.



A Tactical Reconnaissance Wing

In early 2002, the RAF ended the practice of having dedicate reconnaissance squadrons of fast jets, each with its own Reconnaissance Intelligence Centre (RIC), to merge these together into the Tactical Imagery Wing, which today provides deployable teams specialized in exploitation of Full Motion Video (Crossbow Flight, Tactical Imagery Wing) and others specializing in evaluation of imagery collected by RAPTOR and Litening III pods flown on Tornado and Typhoon (Orion Flight).

With the plan for the future being the dissolution of the Sentinel R1 fleet and the spreading of wide-area GMTI across multiple platforms (SCAVENGER, P-8 [?] and the AESA radars of F-35s and Typhoons], it is probably wise to expect the formation of a third flight within the Tactical Imagery Wing, this specializing in exploitation of GMTI information. The concentration of GMTI specialists in the same unit should help preserve the maximum level of experience and efficiency, while building on the successful methods of the TIW. With the focus expanding beyond “imagery”, the Wing should be known for Reconnaissance, or for Tactical ISTAR. As the Sentinel goes out of service, its bespoke Ground Station should be replaced by a “General Purpose” ground station to allow real-time exploitation of GMTI coming from whatever platform is available, be it Reaper or F-35.

-          Preserve GMTI exploitation experience by forming a dedicate Flight within the current Tactical Imagery Wing. Specialist teams from the new Flight will deploy in support of the various platforms over which GMTI capability will be spread, including F-35 and, in the future, Typhoon Tranche 3A with AESA radar. The new Flight should operate in close liaison with the Royal Artillery, since Watchkeeper also introduces its own GMTI capability, although of course on a smaller search area.    



Restoring strategic air refueling sense

In a plan that puts such importance on P-8, the continued lack of boom air refueling capability is unacceptable. The lack of boom is one of the most disappointing facts about Voyager (aka: take the best tanker in the world and dumb it down to a civilian passenger aircraft with drogues). Airbus can fix booms to Voyager within six months, and the cost, while significant, is unlikely to be prohibitive. Any spare money the RAF might have, in my opinion, should go towards this particular requirement.
Fitting the boom is more desirable than trying to fit a probe to P-8: the boom already exists, while a probe for P-8 doesn’t; moreover, the boom makes Voyager capable to also refuel C-17, Rivet Joint and allied aircraft.
It would solve the ridiculous, absurd situation of being unable to refuel some of the most precious, strategic platforms in the whole air force.
A good start would be to fit the two “fitted for but not with” centrepoint tankers in the fleet. The RAF’s core fleet of 9 Voyagers includes a civilian registered transport-only aircraft and 8 tankers, 7 of which are KC3 with centerline station as well as the underwing ones. However, only 5 of the 7 are actually fitted with the centerline drogue. These two should be the easier to fit with boom.

It is unfortunate, and a failure of the wider policy of engagement with allies, that despite a recognized shortage of tanker capability in Europe, up to 5 Voyagers are going to be stripped of tanking equipment and chartered out to serve as civilian passenger aircraft. Currently, only one of the 5 “surge” aircraft is already contracted by a civilian air line, but four more are seeking a similar arrangement.
Meanwhile, Poland is leading a multinational effort to purchase a common fleet of new A-330 MRTT tankers. It is quite amazing that an arrangement hasn’t been fleshed out to cooperatively run the Voyager surge fleet in its intended tanker role, to help counter the shortage. The UK should engage with its NATO partners to seek an agreement in this sense, adding the boom to as many aircraft as possible.


Recommendations:

-          Fit boom to Voyager, beginning with the 2 “fitted for but not with” KC3s in the Core Fleet. Unfortunately, Sentry can be refueled both by drogue and by boom, but A400M only by centerline drogue. So, part of the fleet will have to retain the centerline drogue instead of moving over to a boom, to avoid moving from one problem to another. A400M can in theory be fitted with the receptacle for boom refueling, but this would add yet more cost.



Common Weapon Launcher and reduced number of weapon types

The announcement of a contract for the development of a Common Weapon Launcher for Typhoon is to be welcome. However, the news releases suggest that this is an early demonstration contract, and the plan seems, as way too often happens, somewhat vague and indecisive. The aim of the Common Weapon Launcher is to introduce a rack which, while preserving the same aerodynamic shape and weight, so to ease integration on fast jets, can carry different loads, including 2 Paveway IV bombs, or 3 Brimstone 2, or (possibly) 3 SPEAR 3. The Common Weapon Launcher concept, shown in computer graphics and in mock-up form at some recent air shows, is clearly a derivative of the Brimstone triple rack. Since integration of Brimstone 2 on Typhoon has been funded (finally!), the choice is particularly wise, as the launcher will be aerodynamically cleared for carriage as part of this activity, allowing for considerable savings.

The Common Weapon Launcher should definitely be developed for carrying all three the main weapon systems: PW IV, Brimstone 2 and Spear 3. It should not be a Typhoon-only affair, either, but be exploited on the F-35 external hardpoints, as well.  

On the weapons front, considerable uncertainty, unfortunately, persists regarding SPEAR 3: the considerable expense needed to develop the wholly new MBDA weapon has lead to the “US Option” of going Small Diameter Bomb II growing in strength.
A final decision is now not expected until 2018. SPEAR 3 and SDB 2 are externally and conceptually very similar, but SPEAR 3 has a key difference: it embodies a small turbojet engine which gives it a greater range and the ability to be launched in a far greater acceptable zone, irrespective of altitude, wind conditions etcetera. SDB 2 is currently an unpowered, gliding weapon.
The greater range and launch flexibility of SPEAR 3 would make it far more capable against highly defended targets, and indeed make it into a DEAD (Destruction of Enemy Air Defence) asset, much needed since the RAF has given up its main SEAD (Suppression) weapon, the ALARM anti-radar missile, to budget cuts.
Raytheon, aware of this key factor, has started promising the development of a powered Small Diameter Bomb 2: if this was to materialize, the MBDA SPEAR would lose its key advantage, and it might become just too financially attractive to go with the US weapon, which in its base form can count on tens of thousands of planned American purchases. SDB 2 is also already planned for F-35 integration, which would also save money.
The MBDA SPEAR, on the other hand, is meant to keep the national weapon industrial capability alive and in good health.
As long as the MBDA SPEAR is the only one powered, long-range choice, I think the RAF should stick with it, even if it costs more. But if a powered SBD 2 becomes reality, the MOD will be faced with a much more difficult choice.

 
Common Weapon Launcher mock-up, seen carrying two Paveway IV bombs

Another key programme is SPEAR Capability 1, which is actually the spiral development of Paveway IV capability. Apart from better, more jamming-resistant GPS module, the Paveway IV should soon gain a new warhead option, with bunker-busting capability. The smart aspect of Paveway IV developments is that the external shape and the general mass remain the same, so that there is no need to repeat the aerodynamics part of the integration process over and over again.
The Paveway IV anti-bunker seem destined to replace the older, 2000 lbs Paveway III, which will go out of service alongside Tornado GR4.
Other Paveway IV developments include a low collateral damage warhead option; the addition of a seeker (IR Imaging, it is thought) for greater capability against moving targets; and eventually the addition of a wing-kit for much improved stand-off range.
A recent briefing given by US officers about the F-35 Block 4 software seem to suggest that the RAF has decided that the first two Paveway IV developments entering service will be the anti-bunker and the seeker.

 
MBDA's SPEAR 3, without its quadruple rack, seen on a Typhoon ahead of the flying testing campaign

The same briefing also suggests that the RAF wants to soon get moving about a “new build” ASRAAM. We might be close to the launch of a Capability Sustainment Programme for the short range missile, which should build on what has been done with the CAMM / Sea Ceptor. The integration of a two-way datalink is highly likely, if the programme actually secures funding. The data-link would massively enhance the capabilities of ASRAAM to acquire its target after launch and achieve high off-boresight kills.


Recommendations:

-          Proceed with Paveway IV developments, in particular with the anti-bunker variant to avoid a gap in capability when the combination Tornado/Paveway III bows out.
-          Whatever weapon is selected for SPEAR  3 should be powered, long-range, and have a wide acceptable launch region, to make it a viable DEAD solution
-          The Common Weapon Launcher should be developed fully, and used to full effect with both Typhoon and F-35
-          The ASRAAM CSP is not as high a priority, but adding a two-way datalink is important to give it true High Off-Boresight capability, which is needed to make best use of the F-35’s DAS “bubble” and HMD.



F-35 plans and babbling

Much noise has followed the blog post of David Axe of War is Boring about the leaked test report about the basic combat maneuvering trials begun last January between an F-35A and an F-16. The usual crowd has started self-quoting itself and shouting from the rooftops about how the F-35 had lost the dogfight and, indeed, how it could never win one. The answer provided by the JPO was to eager to dismiss the issue altogether, and actually ended up being a own-goal, adding to the noise (you need better media relationship experts, JPO: that answer really does suck).
Much of what has been said since is garbage. My general sentiments about the whole thing are very similar to the thoughts expressed here, so I recommend following the link and reading what the experienced C.W. Lemoine, an F-16 and F-18 pilot, has to say about it. 

In more detail, although I do not want to spend too much time on this, also because my own understanding of the highly complex art of air combat is limited and I don’t want to pontificate past my pay grade, the dogfight wasn’t even a dogfight.
Axe has since graced us all with the report itself. And reading it, as was to be expected, has allowed thinking heads to arrive to different conclusions to those that Axe, a notorious F-35 hater, drew. The first thing to notice in the report is the title itself: it was a test to experiment F-35 combat manoeuvres at high angles of attack.
The F-35 has excellent controllability at very high angle of attack. At entry in service it is expected to be certified for + 50° and – 10°, values much higher than most other fighter. F-16 does + 25°, Typhoon a little bit less, Rafale +29°.
What the test tried to determine was whether this capability has a value in dogfighting. The F-35 deliberately tried to manoeuvre at high angle of attack to see if it can “nose-point” like a Super Hornet. The result of the test, reading the report, say that in most situations, no, staying controllable won’t bring advantages. High Angle of Attack means losing energy very, very quickly, and the F-35 has a too high drag factor to keep its energy high enough to nose-point in a meaningful way without losing all its energy.
The test pilot said he found only one kind of manoeuvre which offers a repeatable firing chance: this one can be expected to end up in the tactics manual of the F-35, while the rest will be in the “don’t do this” list.
Outside of a test event, you are not forced  to seek high AoA in combat: if it is not advantageous, simply, you do not do it. And the air combat manual for the F-35, once written, will say this (obviously, in a much better and more detailed way).

For the rest, the report notes that the F-35 fights best around the 26° AoA angle, which is not surprising as it is a common value and particularly is the F-16’s area. The F-35 has been developed trying to obtain F-16 comparable maneuverability, after all.
In this area of flight, the test pilot expresses his frustration at the Flight Control Laws interfering with his commands: basically, the computer has limited the F-35’s agility to prevent a loss of control which was actually very far away. The test pilot at one point specifically mentions “fantastic yaw rate”, truncated by the unnecessary, unwanted, early intrusion of the computer.
The pilot’s recommendations, in the end, are to relax the control laws in the software, to let the aircraft pitch, yaw and roll faster.

There is a reason why the F-35 hasn’t had its full flying envelope opened up yet: the software control laws are still being tweaked and developed. The full flying envelope (Mach 1.6, 50.000 feet altitude, 50° AoA, max G) will only become available with Block 3F.
Block 2B, with which the USMC is about to hit IOC, is limited at Mach 1.2, 40.000 feet and 5.5 G, for example.
While the F-35 will never be a fighter defined by super-maneuverability, it will not be as limited as AF-2 was in the test. And it will not fight in the same way either, once the tactics will have been written down.
Read the report: the dogfight was a control laws test, at high AoA, with none of the aircraft involved being armed; none carrying a weapon simulation pod (needed for an actual dogfight) and with the F-35’s HMD having only a fixed reticle, absolutely not representative of the operational HMD.
There has been some rather wild jumping to conclusions going on.

I will close the “babbling” part with one question only: even assuming energy management in a dogfight is not on the F-35’s side, if you were a pilot given a choice, would you want to be on the jet which has to rush through the F-35’s BVR area to force a dogfight, or would you rather be in the F-35?
I will be in the F-35, thank you very much.

Back to the plans. The SDSR 2015 is, I fear, unlikely to provide the information we’d all like to have about how many aircraft the UK will ultimately buy. Main Gate 5, the decision point for the bulk order, has been set for 2017, and I think the government will be too tempted to leave the final decision for then. The SDSR will most likely carry on just with the plan for 48 aircraft for OEU, OCU and for the first two squadrons.

The plan is as follows:

17 Sqn (Operational Evaluation Unit) – Edwards AFB, USA

BK-1
BK-2
BK-4 (not yet delivered)

BK-1, 2 and 4 are instrumented aircraft, which will be used for development and trials and evaluation. BK-1 and 2 were among the first to undergo a retrofit, which might have brought them all the way up to Block 2B standard. 1 and 2 came in the LRIP 3, so were very early jets indeed, with quite a few limitations to overcome.


Training Unit – Embedded in the USMC 501 Sqn, Beaufort, USA, until July 2019.

BK-3
BK-5 (ordered)
BK-6 (ordered)
BK-7 (ordered)
BK-8 (ordered)

Currently, only BK-3 is available, but the training fleet will grow to 5 over the coming months and years. BK-3 was produced in LRIP 4, and will receive a retrofit later on.
The next aircraft assigned to training will be BK-5, 6, 7, 8, all coming out of LRIP 8. The LRIP 8 is much closer to the final, block 3F standard. It will be delivered with the TR2 computer processors and Block 3I software. The TR2 processor, introduced from LRIP6 onwards, means that passage to 3F will be a software change only.
The third generation HMD, which solves the well known issues of the Gen II helmet, should also come along.

Come July 2019, training of british crews in the US is expected to end, with the OCU moving into RAF Marham, where an Integrated Training Centre will have been built. It seems likely that the UK will seek to attract other European users of the F-35, beginning with Norway, hoping to get them to train their personnel in Marham.

617 Squadron – Stand up in Beaufort next year, transfers to the UK in April 2018, Deployable Land IOC by 31 December 2018

BK-9
BK-10
BK-11
BK-12
BK-13
BK-14

BK-9 to BK-14 will come from LRIP 9. A production contract will come soon, with Long Lead contracts having been already signed. LRIP 9 is expected to introduce the redesigned bulkhead 496 on the assembly line, which is the one which cracked during durability tests. The jets from the earlier lots will be retrofitted at the first Major Maintenance occasion.
If the current schedule is respected, the first frontline F-35s should thus be delivered already in their final shape, more or less, reducing to the minimum the number of retrofits which will be needed later. 

The following 4 aircraft:

BK-15
BK-16
BK-17
BK-18

are included in LRIP 10, for which the first Long Lead contracts have been signed. All should be in british hands by the end of 2018. Further aircraft will be needed to bring 617 up to strength and to stand up 809.
The following batches however haven’t been detailed yet, and the stand-up date for 809 is also not yet known. Both squadrons should be fully operational by the end of 2023, however. The OCU will probably initially be a Flight within 617 Squadron, but might be given its own identity later on. 

Expected F-35 global fleet in 2018
Trials at sea on HMS Queen Elizabeth are expected to begin around the end of 2018 and last to May 2019. They will take place in US waters, and will see the involvement of 17 Sqn and, most likely, USMC units. The trials should allow for Carrier IOC in 2020.

The UK is engaged in talks promoted by the US to place a “Block Buy” big order covering the years 2018 to 2020 (Lot 11, 12 and 13, with the first being the last of the "Low Rate" LRIP blocks, and the first two being the start of the full rate production). Placing a bulk order is expected to result in significant savings. Without even considering the partners and foreign customers, the US orders alone in these lots are expected to go from 126 (in Lot 11) to 176 (Lot 13). The quantities will be truly significant, in other words.
Regarding final number of F-35s to be procured by the UK, it is a shot in the dark still. It has been reported that, back in 2010, the RAF fought a bitter campaign to ensure recognition that the needed force level is some 9 squadrons, which could mean 4 F-35 units. However, 9 would mean one more squadron than the RAF has now, and 3 more than it will have in 2020 if the Tornado GR4 OSD isn’t pushed to the right again. Extending the service life of Tornado might become desirable not just because of its combat capability, but because keeping up the number of squadrons would help a lot in securing greater purchases of F-35S. If the number of squadrons is allowed to fall all the way down to 6, rebuild it up to 9 becomes a rather unlikely proposition.
A four squadron force with 70 to 90 F-35B is a good target to pursue, but in no way a given. 

In terms of evolution and capability growth, the F-35B will enter service capable to employ up to 4 internal AMRAAM, 2 external ASRAAM and up to 6 Paveway IV (2+4). It will also have the gunpod (operational as part of Block 3F).
The next big thing in the history of the F-35 is Block 4. This new software load will be delivered in four increments between 2019 and 2025. The list of things to add is being formalized, and should become definitive by the end of the year.
Improvements to the EOTS, video downlink and a new "big SAR" radar mode are pretty much certain additions. In terms of weapons, the UK is looking at integrating, in the order, Paveway IV bunker-buster, Paveway IV with seeker, ASRAAM CSP, Meteor and SPEAR 3. However, only by year end we will know (hopefully) what will be actually funded and included. 

The non-definitive list of weapons to be integrated in Block IV, as shown earlier this year by US officials

Pratt & Whitney is considering a plan of upgrades and improvements to the engine, with Block 1 in 2018 and a Block 2 with advanced adaptive technology “in the early 2020s”. Targets include substantial reduction of fuel burn rate, improved cooling (with benefits extending to engine service life), possibly thrust increase by up to 10%, and range improvements between 20 and 35%.
The engine is obviously a key part of any aircraft, so the evolution of the F-135 is something to watch very closely indeed. The P&W Block update plan is currently not part of the F-35 plan proper, but it would be important for the UK to join the initiative if it progresses. General Electric is also shaping its own plan for improvements, with both companies building on the work done as part of the US Adaptive Engine Technology Development (AETD) research and development programme.



Typhoon

Apart from the AESA radar, which hopefully will start serving on Tranche 3A aircraft in the early 2020s, the RAF might want to consider the integration of a reconnaissance pod, especially if Tornado GR4 OSD is confirmed for 2019, and RAPTOR is left without a platform. 

Much lower priority goes to the Conformal Fuel Tanks, which however remain interesting, since the carriage of Storm Shadow means no underwing tanks, and the targeting pod is only integrated for carriage on the central, wet pylon under the fuselage. 
Conformal fuel tanks would keep the available fuel up, while leaving the pylons available for weapons and pods. 
The Conformal Fuel Tanks however require also an aerodynamic modification kit, it seems, which makes their addition more challenging in terms of expense and downtime. The aerodynamic modification kit has just completed flying trials on IPA7 in Germany, and brings significant agility improvements as well, including bringing Angle of Attack value up to 36°.  




Conformal Fuel Tanks wind gallery tests


It would be nice to put Conformals on Tranche 3A at some point, but it definitely is the last voice on the list of priorities. Money is still tight, and it must be used on the urgent things first. 



Sentry

Budget shortages have left the RAF’s Sentry fleet lagging badly behind the rest of NATO. While the other AWACS across the alliance are getting significant upgrades based on the Block 40/45 (E-3G Sentry) entering service with the USAF, the RAF is literally out of the picture. This situation badly needs to be corrected as soon as possible, otherwise the interoperability will suffer, and the operational value of the british Sentry will continue to decline.



Airlift

Several improvements are on the way, and others could be made. The C-17 is receiving satellite communications, for example. On the other hand, the RAF continues to make no use at all of the tactical capability of the C-17, which is only used as a strategic cargo flying from A to B. This is, in my opinion, an unjustifiable waste, and opening up some of the latent capability is something I will keep recommending.
A Boeing C-17 International Training Centre is standing up in Farnborough, with a full flight simulator and engine ground running courses. Parachuting and aidrop training could follow, if the capability is finally pursued.

The non-exploitation of the C-17’s airdrop capability is made worse by the fact that the C-130J itself is currently partially handicapped in this role: the withdrawal of the old C-130K has left the RAF with no capability to employ Medium Stressed Platforms for the airdropping of vehicles, L118 Light Guns and other key, large equipment for the air assault task force.
A replacement platform will be put in service for use on the A400M, but we are talking of a gap that will stay open for a few more years, as it’ll be 2017 or 2018 before the Atlas is ready for the task.
The RAF seem to have attempted to close the gap by putting out a request for a modified Medium Stressed Platform compatible with the C-130J’s cargo floor system. Delivery was planned for June 2015, but it is not clear what the status of the programme is.
The new airdrop platform should come with greater capability. The American Type V platform is one option. A clear requirement includes the ability to airdrop a Jackal, which is now part of the Air Assault Task Force’s equipment.

Investment in airdrop is to be supported. Modern precision airdrop equipment can ease immensely the resupply of troops from the air, and large kits allow the dropping of bulky, heavy loads, reducing the need for a small, tactical cargo capable of intra-theatre lift.
The RAF, for this role, is only going to have the 2 BAe 146 QC MK3 procured under UOR. So it’ll be Atlas, or 146 MK3. Expanding airdrop capability will compensate.

Another gap left by the withdrawal of C-130K is the Special Forces support. Unfortunately, the internationally developed software upgrades needed as base of Project HERMES, the fitting of SF equipment to the J, have suffered monstrous delays. Block 7.0 has run so late that it has been actually incorporated into Block 8.1, causing a much longer gap than once anticipated.
Block 7.0 is the biggest upgrade to the C-130J since entry in service, introducing tactical data capability, a new flight management system, new processors and 26 other changes, and it has proven challenging, to say the least. While not much has been said about it, Block 7 work has kept ZH866 in the US for over two years, returning only in December 2014 to then begin flight testing at Boscombe Down, ahead of further modification into Block 8.1.
It seems that Block 7.0 (and later) aircraft are to be known as C6, such is the extent of the changes.
In the meanwhile, at least, 9 of the C-130Js have been fitted with external fuel tanks giving a significant increase in range.

The now combined Block 7.0 / Block 8.1 modification deliver software upgrades; new Communications, Navigation, and Identification System Processor (CNI-SP); Link-16; new control wheel; new Civil Global Positioning System (GPS); new mission computer; upgraded Data Transfer and Diagnostic System (DTADS); new Identification Friend or Foe (IFF) Transponder Mode 5; Automatic Dependent Surveillance Broadcast (ADS-B); enhanced internal-communication system (ICS); Communications, Navigation, and Surveillance/Air Traffic Management (CNS/ATM) Data Link; improved public address (PA) system; and covert light aft of the cargo ramp.
However, flight testing of Block 8.1 is expected to wrap up in 2019, quite a while away still, and the risk is that the Special Forces support gap will only be closed right before the C-130J leaves service, in 2022!

 
The welcome addition of external fuel tanks on a C-130J C4 (long fuselage)

The rumors suggest that there is a strong current within the Special Forces and the RAF calling for the running-on of 7 to 9 long-fuselage C-130Js beyond 2022 (the ones fitted with external tanks?), specifically for the Special Forces mission.
The official line for now remains that the A400M will absorb the special forces mission by 2022, but if there’s someone who might get what it wants, that is the Special Forces Director.
The A400M is expected to equip 70 Sqn and 30 Sqn (the first for sure, the second sqn has yet to stand up), while 47 Sqn, unless C-130Js are indeed kept for SF work, will be disbanded.

The A400M has had its IOC delayed from March to September this year. 7 aircraft are required for IOC, and so far the RAF has received 3 (ZM400, ZM402, ZM403). A fourth A400 has flown to Brize (the future ZM401) but is still marked with an Airbus code while it undergoes work for the integration of the DAS defensive system. At least 3 more A400M are approaching their delivery date, and will fly to Brize over the next weeks.


Recommendations:

-          Procure modified airdrop platforms for the C-130J in order to close the gap. The lack of Medium Stressed Platform is a major problem for the air assault task force, and makes it a lot less credible.
-          Invest in platforms for heavy airdrops in the longer term, with payloads including Jackal in mind, and in precision airdrop kits. Some have been procured as UOR for Afghanistan, but they should become a more common capability.
-          Ideally, run on 47 squadron on C-130Js for the Special Forces operations beyond 2022
-          Gradually bring online tactical capabilities for the C-17



Training

Contract signatures for the purchase of the new fleets of fixed wing training aircraft are expected soon. The Grob G115, the Tucano and the Beechcraft King Air 200, used respectively for Elementary, Basic and Multi-Engine training are due to be replaced by G120TP, T-6C and Phenom 100.

If the recent NAO report on the Military Flying Training System has the right figures, the renewal will be accompanied by rather dramatic reductions in the number of aircraft and instructors, and by a growth of synthetic training on simulators. The NAO expects that the Elementary Flying Training fleet will go down from 40 to 23 aircraft, with military instructors falling from 44 to 35, but with civilian instructors growing from 17 to 23.
Simulators will grow sharply in relevance, with synthetic training hours growing from 0 to 35% of the training programme.

The most evident reduction, however, is expected in Basic Training, where the NAO expects only 10 aircraft, down from 40, with military instructors going from 48 to 15 and civilians from 1 to 5. Simulation will grown from 33 to 46% of the training programme.
The Basic Flying Training will leave RAF Linton-on-Ouse (which I guess is then very likely to close down) and move into RAF Valley, probably at the same time as 208 Sqn, on Hawk T1, disbands. More on this later.

Multi-engine training will see the fleet reduced from 7 to 5 aircraft and from 25 to 16 military instructors, with civilians going from 0 to 6.

There will be little to no excess capacity to train foreign students. This dramatic reduction ties in with the planned sundown of the Hawk T1’s role in training: the plan is that flying training of british personnel on the T1 of 208 Sqn will end in early 2016. 208 Sqn will continue to train foreign students until December 2017.
208 Sqn was once planned to disband in 2012. It was saved by the signature of contracts to train crews coming from the Middle East. But it seems that its time in the sun is limited, and that by end 2017, early 2018, disbandment will again be on the cards.
The guess is that the “naval 8”, as 208 Sqn is known, might become the new Basic Flying Training squadron, taking up the role from 72 Sqn as the Tucano goes out of service and training moves to Valley.

A major question mark remains on what will happen to the Hawk T1s used in “aggressor” role in support of training by 100 Sqn RAF and 736 NAS. A replacement for the Hawk T1 has not yet been identified.

Simulation will continue to grow in importance. Recently, the RAF has acquired simulators even of the gliders of the Air Experience Flights and University Air Squadrons. An Immersive Close Air Support Simulator has been purchased to contribute to the formation of JTACs.  

The renewal of the rotary wing training fleet is expected to follow in 2018.