Solving the Ocean problem



The LPH(R) program has been dead for several years now, and like it or not it is officially down to the carrier(s) to replace the capabilities currently brought to the table by HMS Ocean. Now alone in the LPH / Commando Carrier role, with HMS Illustrious going out of service, the newly refitted HMS Ocean is almost certainly on the last leg of her life. Her OSD is likely to be confirmed for 2018, and the carrier, hopefully but not certainly the both of them, will have to accomodate her role into their schedule as well, or the Royal Marines risk to face a grim future. 

Since 2010, years of effort to build up the most complete and credible amphibious capability in Europe have been squandered and crumbled by reductions in shipping, in supports, in vehicles and landing craft projects. Having recently re-read "3 Commando Brigade in the Falklands No PicNic", by Major General Julian Thompson RM, it is very much alarming to see how the last three years have brought back the Marines on the same dangerous edge of destruction they faced in the early 80s.
The brigade today would have much the same problems it had in 1982, which means, to my cynic mind, that 31 years have been largely wasted and no lesson has actually been learned firmly enough to avoid falling back into the same old pits. The brigade was desperately short of helicopters back then, and would have even less today: 847 NAS is going to have just four, perhaps six on deployment Wildcat helicopters, and the Sea King HC4s (which was new in 1982, and is very old today) are far less than back then. Their replacement, hopefully fully online by 2020, will be of just 25 Merlin HC4 in total.
Save for the introduction of Viking and some other kit, the brigade has less of everything: less light guns, less helicopters. The loss of HMS Ocean and the incoherent, messy plans for embarked fixed wing aviation would put the brigade back in the same position as in 1982: no air superiority, no adequate air reconnaissance, little in the ways of air support, and no appropriate helicopter support ship for amphibious operations.

The Royal Navy is probably not without its faults. Thompson in his book remembers how the Navy already in 1970, pressed by cuts and budget problems, tried to halve the number of Commandos from the then 4 down to 2. Ironically, back then it was the Army's opposition that prevented that from happening.
In 1980, the Navy tried again, because faced by the cost of the submarine-borne nuclear deterrent (see the similarities? There's the Successor SSBN on the horizon...) and by a very limited and precise sets of roles assigned in the Cold War scenarios by a MOD 100% focused on Germany and convinced that out of area operations would never happen again. Instead of directly proposing the disbandment of Commando units, the Navy focused then on axing the amphibious shipping (again, see the similarities...). Thompson was told so in December 1981 by First Sea Lord Henry Leach. Not without sadness, of course, but that was the direction the Navy was inclined to follow to preserve other parts of its "body". Argentina's hurried, foolish move came a few months early: had they let the winter pass, and acted later, the carriers and amphibious ships would have all vanished, victims of cuts, and the islands today would be named Malvinas.

The Royal Marines of today are precious to the Navy. Their involvment in Afghanistan has made the whole navy proud and has kept the admirals at the table. During 3rd Commando Brigade tours in Afghanistan, up to 40% of the total british involvement in Afghanistan was covered by the Navy. In a land locked country. This was an immense demonstration of how flexible and full-spectrum the navy is, one aspect that should very much be used to reinforce the case for maritime power investment when sitting at the budget table. Investing in the Navy does not and should not mean "just" ships. There are excellent reasons for making the Navy the centre of what is supposed to be an expeditionary armed forces structure.

Moreover, the flexibility of the RN Response Force Task Group has been proven multiple times since the SDSR came out, with the quick response to events in Libya and, to a lesser degree, to Sirya, and then the Philippines natural disaster. 
In a time in which Her Majesty's Government wishes to continue to play a big role on the international stage while avoiding to put boots on the ground in a traditional, expensive and risky way, the unique ability of the Response Force Task Group to bring enduring, self-supporting power (land, sea, air) without having to actually "go all in", is a major premium that needs to be highlighted, understood, funded and exploited.  

The Navy HQ is, this time, on the Marines's side, thankfully. The involvment of Navy HQ in the fight to save 148 Meiktila and 24 Cdo Eng is telling, in this sense, and has had some success, with both being (at least partially) saved from the chop. 1st Sea Lord Zambellas has said recently while speaking in the US that he sees a strong case for the Marines, and that he does not expect further reductions, but actually thinks there's a case for growth. 
I absolutely agree, but despite the nice words, the many problems remain and the way ahead isn't clearly marked.
Only recently, the cuts in manpower to supporting elements of 29 Commando Royal Artillery (REME in particular) have forced the commander to decide that the planned retention of 3 gun batteries is pretty much unachievable. 7 (Alma) Battery is to leave Arbroath (save for a Fire Support Group which continues to fly the flag, possibly to avoid scottish rage!) to retreat to Plymouth, where it will join the pooled resources left to the gun batteries, to task-generate one battery to support the Response Force Task Group. 
As always, the shortage of supporting elements stemming from Army 2020 comes out in the light: and again i ask, what use 31 infantry battalions if to keep all of them they have to be small and scrawny, while also affecting disproportionately the supporting elements that make them deployable and useful in the first place...?

The Army, faced with its own painful cuts, is rowing against the Marines as it has been trying to redirect cuts away from its main formations. The cuts to 3rd Commando Brigade army supports were originally planned to be even worse, and thankfully Navy HQ stood up firm for once, and avoided the worse scenario becoming true. The parts have inverted from the 80s, but the Royal Marines still sit in the middle, in an uncomfortable position. 
The Royal Navy itself, while supportive, is stretched far too thin in manpower and budget terms, has accepting tough reductions in amphibious shipping capability despite its support for the Marines, and the senior service notoriously faces an uphill struggle in manning figures over the coming years, which put both the second carrier and the three new OPVs in danger: the first might "enter service" only partially, being tied mothballed most of the time and only pulled into activity when the other hits refit time (like with the LPDs HMS Albion and HMS Bulwark post-SDSR 2010); the seconds might end up being brought into service at the expense of early decommissioning of the three River class vessels currently in service. Despite them having entered service as early as 2003 and despite a 39 million investment in 2012 to purchase them outright, as they earlier were contractor owned and given to the Navy on lease. 
I fear this is a defining moment: the SDSR 2015, despite the optimism of some, is highly unlikely to be a happy rebirth of defence. It'll be a matter of new, painful choices. May the 350th birthday not be the last of the Royal Marines as we know them.

Under Carrier Enabled Power Projection it has been effectively written in stone that it will be down to the carriers to absob the amphibious force's aviation requirements, as the previous practice of geographically separated Amphibious Group and Carrier Group has been cancelled as unaffordable, and replaced by the all-singing all-dancing Response Force Task Group. A number of studies have been launched as a consequence, and most of them are centered on the carriers.
HMS Queen Elizabeth's commander has said in its Twitter answering event a while ago that carrying LCVP landing crafts in the boat bays is being considered for the future; a study is underway (or has finished, the wording in the reports does not make it too clear) on how to organize and paint the deck of QE to provide 10 spots for simultaneous helicopter operations (up from an initial design of 6 very large spots. There are, anyway, 12 deck positions serviced to serve as aircraft / helicopter operation positions).
The carrier has room for 250 Royal Marines and can carry more depending on how the air wing is shaped (and the related manpower figure changes consequently); using the boat embarkation area aft of QE for some Marines to boat transfers will probably be investigated as well. 


The 200-pages book let out by the Royal Navy in occasion of the naming of QE also adds that using some of the available space to increase EMF accommodation and support spaces at the first refit is being looked at. There will be a lot of work to be done to certify ships spaces and facilities for the Embarked Military Force's helicopters, stores and ammunition.
An indicative all-LPH TAG has been defined as a flight of 3 Chinook, 12 Merlin HC4, 8 Apache and 6 Wildcat; while an Hybrid air group comprising 6 - 12 F-35B plus helicopters for a Commando group is being studied.
(see pages 68 and 69).

The vehicles capability of HMS Ocean is not particularly noticeable, and anyway it was relatively often out of the picture when HMS Illustrious or another of the CVSs served as Commando carriers. As was to be expected ever since her sister was not built. So in itself this will not be too much of a blow, while certainly not helpful. 

HMS Ocean's capability to carry light and medium vehicles, and deploy them to the shore, is quite limited. The vehicle deck is small, and the vehicles can only drive down to landing crafts thanks to a ramp and a floating, folding pontoon that the ship carries on deck and deploys in the water by crane.
The vehicle deck, (53) is small. There is a ramp leading to the flight deck, one leading to the stern exit, and a RoRo ramp in the side for port embarkation / disembarkation
The floating pontoon can be seen on deck in this photo. The exit of the flight deck vehicle ramp can also be seen. The pontoon, folded, is carried on top of the structure of the ramp's exit.
The side RoRo ramp for embarkation
 
HMS Illustrious, serving in the Commando Carrier role, has no RoRo ramps or vehicle deck. Still, it has been seen embarking small numbers of vehicles, including BV206s as in this photo. Helicopter delivery to the shore via Chinook, though, becomes the only available option.

There is also a chance to absorb some or all of the negative impact depending on how MARS FSS shapes up to be: the Fleet Solid Support requirement has merged with the previously separated Combat Support Ship Auxiliary (earlier called the Joint Sea Based Logistics, a ship that would have been designed and built specifically to support ground forces ashore with stores, vehicles and afloat maintenance workshops) and the early designs the MOD and the industries of the Naval Design Partnership have put together include carrying a couple of LCVPs and having a RoRo deck with steel beach or even a well dock, giving some very real capability to carry and deploy ashores stores and even vehicles. Depending on if and how MARS FSS progresses post SDSR 2015, the problems might be in large part ironed out. 


The early concept for MARS Fleet Solid Support would help plug the gaps in amphibious capability, making it twice as important. Her new generation Heavy RAS equipment and vast cargo holds already make this vessel extremely important to support the logistic requirements of the carriers in high intensity ops.

The next SDSR will be a turning point of huge proportions. And the navy desperately needs to get this one right.



There is always some room for dreams, as long as you remember what reality is like.

A perfect solution would be to have HMG get serious about sanctions versus Russia, by exploiting the unique chance represented by the two Mistrals being built by France. It is painful to observe how well things could slot into place, if there was the money and political will to place such a blow. The two vessels could probably be taken up and re-fitted with RN communications, weapons and essential kit to enter in service in 2016 and in 2018: the first could replace the LPDs Albion and Bulwark. 
In 2016, Albion is expected to be re-activated from her current sorry state in HMS Tamar, Devonport, by removing the seals and controlled humidity kit that keeps her dormant and, hopefully, well preserved and by re-storing her to bring her back into active service. Bulwark, which would hit her refit point that year, would be mothballed in her place. 
The first Mistral could be used to replace the LPDs, and it would be a painful (they are still young ships) but actually pretty advantageous trade, capability-wise. The Mistrals have greater troop and vehicle cargo spaces, a well dock of equivalent capability, and, crucially, a hangar and flight deck allowing them to be a replacement for Ocean at the same time. On the other hand, Mistrals have no davits for LCVPs. 

The vehicle deck of Dixmunde, french Mistral-class LHD, used to bring armoured vehicles to Mali

The vehicles / cargo spaces are much larger than on the Albion-class LPDs

The cost would be (partially) offset by doing away with the need to refit the LPDs any further, and by a substantial reduction in the number of LCVPs. The second Mistral, in 2018, would directly replace HMS Ocean, and two ships would replace three, of different types. 

HMS Bulwark's vehicle deck. The ramp in the centre leads up to the flight deck. Beyond the ramp, there's the well dock with the LCUs. Behind the standing officer, there's the side RoRo ramp of access.
the dock of HMS Bulwark. Rolls of Trackway and BV206 vehicles can be seen in first line in the vehicle deck.

It would be a more than happy trade in terms of capability, but not financially fair enough to make the plan cost-neutral. Which is the reason why this scenario is a dream. It is a semi-serious, dreamy suggestion due to the high and sudden up-front cost of taking the ships and fit them out for RN use. 

Then again, it would be a great investment for the future. 


Friday, April 11, 2014

The evolving budget situation: Reversing other bad decisions - 24 Commando Engr wins the day

7: Capabilities in the air  
8: GEOINTELLIGENCE improvements
9: Reassuring (with risks)


24 Commando Engineer regiment wins the day

I reported last year about the ongoing fight that Navy HQ and the Royal Marines were fighting to ensure the survival of 24 Commando Engineer Regiment. The news available in the open were few and sparse, but the delay in disbanding the formation was evident, and by november 2013 there was some optimism.



For once, this optimism has been rewarded, as a bit of common sense has won the day for once. Yesterday, the Minister for the Armed Forces, Mr Mark Francois, made a statement in Parliament that confirms that this battle is won: the regiment will not disband.



On 5 July 2012, Official Report, column 1085, the Defence Secretary made a statement to the House on the outcome of the Army 2020 review and laid out the future structure of the British Army. The announcement explained the need to restructure the Army to face an increasingly uncertain world and to create the agile and adaptable armed forces as set out in the 2010 strategic defence and security review. Included in the statement was the withdrawal of 24 Commando Engineer Regiment.

At the time of the Army 2020 announcement, the Army acknowledged that engagement with the Royal Navy was still ongoing, and this would refine the allocation of Army manpower available to support Royal Navy tasks. This process is now complete and it has been decided that 24 Commando Engineer Regiment will be retained although the regiment will be reduced in size. This change will be achieved by rebalancing Army manpower within 3 Commando Brigade and allows for the best use of available resources to deliver the strategic defence and security review and Army 2020 capability.
We envisage that these structural changes will be implemented by no later than July 2015. 24 Commando Engineer Regiment will remain in Royal Marines Barracks, Chivenor (Barnstaple).

The regiment won't disappear, and this is a major step forwards. But it is still shrinking, and considering that it never even gained the second regular field squadron that was once planned and that remains very much needed, this is no good. It is a step in the right direction, but this regiment should actually be growing in size to better respond to the busy schedule of the high-readiness amphibious force.
There is also some worry behind the meaning of "rebalancing army manpower" within the brigade, which knowing politician language could hide unpleasant news, perhaps to hit 29 Commando Royal Artillery (which already had to win its own fight earlier, to ensure the survival of 148 Meiktila Bty).

But at least, it is a step in the right direction. Let's take away some joy and hope from it.

Monday, December 2, 2013

The evolving budget situation: force structure - UPDATE




Big and small changes have taken place in the structure of regular units, and more changes will happen in the coming months and years. Unfortunately, tracing all of them is complex, as we don’t have a published sub-unit level scheme announcing the changes that will take place. One was printed for the Reserves (which incidentally gave us some information on a few interested regular units which got directly touched by the changes) but none for the regulars, so keeping track of each change is a matter of keeping up with each little hint dropped in MOD publications, as well as the news about disbandment parades on websites and social media connected to the forces.



Air Assault

Serious change has been underway within 16 Air Assault Brigade with its reduction to just two regular army manoeuvre units (2nd and 3rd PARA) plus the reserve PARA battalion (4th PARA). The supporting formations within the brigade have morphed to adapt to this new structure and to the needs of delivering, on rotation, a air assault battlegroup at high readiness.

7 Royal Horse Artillery has lost two batteries, with V Bty disbanding and going into suspended animation and with H Bty (Ramsay’s Troop) moving to 1 Royal Horse Artillery to become a Precision Strike battery (with GMLRS and Exactor).

The regiment retains a total of three batteries, with I Bty (Bull’s Troop) as HQ Bty and F (Sphinx) Bty and G (Mercer’s Troop) batteries in the Light Gun role, each with 6 guns plus Fire Support Teams. The two gun batteries have been reinforced in their support and command elements so to be better able to deploy autonomously in support of the battlegroup at readiness.



The brigade’s logistic regiment is growing in establishment fro 500 to some 650 men by gaining command of 47 Air Despatch squadron (in Brize Norton) and 65 Logistic Support Squadron, which is moving into Colchester. On the other hand, one of the air assault close support squadrons is disbanded (15 Sqn), leaving 24 HQ & Sp Squadron plus two close support squadrons, one for each regular battalion (63 Sqn and 82 Sqn).



23 Air Assault Engineer regiment is also restructuring and shrinking by some 130 posts. 12 (Nova Scotia) HQ Squadron has been disbanded, and its relevant capabilities have been redistributed to the remaining 51 and 9 Squadrons, which are becoming larger and more independent, so that they can best support the formation, on rotation, of the battlegroup at high readiness.



7 REME battalion has also undergone some changes and adjustements, being more closely integrated with 132 RLC Aviation Supply Squadron: the Motor Transport platoon of 7 REME has been absorbed by 132 Sqn. 7 REME retains its three Aviation Companies (71, 72 and 73).



It remains very disappointing how the brigade has been run down in strength. The reduction to just two manoeuvre units plus one reserve battalion for reinforcements is highly questionable: not only does it greatly reduce the effectiveness of 16AA as a deployable brigade, but it seems to be a source of strain and difficulty even in the stated plan for the generation, on rotational basis, of a battlegroup at readiness, as there are effectively only two battalions, two artillery batteries, two logistic squadrons and two engineer squadrons which will take turn, in and out of high readiness. This seems very likely to put the brigade through some serious operational stress.



To make things worse, 299 (Parachute) Engineer squadron, the Reserve squadron tasked with support to 23 AA Regiment, is being removed from the control of 23 Rgt to be instead re-subordinated to 21 Royal Engineer regiment, no later than December 2016. This seems to make no sense at all, as the squadron will be assigned to a line engineer regiment: it is not clear if the idea is to have the squadron having “double loyalty” to two regiments and two rather different roles at the same time, or if the squadron will eventually cease to support the Parachute engineers. In both cases, the change makes very little sense as it further reduces the effective resources available to the air assault brigade to sustain its demanding force generation cycle.



The reserve artillery battery which used to support the Air Assault Brigade, 201 Bty, 100 Royal Artillery regiment, is to be disbanded and put into suspended animation “not before April 2014”, weakening the artillery resources of the brigade as well.



Finally, this new, unwise “rule of the two” is rumored to be on the cards for the Apache helicopter fleet as well, which is widely expected to reduce from 6 to 4 squadrons, in two “binary” regiments. After all, if the regiment stays, all is fine, isn’t it? Much easier to hide sub-units disbandment to the general public. One day, if things continue down this path, all that will be left will be “regiments” with the consistency of companies.






Commando



Support to 3rd Commando brigade has been, and very possibly still is, a battlefield over which Land Forces HQ and Navy HQ are fighting an underground war. The Navy has had some success in this war: while 1st RIFLES was moved out of the Commando brigade, the Navy successfully resisted the plan for disbandment of 148 (Meiktila) Battery, plan which was put forwards by the Army but shot down in the later negotiations.



The Army 2020 plan however contains the announcement that 24 Commando Engineer Regiment is to disband. The regiment was stood up in 2008 in order to give the brigade much needed organic engineer capability, indispensable for brigade-level deployments, with the Army keen to continue using 3rd Commando in Afghanistan. The regiment was to expand over time, forming a second field squadron (56 Cdo Sqn) in addition to 59 Cdo Sqn and 54 HQ & Sp squadron.

56 Squadron actually never managed to stand up, and in the Army 2020 plan, the regiment is to be lost, with 59 Squadron returning to be “independent”, complete with some of the capabilities currently provided by 54 HQ & Sp Sqn.   

In practice, the regiment would shrink from an establishment of 360 / 380 down to around 270 by the summer of 2014



54 HQ & Sp Sqn includes a reconnaissance troop, a support troop, a signals troop a motor transport section, a resource cell, a training team and a construction supervision cell. 59 Commando Engineer Squadron is made up of 3 field troops and a support troop.

With the disbandment of the regiment, 59 Cdo Engineer Squadron would have to expand to inherit at least a part of the capabilities of 54 HQ & Sp.



However, the last word might have yet to be said regarding 24 Engineer Regiment. Lieutenant Colonel Leigh Tingey, commanding officer of the regiment, wrote on 1st November 2012 that the decision to disband the regiment has not been accepted by the CO 3rd Commando Brigade, nor by the Commander General Royal Marines (CGRM) nor by Navy HQ, signaling that the war was still on within the MOD and offering a ray of hope for the future of the formation. I’ve not been able to find any indication of the state of this war, but it is worth remembering that the Army 2020 document as published said that 24 Cdo Engr would be removed by the ORBAT “not before April 2013”. Of course, that indication is vague enough that it could happen any time in the future, but nonetheless we are in December and the regiment is still in place.  



The commando battalions are planned to rotate into high readiness (5 days notice to move) to form the Lead Commando Battlegroup, which also has to include artillery, logistic and engineer resources. It is evident to any observer that a single engineer squadron won’t be able to generate more than a troop of 30 men or so for the support of a 1800-strong battlegroup. This is ridiculous, and it is only logical that the Royal Marines and Navy HQ revolt against such a plan. The Army, on the other hand, is likely to require that the Royal Marines and Navy provide the manpower and funding to keep the regiment going (and hopefully actually standing up 56 Squadron as well). And this will be very challenging for a navy that already struggles to fit inside a (ridiculous) mandated manpower total of 30.000.



The Royal Marines will also have to face an increased workload as P Squadron, 43 Commando Fleet Protection Group, disbands by the end of the year. The 167-strong squadron, manned by Navy personnel and not by Marines, stood up in 2010 to provide Force Protection teams to embark on RN and RFA ships, especially in a counter-piracy perspective. The disbandment of this squadron means that the commando battalion in its “standing tasks” period will be asked to provide such teams for use on ships, making the Marines even busier. The force generation cycle was meant to see one Commando at High Readiness, one training for its turn in high readiness, and the third “resting” after its own turn at high readiness. The disbandment of P Squadron changes this substantially. In the words of Jane’s in the special report on the future of the Royal Marines:



In developing the new rotation, it was originally envisaged that the third Commando unit - the one 'out' of the role - would be engaged in low level training and would take on the numerous support tasks that continually arise, including support to training courses and ceremonial duties. In reality, however, a much greater number of functions has had to be absorbed. A significant one of these is the ship protection task previously undertaken by a predominantly naval squadron within 43 (FP) Cdo RM, a squadron that is being disbanded. This task covers the provision of security for naval vessels when alongside, and some boarding tasks in low threat environments.
The net result of the accumulation of these tasks is that the third unit is now classified as the 'standing tasks Commando' rather than the 'out of role' one. As this unit is also heavily committed, the overall effect is the need to generate about 1.7 units of tasks from the three units.



To make things worse still, like with the PARA, the reserve artillery battery assigned to the Commandos is change role completely, moving into 104 Regiment to work with mini UAVs, and 131 Independent Commando Engineer Squadron is to resubordinate under 32 Engineer Regiment, creating the same contradictory situation as with 299 (Parachute) Squadron.



In practice, the high-readiness brigades, despite the high demands placed on them in terms of readiness and force generation cycles, are being, in a way or another, weakened and deprived of important supports which will make it challenging to achieve all what is asked out of the formations. Both brigades, in addition, have been severely weakened and their viability as deployable brigades is questionable. Both would need consistent reinforcement from other formations (a third manoeuvre battalion for 16AA, with associated supports; appropriate engineer resources for 3rd Commando) in order to properly deploy in the field as 1-star formations. The rationale of these changes is, to say the least, questionable.






Royal Signals



The Signals are undergoing significant change as most of the surviving regular regiments become Multi Role Signal Regiments (MRSR)  as the brigade and division-organic signal formations are removed, with the exception of 216 Signal Squadron in 16 Air Assault brigade, which will stay.

In practice, the Royal Signals resources are being centralized in the two signal brigades, and will be assigned only for training and deployment.



The MRSR build upon the experience of the “campaigning” regimental organization developed to support Operation Herrick with a constant rotation of Signal units to the rule of the 1 in 5. The regiments becoming MRSR are:



1 Signal Regiment
2 Signal Regiment (including one Queen’s Gurkha Signal Sqn)
3 Signal Regiment
16 Signal Regiment
21 Signal Regiment



Each of these regiments, once the restructuring is completed, will have 3 Field Squadrons and 1 Support Sqn. Each MRSR is being equipped with the FALCON system, with at least 11 FALCON detachments being assigned to each regiment. Once deployed in the field, the MRSR will be tasked to provide the whole spectrum of communications needed by the manoeuvre force and its HQs. How exactly Real Life Support will be delivered to brigade and division HQs is still being worked out.



216 Signal Squadron has undergone a restructuring to better support the force generation cycle required for the formation of the Air Assault Battlegroup. Curiously, 216 has been restructured on 3 Comms Troops, from 2 previously, with the re-instatement of Charlie Tp. The squadron also has its training wing and Motor Transport / Light Aid Detachment troop.



1 Signal Regiment [ex-Signal regiment organic to 1st (UK) Division HQ) will see the squadrons 201 and 212 merging to form a single squadron the identity of which is not yet know. 200 Signal Sqn (ex organic squadron of 20 Brigade HQ) will come into the regiment, providing the second Field Sqn, with 211 Sqn being the third. The HQ & Sp squadron completes the new-look MRSR. The regiment will transfer from Germany into Beacon Barracks, Stafford, under PROJECT BORONA.



21 Signal Regiment is losing its special role of Air Support regiment, and two squadrons: 244 Sqn transferred under command of 30 Signal Regiment, while 43 (Wessex) Signal Squadron (Reserve) transferred to 39 (Reserve) Signal Regiment.

21 retains the HQ & Sp squadron, plus 214 and 220 Sqn. The third Field Squadron will be 204 Sqn (ex organic squadron of 4 Brigade HQ) which has disbanded in its current form and will stand up in its new format by 2015.



2 Signal Regiment has the support sqn plus 219 and 246 Gurkha Sqn. A third squadron will be added, possibly another of the squadrons that so far had been organic to manoeuvre brigade HQs.



16 Signal Regiment is in the same situation, with Support Sqn, plus 230 and 255 Sqn. The regiment is also moving to Beacon Barracks, Stafford, under PROJECT BORONA.



3 Signal Regiment has the squadrons 202, 206 and 258 plus Support Squadron.



The 5 Regiments will come under the direct command of 7 Signal Group itself part of 11 Signal Brigade.



Specialist ICS enablers will be one of two functions commanded by 2 Signal Group also part of 11 Signal Brigade and include:


10 Signal Regiment (ECM(FP)/ICS Infrastructure) comprising 225, 241, 243, 251 and 81(V) Sqns.


15 Signal Regiment (IS) comprising 233 (Global Comms Network), 259 (Global Information Support) and 262 (Logistic System Support) Sqns.


299 Signal Squadron (Special Communications)


The support to UK and National resilience will be commanded and delivered as the second function from within 2 Signal Group.

It will include:


R SIGNALS TA Regiments
251 Signal Squadron, 10 Signal Regiment



1 Signal Brigade will command the support to both HQ ARRC and the JRRF comprising



22 Signal Regiment (comprising Sp Sqn + 4 Fd Sqns ( one QGS Sqn)). The Squadrons are:

-          217

-          222

-          248 Gurkha

-          252

-          Sp Sqn


30 Signal Regiment (comprising Sp Sqn + 4 Fd Sqns ( one QGS Sqn)). The Squadrons are:

-          244 (coming from 21 Regiment)

-          250 Gurkha

-          256

-          A new squadron to be determined

-          Sp Sqn


ARRC Support Battalion.




Other EW and ICS Support. Outside of our Signal Brigade Structure R SIGNALS will retain support to EW/SI and ICS support other specialist areas.

These include:




11 (Royal School of Signals) Signal Regiment – under command of Defence College of Communications and Information Systems (DCCIS).

-          1 (Ouston) Squadron – Disbanded 6 May 2013

-          2 (Catterick) Squadron

-          3 (Harrogate) Squadron

-          4 (Military Training) Squadron

-          5 (Maresfield) Squadron



Elements of 5 Sqn are being redistributed with subunits in the other squadrons. The long term goal of the internal reorganization is to provide a through-career view of both operator and technician training within one sub-unit remit.





14 Signal Regiment (EW) – part of 1st Intelligence and Surveillance Brigade (Sp Sqn + 4 Fd Sqns).

-          223

-          224

-          226

-          237

-          245

-          Sp Sqn



The regiment, which is high in demand, formed a fifth field squadron (224) in 2004 to better meet the need of constant deployments at squadron level in Afghanistan. In another very questionable decision of the Army 2020 plan, one of the five squadrons will be lost. Not clear yet which one is to go.

The regiment will find a new home in MOD St Athan base.




18 (UKSF) Signal Regiment (no change in structure).

-          SBS Signal Squadron

-          264 (SAS) Signal Squadron

-          267 (SRR) Signal Squadron

-          268 (SFSG) Signal Squadron
     63 (SAS) Signal Squadron (R)


216 (Para) Signal Squadron.
628 Signal Troop. British contribution to 1st NATO Signal Battalion (1 NSB).
660 (EOD) Signal Troop.
JSSO.
DE&S – Continued support to various parts within DE&S.



The Signal Troops (661 and 662) organic to the HQs of 101 and 102 Logistic Brigades are disbanded.







Royal Artillery



Judging from the restructuring going on at 3 Royal Horse Artillery regiment, the Adaptable Force artillery units will only have 2 gun batteries as they reduce to an establishment of just around 370 men.

3 RHA is keeping all its batteries, but J (Sidi Rezegh) Bty is losing its guns, presumably to remain as a second Tac Group battery of sole Fire Support Teams.

Expect 4 Royal Artillery to suffer the same fate.



3 RHA

-          J (Sidi Rezegh) Bty. Becomes Tac Group Bty as it loses its guns?

-          C Bty. Light gun.

-          D Bty. Light gun.

-          M Bty. Headquarters.

-          N (The Eagle Troop) Bty. Tac Group Bty.



4 Royal Artillery currently has six batteries. How the regiment will transform is not yet clear.

    6/36 (Arcot 1751) Bty, (was resubordinated to 4 RA from the disbanded 40 RA regiment) Tac   Group Bty
    3/29 (Corunna) Bty,
    129 (Dragon) Bty, (was resubordinated to 4 RA from the disbanded 40 RA regiment)
    88 (Arracan) Bty,
    94 Headquarters (New Zealand) Bty
    94 Bty (Lawson’s Company).


On disbandment, 40 Royal Artillery had its batteries re-roled and re-subordinated to other regiments.

6/36 (Arcot) Battery - subordinate to 4 RA as Tac Group Bty
38 (Seringapatam) Battery - subordinate to 19th RA as Tac Group Bty
49 (Inkerman) Battery - under Joint Ground-Based Air Defence, armed with Land Environment Air Picture Provision (LEAPP)
129 (Dragon) Battery - subordinate to 4 RA
137 (Java) Battery - subordinate to 26th RA as Tac Group Bty


On 22nd of June 2012, 49 (Inkerman) Battery became an independent battery with both RAF and RA troops in the orbat. The battery now uses the Land Enviroment Air Picture Provision (LEAPP) used to deliver a significant improvement to battlespace management for the British Army, LEAPP operates 5 SAAB G-AMB radars to detect, track and identify air contacts and produce a complete local air picture. 



Royal Engineers



The regiments 21 and 32 will lose a regular squadron each as they become Hybrid regular-reserve regiments. 

21 Regiment currently has: 

7 Headquarters and Support Squadron
1 Armoured Engineer Squadron
4 Armoured Engineer Squadron
73 Armoured Engineer Squadron
Royal Electrical and Mechanical Engineers Light Aid Detachment 


As it becomes an Hybrid regiment, 1 and 4 Squadrons become Field Squadrons, and 73 Sqn is due to disband. Two reserve squadrons come under command: 103 Field Squadron (located in Newcastle) and 106 Field Squadron (located in Sheffield). NOTE: the reserve squadrons given by the british army website are different from those announced in the Reserves plan. Under the Reserves plan, 21 Regiment was to get 103 Field Squadron and 299 (Parachute) Squadron.
There might have been a plan change inspired by common sense, for once.

32 Regiment currently has:

2 HQ & Support Squadron
26 Armoured Engineer Squadron
31 Armoured Engineer Squadron
39 Armoured Engineer Squadron
Royal Electrical and Mechanical Engineers Light Aid Detachment

As it becomes an Hybrid regiment, the armour will be lost and one squadron will disband, but we aren't yet told which one. According to the Reserves plan, 32 Regiment was to take command of 131 Commando Engineer Squadron and 106 Field Squadron. Now 106 Squadron is instead assigned to 21 Regiment, apparently. 
We will have to wait and see how the plan has changed. 

The Air Support regiment, 39 Royal Engineers, in Kinloss, has had 10 Squadron disbanded in Leeming, but will gain command of 65 Squadron in Kinloss in summer 2014. 65 Squadron used to be part of 28 Royal Engineer regiment, which is however disbanding. The final structure should thus be:

34 Field Squadron (Air Support).
48 Field Squadron (Air Support).
53 Field Squadron (Air Support).

65 Field Squadron (Air Support).
60 Headquarters and Support Squadron (Air Support).

REME Workshop.   



The two EOD regiments are restructuring to become hybrid as well, both lining 2 regular and 2 reserve EOD squadrons. The new structure is as follows:



101 (EOD) Regiment

-          22 HQ & Sp sqn

-          17 (EOD) Sqn

-          21 (EOD) Sqn

-          221 (Reserve) Sqn

-          579 (Reserve) Sqn



33 (EOD) Regiment

-          EOC Group Explosive Ordnance Clearance

-          821 (EOD) Sqn – this squadron has two Commando and two PARA EOD troops

-          51 (EOD) Sqn

-          217 (Reserve) Sqn

-          350 (Reserve) Sqn



The restructuring of the EOD force is meant to take good note of the lessons learned in the vicious fight against IEDs in Afghanistan. Much better integration, even in peacetime training and structures, of RE and RLC EOD, Search specialists, ECM operators and Search Dog Teams from the Military Working Dogs Regiment is the final objective.



One question yet to answer in this area is the future of TALISMAN. Will this route clearance system be brought into core? How, if it is, will it be distributed and employed in training?

Hopes for the long-term future of TALISMAN come from a slide of the June 2013 presentation given by Lt Gen Chris Deverell, Chief of Materiel (Land) and Quartermaster General during the RUSI Land Warfare conference.





The slide shows a variety of UOR material that the Army is bringing into core (simulation training, Mastiff, Ridgback, Warthog, Wolfhoud, Husky, Jackal, Desert Hawk III, Geo Intelligence solutions, portable radio SATCOM and, in the Force Troops mix, the photo of Mastiff Protected Eyes with mine-roller (an important component of MASTIFF) can be seen. Hopefully, it signals the intention to retain TALISMAN as a whole package.

Also worth noticing is the presence of the photo of the REBS (Rapidly Emplaced Bridge System). Around a dozen such systems have been procured urgently for use in Afghanistan, mounted on HX-77 EPLS trucks. At least 10 were available on the eve of Herrick 14, with 5 systems used for training and five more deploying to Afghanistan.

Bringing REBS into core is likely to be a way to (partially) answer to the requirement for a Medium Weight bridgelayer for the support of FRES SV. The REBS has a military load class (MLC) of 50, so it can support a fully laden FRES Scout. It can only, however, bridge 14 meters gaps, and it is installed on trucks which of course aren’t the same thing as a tracked armored vehicle.

Anyway, much better this way than having nothing. However, on the eve of the publication of the SDSR, the Royal Engineers quantified in 77 tracked vehicles their Medium Weight, FRES-related manoeuvre support requirement for bridging, mine breaching, digging and battlefield shaping. It is not clear if Terrier was considered part of the solution to this requirement, as, save for bridging, it can cover all other roles.






Conclusions:



Many changes are yet to come and be detailed, but this update wants to track, as much as possible, the changes at sub-unit level within the regular army. It also wants to highlight the massive reductions in Combat Support and Combat Service Support capabilities available to the army, to make more people aware that, while understandable, the fury for the loss of historical infantry battalions has no real sense. The uncomfortable reality is that political considerations have messed up Army 2020 even more than it could be expected from such a massive cut, exactly for limiting the loss of capbadges, containing in “just” five the number of infantry battalions to be lost. I’m fully convinced that, given freedom of choice, the army would have cut more infantry battalions in order to deliver a better balanced force: as it stands, the army has more infantry battalions and more brigade HQs than it can actually deploy and support in the field. The tragicomic situation of the two High Readiness brigades is an example. The removal of signal elements from 1 and 2 star headquarters, with new solutions for Real Life Support having to be literally invented somehow is another stark reminder.



The many Infantry battalions of the Adaptable Force have also been cut down in establishment to cut manpower while retaining a non realistic number of separate formations. The british infantry battalions, of all types, are becoming some of the lightest (in terms of both manpower and firepower) in NATO and perhaps in the world.

In other words: if the situation of CS and CSS units is not fixed, the last thing the army needs is more infantry battalions. The Chief of General Staff, general Sir Peter Wall, has (very carefully and mildly) admitted that there is a problem in this area, speaking to thedefence committee in early November 2013:



Q343 Derek Twigg: You mentioned in one of your answers a few minutes ago that obviously this is putting pressure on certain areas in terms of resilience, but you have to find contingency for that. Could you expand on where those pressure points will be on resilience, and are you absolutely confident that they can be dealt with?



General Sir Peter Wall: Yes, I think that in our force structure we are conscious that we have made certain assumptions about the balance between Regular, reserve and contractor logistics, and if those assumptions turn out to be incorrect, then we may find that the dependence on Regulars-because of the threat situation or the tempo of operations, or some other unforeseen sort of delta-is greater than we would like. In that situation, we might have to enrol people from other parts of the Army to do transport functions and things like that.



We can see increasing pressure on the demand for communications bandwidth in the tactical space. We have taken account of that in our design by pro rata reducing the Royal Signals by considerably less than the 20% average, but even so, I can see that demand growing as a consequence of the changing nature of the way that business is done in the future, which is not so much a function of size, but of the changing character of the way we do things, with an increasing dependence on high-resolution imagery for targeting and things like that. I can see that happening. I think in the gunners and the sappers we also might find that they are running a little bit faster than we would like and some of their other cap badge counterparts, but that has often been the case in the previous structures of the Army, depending on the nature of the specific operation and where the emphasis lies.




It will appear extraordinarily mild an admission, and it is, but keeping in mind how rare it is these days for the top brass to acknowledge any specific problem caused by cuts imposed by government, and considering that Philip Hammond was sitting at the general’s side, it becomes a very significant admission.  



I would expect army officers (retired and non retired, to moan about THIS problem, not about the loss of infantry battalions, as painful as those are.

We should all be aiming for a powerful and capable army, not for capbadges.