Wednesday, August 8, 2012

The Infantry of Army 2020: Lethality



Previous posts in this series   

The Infantry of Army 2020 – Introduction


Battalion Strength

First of all, an update to the analysis on Battalion strength that i provided in the Introductive Post: on ARRSE, serving soldiers are reporting being briefed by their commanding officers that the Adaptable Force’s battalions (Light and Light Protected Mobility battalions, for a total of possibly 20 formations out of 31, depending on whether one or two battalions stay in 16 Air Assault Brigade together with the two Para units or not. It is also not clear if the Gurkha battalions will be similarly affected.) will be downsized by removing a rifle platoon from each Rifle Company. There is also a rumor that the Machine Gun Platoon might have to go as well, but on this second point I’d be careful as there are big doubts.

The plan is that the Territorial Army will supply the missing platoons and bring the battalion up to strength for deployment. It is worth remembering that the Army 2020 restructuring plan for the Territorial Army has not yet been completed, and it is not expected to be released before around year’s end, but the Army 2020 plan says that Adaptable Force’s battalions will be paired with TA battalions. It is not yet clear how this will be achieved in practice, but in numerical terms, 14 regular Light Role battalions planned face a TA force of exactly 14 battalions. The British Army document on Army 2020 shows also the Foxhound-mounted battalions as paired with a TA battalion, but I think it is more than premature to say that the TA will get additional formations.
A way to achieve the result would be to have smaller TA “battalions”, but more numerous (20, so the Foxhound-mounted Regulars get their own Reserve counterpart) very closely connected to their Regular counterpart (and thus ideally based as close as possible, in the same area) and very much structured to provide a minimum of a Company worth of manpower.

The regular battalions can be expected to deploy for 6 months in a 3 years period, while the Reserve personnel will be asked to face a 6 months tour in a 5 years period, so the TA battalion must be large enough to be able to field 2 companies, made of different personnel, in a 5 years period to provide adequate support to the paired regulars.

Now, a consideration. The British Army works daily to the assumption that there must be 3 maneuver units into a formation if this is to fight successfully. At Company level, this means having a Platoon that Assaults, one that Supports and one acting as Reserve.
This is for the routine: for deployment on combat operations, the Army’s doctrine calls for 4 maneuver units, (Assault, Support, Reserve, Echelon) and for years the stated role of the Territorial Army has been to provide to deployed battalions an additional company plus supporting mortar and anti-tank section. Something that never actually happened, as far as I’m aware, with the TA employed most frequently to provide individuals, not formed subunits.
In future, achieving the optimal number of 4 maneuver formations will be even harder, and indeed even deploying multiple Adaptable Force battalions at full 3-companies strength risks proving challenging: if the Territorial Army fails to deliver the planned output, elements of regular battalions will have to be assigned to the deployed force just to bring it up to the minimum “full” establishment, further reducing the number of battalions/battlegroups that the UK will effectively be able to deploy and sustain.
Using the reserves to achieve a 4-coy structure for deployment will likely only be possible once in a 5 years period, in alternative to providing a coy two times.

Albeit non optimal (someone has already called it an Army “fitted for, but not with” soldiers) an approach, it is perhaps the only real way to integrate the TA. It is clear, however, that with these new planning assumptions it becomes even more important to get the Territorial Army reform right.

It is formally correct to note that British Army battalions will almost never fight in their peacetime structure and establishment, both because they will make modifications to adapt to the situation at hand and both because they will almost certainly be formed into battlegroups, but the reality is that the constant reduction in the manpower and firepower of infantry battalions is going to damage the Army’s capability significantly.
A Battlegroup ideally should be formed by taking an Infantry Battalion and attaching to it one or more Tank troops or Tank Squadrons, for example, plus an Engineer Squadron and perhaps an artillery battalion. The deployed battalion would of course receive other specialist reinforcements relevant to the contingent situation (ECM Force Protection teams, additional Signallers, a Fire Support Team of Royal Artillery observers and JTACs, UAV detachments, HUMINT teams, military working dog teams…).
But there is a big difference between the above process for forming a battlegroup and one process in which a battalion ends up needing to draft in companies from another, taking two just to form a battalion-sized battlegroup.
And this is what the Army fears will happen, when it talks of future enduring operations not stretching beyond 3 years or so: in theory, Army 2020 has what it takes to go on and on past the 3 years mark, but if to make a regular battalions you need 2, of course the whole story changes…

Unsurprisingly, the Army would have preferred to keep fewer but full-strength battalions, but Army 2020 was very much a political problem before a military one, and the loss of capbadges was unacceptable. The Army had effectively no alternative. 


Moving on to the topic of this post, I will now look in as much detail as possible at the current and future “Lethality” of the British Infantry, by exploring the weapons and sights employed and planned.


Section Weapons: UORs and beyond

The main weapon of the British Army, the SA80 assault rifle, has been significantly enhanced and modified for use in Afghanistan. In its current incarnation, the rifle is known as SA80A2 TES, even though SA80A3 is incorrectly frequently used.

The SA80 TES has had the handguard replaced with a Picatinny Quad-rail assembly developed and produced by Daniel Defense, it has been fitted with the vertical foregrip with extendable bipod (Grip Pod), it has had an interim weapon sight adapter system and it received the Vortex flash eliminator.
In 2011, the Magpul Industries polymer-made EMAG magazine was introduced to replace the previous, heavier steel one, achieving a considerable weight saving (from 249 grams to 130), with a million magazines on order over a 4-year period. On a typical load of 12 magazines, a soldier ends up carrying 1.56 kg less than before: definitely not bad.
For a while, the SA80 had the SUSAT sight replaced with the ACOG 4x, while now it is getting the ELCAN Specter 4x, selected as part of the Future Integrated Soldier Technology – Surveillance and Target Acquisition (FIST - STA) 

L85A2 TES fitted with Grip Pod, new handguard with rails, ACOG 4x on interim adapter, Vortex flash eliminator and Light Laser Marker (LLM) installed under the barrel.

These are important improvements, and also come with the added bonus of a significant reduction in the weight of the rifle, down to 5290 grams, a reduction of over 1 kg from a baseline SA80A2 with optic.
The SA80A3 was (and should still be) envisaged as the weapon for FIST, at least in its initial years. Modifications would include a full-length top rail for easy fitting of optics and accessories (replacing the interim adapter) and further weight savings.
Powered rails are a future target, as part of improvements to the power distribution infrastructure in the soldier system. Powered rails would make it possible to fit lighter accessories, which would not need the huge amount of AA batteries currently used.
The power would come from the centralized energy solution of the soldier, but of this aspect I’ll talk in a future post in this series.


Above, the new Handguard for the SA80, with integrated rails; and the E-Mag lightweight magazine UOR
 
Further weight reduction is a target, and the Cranfield University has been working for the MOD on this, producing two SA80 prototypes incorporating many changes and mods. Stellite-made barrels were trialed, and validated: the greater resistance to heat provided by Stellite makes it possible to fire more rounds without carrying replacement barrels, or to remove material from the barrel to make it lighter but with the same useful life.
Parts of the SA80 were replaced with others made in plastics and carbon fibre, following a study into the stress suffered by the rifle during usage: where this is low enough, excess material (and weight) were eliminated.
The two recoil rods of the rifle, made of steel, were replaced with others made of titanium, saving 90g per rod.
Another prototype was used to lighten the Grenadier’s gun by providing a new, lightweight mount and assembly for the L123A3 (H&K AG36) underslung grenade launcher.

Delivered from January 2011, the prototype P1, completed with picatinny rails at the front, grip pod and ELCAN weights just 4829g, a reduction of 461g in weight.
The P1A prototype for the Grenadier with the AG36 launcher, without sights, weights 4629g, down from the current 5501g, again without sights. An impressive 872g difference.

I will cover the Cranfield University’s work more completely in a future post of this series, as they have also been working to develop lighter ammunition and further weight-saving, but I thought it was worth to put the SA80 work here, because lightening the rifle represents a possibly attractive option for the future, not just for Afghanistan.
As of 2011, it is anticipated that Initial Gate for a SA80 replacement programme will be in 2014 for delivery in the 2020s, but a SA80 ‘A3’ modification centered on significant weight reduction could be a cost-effective alternative.    

In terms of sidearms, under a UOR, a new pistol has been procured to be issued in place of the Browning 9mm High Power. This gun is the SIG Sauer P226, known as L105 by the Army. The L105A1 is the standard pistol, the L105A2 is the P226R, which adds a rail for easy application of accessories, ahead of the trigger guard, and the L106A1 is a further improved variant with corrosion resistant finish.
A smaller compact variant, the P229, is in service as L117A2, since the earlier compact P228 was already in use with the SAS as L117A1. 
A requirement for replacement of the Browning continues to exist in the Army plans, and apparently the Sauer, despite having performed well in Afghanistan, is not the definitive solution envisaged by the Army, which wants something else.    

Under another UOR, the Army procured 200 12 gauge shotguns, produced by Italy’s Benelli. The M4 Super 90, which is also in service in the US, is known in the british army as L128A1. It weights nearly 4 kg, and carries 8 rounds in the extended tubular magazine, with different types of ammunition available. It has a 130 meters range with a solid shot, and 40 meters with buckshot. It is carried by the Point Man on patrol. The rifle in British Army service comes with foregrip, picatinny rails and EOTech holographic sight. 

L128A1 with rails and Eotech sight

Possibly the most important and most appreciated UOR weapon, the L129A1 Designed Marksman Rifle is already a mainstay of the future army, which has been very impressed by the impact it has had in the field. Produced by Lewis Machine & Tool, the “Sharpshooter” has a 16 inches barrel, a lightweight polymer magazine for 20 rounds, an Harris bipod and fires 7.62 x 51 mm NATO rounds with high accuracy easily out to 800 meters. In Afghanistan it is issued at least on the basis of one per Section.
The initial order, placed in August 2009, was for 440 guns for 1.5 million pounds, but several sources indicate that consistent follow on orders might have already been placed. It would appear that the Army, as of August 2012, has been handed some 1500 L129A1s.

Royal Marine Sharpshooter in action

Apparently, the L129A1 has also been selected for another UOR, far less publicized, which is the “Sniper No. 2 system” or "sniper support weapon" for the renewal of the personal armament and kit used by the spotter in a sniper pair (the sniper using the L115A3). A very small hint of this was already provided back at the time of the initial order: "The Sharpshooter's capabilities are also complementary to the current Sniper System." 
The main difference between the Sharpshooter and Sniper No.2 is made up by the sights: the Sharpshooter is fitted with a Trijicon ACOG 6X sight, compensated for bullet drop out to 1200 meters and fitted with a secondary Close Quarter Combat CQB sight on top, the Trijicon Ruggerized Miniature Reflex RMR. The Sniper No. 2 is used with a more powerful scope sight Schmidt & Bender (possibly migrated from the L96/L118 rifles being progressively retired) for day engagement and with OSTI MUNS night sight for nocturnal use. The MUNS (Magnum Universal Night Sight) is an image intensifying night sight that is installed ahead of the day scope and allows engagements out to 700 or more meters at night. The MUNS would appear to be used as night-sight solution for the rifles in Sharpshooter role as well. It can be seen mounted on a L129A1 at minute 4:03 of this Army video.

The L129A1 is issued with 20-rounds P-mag polymer lightweight magazines. The L129A1 is used in Sharpshooter role with the 16 inches barrel, but a 12 inches and a 20 inches barrel are available, and it is not absurd to assume that in the Sniper No. 2 configuration the longer barrel might be used.
Issued one per Section, (27 or more per battalion) the L129A1 is an excellent weapon, and around 1000 are the long term requirement for Sharpshooter role. While there are indications of additional orders having been placed past the initial 440, I’ve no details available.

The L129A1 has also been seen used by RAF heli-snipers on Puma helicopters deployed for the protection of the Olympic games, another demonstration that the well liked weapon is finding new roles in the force. 

A number of G3A4 rifles and an unknown amount of H&K 417 are in service, used for for a variety of missions: the 417 is in use with the Special Forces which needed a sharpshooter quickly and could not wait for the Army to make trials and take decisions. The H&K 417 has reportedly some defects and issues, and was beaten by the L129A1 during british army acceptation trials. The G3 is seen quite frequently in the hands of Royal Marines on ships.
A long-term rationalization on L129A1 might be attractive. 

Overwatch on HMS Cumberland alongside in Libya for the 2011 Evacuation effort: the soldier is armed with the G3A4
 
The L110A2 Minimi (the british Army and Royal Marines adopted the Minimi PARA, with short 14’’ barrel and sliding buttstock) has not been left out either. Modifications to the machine gun were part of the soldier system improvements for Afghanistan, and a reconfigured Minimi was shown during the presentation of the FIST STA sights package. I’m not entirely sure on the timeline of introduction of these modifications, but selected improvements include Grip Pod downgrip, Picatinny tri-rail handguard and top cover, retractable Savit buttstock, and a prong-style flash “eliminator”. The improvements comport a weight reduction of .29 kg, down to 6.91 kg (15.24 pound). 


The MINIMI seen during the presentation of FISTA STA equipment, showing rails, new buttstock and Grip Pod. In foreground the MOSKITO binocular can be seen, and nearby is the Light Infantry Periscope, unfolded and ready for use. Near the machine gun, on the table, is a MaxiKite 2 (MK2)

In the longer term, beyond Afghanistan, the Army intends to “reconfigure” the LMG. This is likely to involve additional changes over those explained above, and very possibly include a longer barrel: the short one used in the Minimi has been widely criticized, and it is said that it reduces the useful range of the Minimi to 200 meters, and in any case less than the range of the SA80, which uses the same round but from a 20 inches barrel. 


Grip Pod (above) and the new butt stock (M4 style) for the Minimi

As widely known, taliban often fire from 500 or more meters away, and the British Army has had to reintroduce the GPMG Light Role (L7A2 with bipod and provision for 50rounds belt) into the Sections/Patrols, after removing it years ago.
Probably to provide a lighter and less bulky alternative to the “gimpy” in foot patrols, the MOD eventually placed a UOR order for the acquisition of 176 “Major Minimi”, the Minimi 7.62x51. The first 176 had to be delivered by the end of 2011, and the contract includes options for a further annual order of 250 machine guns in 2012, 2013 and 2014. 
The Minimi 7.62 offers 70% commonality to the 5.56 Minimi, and is more than 30% lighter than the GPMG. Of course, it does not deliver quite the same firepower at range as the General, but the Minimi 7.62 represents a good compromise. 

 
Rockets

The British Army in Afghanistan has been using the M72 LASM (Light Anti Structure Munition), also known as M72A9, procured as UOR in 2007 as an interim solution on the way to the intended Anti Structure Munition.  

The 66mm LASM rocket is produced by Norwey's NAMMO Talley, and comes within an extendable, disposable (single-shot) tube which is less than 80cm long when folded for transport. Weight of the system is 4.3 kg, a lot more than the original M72 Light Antitank Weapon (LAW), mainly due to the larger warhead employed in the LASM in its new role. The LASM is used against fixed positions, bunkers and other buildings, and it uses it's kenetic energy to penetrate the outer walls of a structure before the high explosive warhead detonates inside.

The LASM rocket and tube (extended, ready to fire)

The Anti Structure Munition was selected with a 7 million pounds assessment phase which saw Dynamit Nobel and Saab Bofors Dynamics compete for the contract. Dynamit Nobel eventually won, offering a rocket launcher derived from the Rafael Matador.
The contract, signed in 2006, covered an unspecified number of systems plus training and five years of support, for 40 million pounds. In-service date was 2009, then slipped to 2010, and the rockets possibly did not reach Afghanistan until 2011, with the LASM reportedly still being used, even alongside the ASM.
The LASM should finally retire this year, as the ASM enters full service and the FIST UGL Control System arrives in theatre.

The L2A1 ASM’s problem is that it weights close to 10 kg, a feature that is highly unlikely to be appreciated by the soldiers out in the field. Its advanced design, however, offers increased safety as it is compliant to Insensitive Munition regulations and the tandem warhead can be used to destroy light-armoured vehicles or mouse-hole walls (even in triple-brick walls), or it can be programmed to smash inside a building and explode inside with devastating effect. It has a minimum range of 10 meters and an useful range of up to 400 or 500 meters.  

This photo shows the elusive ASM, laying on the ground in foreground in the picture. The man climbing up appears to carry a LASM over his backpack.

In the Anti-Tank role, the British Army has been using the LAW80 for years (at entry in service it replaced the L14A1 Carl  Gustav recoilless rifle and M72 LAW rocket which then made a return as LASM), this 94mm rocket being the baseline weapon, with spaces for the stowage of 8 being reserved into the Warrior IFV, for example.  
Of course, the LAW80 has been aging, and it eventually became obsolete before a replacement was ready: perhaps the most relevant defect being the impossibility to fire the rocket from enclosed spaces, so this brought to an UOR, met by purchasing the AT4CS rocket launcher as ILAW (Interim Light Antitank Weapon).

In 2002, the Saab Bofors Dynamics MBT LAW was selected to become the Army’s Next-Generation LAW (NLAW), offering a fire and forget Predicted Line Of Sight guided rocket with a minimum range of 20 meters and a maximum range of 600+ meters, capable to defeat Main Battle Tanks. The rocket can be fired safely from enclosed spaces. It uses top-attack mode against tanks, but also offers Direct fire option against light armor and bunkers or buildings.
The launcher is reloadable, and the system is compliant to Insensitive Munition regulation. Around 14.000 rockets have been ordered/acquired, with entry in service from 2009 and an expected service life of some 20 years.   
The system weights 12.5 kg, however, so it is not that light to carry around. In the contract, an In-Door Training aid and an Outdoor training round were included. 

NLAW training
When the transition will be completed, the British Army section will have access to the ASM and NLAW systems, both top of their classes, as the other interim and obsolete systems are retired. The weight issue, however, is serious.  


In support

The L7A1 (FN MAG 60.20 T3) and L7A2 (FN MAG 60.20 T6) GPMG were originally manufactured on license by the Royal Small Arms Factory at Enfield Lock in Greater London. When that closed, UK production of GPMGs and spare parts moved to Manroy Engineering Ltd of Beckley, East Sussex, better known for being the UK’s provider of .50 Heavy MG. In 2008, following problems with Manroy who lost the rights to produce the GPMG, the UK’s L7A2 machine guns are produced by H&K in Oberndorf, Germany.

The GPMG is used in Sustained Fire and Light Role modes. In SF mode, it is mounted on the L4A1 stable light mounting developed by the Royal Small Arms Factory. This tripod mounting incorporates a recoil buffer unit, permits all-round traverse and has a quick-release mechanism allowing free traverse, elevation and depression. In Light Role, it has a folding bipod and can take 50 rounds belts. The GPMG is a popular weapon in the army, but the weight is its obvious defect, and a reason for its disappearance from the Section when the SA80 era started.

The loss of firepower and the reduction in the ability to suppress the enemy, particularly at range, was badly felt, however, and the British Army eventually adopted, for some years (until around 2008, indicatively), the US model of adding a Maneuver Support Section (MSS) to the platoon, containing 2 GPMGs, at the cost of adding 4 men and 1 NCO.
Eventually, in the early 2000s, the Minimi LMG was procured as a replacement for the L86 LSW, and the under slung grenade launcher was introduced to the Section. The cost was the loss of the Platoon’s 51mm mortar and of the recently introduced MSS,  removed for saving manpower. Both choices did not prove happy ones, as we’ll see.

In Afghanistan, the GPMG ended up being heavily used, and it returned to the Section, with each patrol going out having one. At least.
However, weight issues remain, and weight reduction for the General is a recognized objective, even after the ‘Major Minimi” UOR. Cranfield University has been working on it, with ambitious long-term aims: as of 2010, the target is a weapon mass reduction of 3.6 kg and a further 6 kg saving in the weight of 800 rounds and belt links.

Other studies have been made on light medium machine guns around the world, and H&K proposes its own solutions, from the H&K-121 (a new machine gun design) to the Lightweight L7A2 GPMG revealed in June, sporting a welcome 1.8 kg reduction in weight thanks to modifications that include a fluted barrel, picatinny rail for sights on top cover, folding butt, “dark earth” colored body matching the Multi Terrain Pattern camouflage and an improved feed tray with ‘pawls’ to stop the ammo belts from slipping around. This gun does not include titanium-made body, which has been mooted for a long time and is possibly still being trialed. It might not have been judged mature enough yet, or it might be a money problem. In any case, it remains desirable and under study at Cranfield: it is estimated that it might imply a saving of up to 3 kg.
For the future, beyond Afghanistan, a Lightweight GPMG remains a stated army priority. 

Lightweight L7A2 by H&K

The underslung grenade launcher (H&K AG36, adopted by the Army as L17A1 for use on the L119A1 carbine and as L123A1, A2, A3 for use on SA80) only reaches half of the distance covered by the 51m mortar, at most, and is not as lethal, so that the Army made it clear that a requirement exists for procuring, at some point, a capable Medium Velocity 40mm (40x46) grenade offering range of 800 meters or more. The UGL currently employs Low Velocity 40mm grenades. The High Velocity grenades (40x53) are used by the GMG, and are unsuitable for the UGL, but several types of Medium Velocity rounds (in 40x46 or 40x51 mm calibers) are available and/or in development.
These add quite a lot of recoil force the Grenadier has to deal with, but carry more explosive and double the range out to 800 meters or more.
Differently from the US M203 grenade launcher, the UK-adopted, H&K AG36 UGL is readily capable to take the longer 40x51 mm grenade, eventually, as its breech does not slide forwards for reload, but swings open to the left.  
In the meanwhile, this year the FIST UGL control unit will entry in service, and by reducing the CEP at 300 meters range to just 5 meters it will dramatically enhance the effectiveness of the weapon.

H&K AG36 UGL open for reloading
 
However, as of now, there is no Medium Velocity grenade in service, and anyway it has been recognized that, even when there will be one, it won’t fully replace the effect provided by the Platoon’s hand-held light mortar.
And in fact, a UOR was launched and procurement of a complete 60mm Light Mortar capability went ahead, possibly procuring a total of 630 mortars which will stay in the Army in the long term, and not just for Afghanistan.
Two variants of 60mm mortar have been procured, both from Hirtenberger: the M6-640 is used at Platoon level, and is an Hand-Held (HH) ‘Commando’ weapon. In Commando mode it weights around 4.6 kg and is 726 mm long with a 1921 meters maximum range at Charge 3.  

The M6-895, with longer barrel ( 984 mm, 5.5 kg ) and bipod, is used as a Light capability added to the Mortar Platoon at battalion level. Mounted with baseplate and bipod, it has a maximum range of 3610 meters, is 977mm long and weights 19,5 kg. The M6-895 can also be used in Hand-Held mode after undergoing a simple 2-minutes conversion. In Hand-Held mode it can be used to maximum Charge 3, with a range of 2100 meters.

The 60mm ammunition is the same, and there is a huge assortment of rounds available: the 1.4 kg HE bomb generates 590 splinters, and there is a Practice round, a Smoke-White Phosphorous with a 90 seconds burnt time, a 90-seconds Red Smoke round, an IR illuminating round capable to provide 35 seconds of illumination over a 1200 meters radius area, and others.   

The M6-640 can be fitted, eventually, with the same bipod and plate as the M6-895. For both mortars, the maximum rate of fire is 30 rounds per minute.  

The L134A1 Grenade Machine Gun was first introduced as a UOR, with an order for 40 systems from H&K placed in November 2006. A second, much more relevant 18 million order was placed in February 2008, to fulfill the requirement for the infantry Fire Support Weapon. This order also included a complete suite of weapons optics including telescopic day sight, image intensifying and thermal night sights, and a laser rangefinder. A simulated training system, allowing to train realistically without firing a single grenade, was also procured.
The Fire Support Weapon focus was on providing weapons and tripods specifically for the use of the GMG in the fire support elements of Light, Mechanized and Airmobile infantry. Armoured infantry, having the Warrior’s gun in support, can do without.
The GMG anyway remains fully vehicle-compatible, with integration tackled by procuring the ISTEC Universal Gun Mount, which provides a single, common assembly for mounting GPMG (single or twin), HMG or GMG.  It has been reported that by 2010-11 the holdings of GMGs had increased to around 400.

Training with the L111A1
Finally, the L111A1, the immortal Browning .50 Heavy Machine Gun. Prior to the Iraq and Afghanistan conflicts, the Army had left its holdings of .50 HMG wither down to just 156 guns, but successive orders, according to some sources, have brought the number up to around 1100 by 2011!
The L111 is produced by Manroy, which also introduced a ‘Soft Mount’ reducing recoil and improving accuracy, and a Quick Change Barrel system.

In the long-range Anti Tank role, over the 2500 meters distance, there is the well known Javelin, in service since 2005. The missile has been widely used to hit compounds and other targets at range, leading to a few consistent orders to replenish the stocks of rounds. The Aiming unit of the Javelin provides a valuable ISTAR kit by enabling long range observation. The UK continues to use the L16 mortar, in 81mm caliber, as its heaviest support weapon in infantry formations, pretty much an exception to the rule since the allies have long moved to the 120mm mortar at battalion level (US, Italy, France, Germany…) and nations such as Russia and China have long embraced the advantages offered by 120mm Mortar-cannons capable to fire in direct as well as indirect mode. 

L16 in action
This, however, will be material for a future post in the series.    


Sniper System Improvement Program

The L115 designation in British Service indicates the Accuracy International AWSM (Arctic Warfare Suprt Magnum) rifle in .338 Lapua Magnum caliber. The first rifles purchased were known as L115A1 LRR (Long Range Rifle) and saw extended usage in Afghanistan and Iraq in 2001 and 2003, fitted with a Schmidt & Bender 3-12x50 PM II optics.

The L115A2 followed, and introduced several improvements, such as Tan colored body, Harris bipod, fluted barrel and suppressor. It was effectively a prototype for the further enhanced L115A3.   

L115A2 rifles are similar enough to the final A3 configuration that they were converted to A3 standard, but the legacy L115A1 LRR (Long Range Rifle) was not modified.

In 2007, finally, the Sniper System Improvement Program kicked in, and in November 2007 the MOD announced the selection of a new standard sniper rifle for Army, Royal Marines and RAF Regiment, with the placement of a 11 million pounds  order in March 2008 to Accuracy International for 580 of the new, improved AWSM variant, the L115A3.
The new rifle came with a more powerful optic (with twice the magnification, at x25 against x12), the Schmidt & Bender 5-25x56 PM II. Other improvements include a suppressor to reduce the flash and noise signature, a folding stocks for improved ease of carriage, an adjustable cheek pieces assembly for more comfort and better eye alignment with the telescopic sight, a Butt spike or ‘monopod’ to enable the shooter to observe the target area for extended periods with minimal fatigue, a new adjustable bipod and 5 round box magazine.
The L115A3 would finally entirely replace the L96 family (L96A1, L96A2, L118A1) in 7.62x51 mm, increasing range and lethality with the adoption of the more powerful Lapua Magnum round.

L115A3

This purchase was followed by the Sniper Thermal Imaging Capability program, for the purchase of suitable night sights. Two products of Qioptiq were selected: the SVIPIR2+ as Thermal Sniper Sight, which is mounted ahead of the scope. The VIPIR2S+ is issues as night sight for the Spotter (also known as No.2) and can be handheld or mounted on tripod.
The SVIPIR2+ is designed to operate in total darkness, being a Thermal camera and not an Intensifier sight (which needs at least a little external light source) and enables engagements out to 1200 meters at night and/or in foul weather, fog or dust cover. It is also fairly light and small compared to other comparable systems, but with the defect that it needs 4 AA batteries at a time, and empty them in as little as 6 hours.

In Iraq, the KN203 Night Sight Simrad was widely used. This is a II system that clamps onto the day sight scope, and might still be used as complementary to the new thermal sights. In presence of some form of light, (star, moon light or other), the II sight is very useful for identifying the target. The thermal imager does not need external light sources, on the other hand, but identifying the soldier you are looking at is very difficult.

The sniper teams will also use the Kestrel 3000 pocket weather reader to determine a variety of factors crucial to the shot's accuracy, from winds to humidity levels.
The spotter might also be carrying the LEICA Vector laser range finder and the Leupold x40 spotting scope.
SSIP also covers other elements of the sniper’s equipment, from special tripods to other bits of kit: one is the Vectronix PLRF 15C Pocket Laser Range Finders, ordered in 2007. PLRF15C can lase a target out to around 5 km, and it includes a DMC Digital Magnetic Compass feature. This small addition provides a wealth of additional data: azimuth or bearing, inclination or elevation; horizontal distance and height difference – not only between the observer and an object, but also between two remote objects A and B.

A sharpshooter accompanied by a soldier pictured here looking at the enemy with a PLRF15C

 
A number of rifles in .50 caliber are used by British Forces, from SF to the Royal Marines, which use the Barrett as L82A1 Infantry Support Weapon. The Accuracy International AW50F .50 with folding stock was also procured, and put in service as L121A1. It used by Royal Marines in counter-smuggling, as it can disable a boat with a shot well placed, but it is also use to shot at IEDs from the distance.  

The second major requirement in terms of weapon system within Sniper System Improvement Program was an Anti-Material capability provided by a semi-automatic 12.7 mm rifle to complement or replace the existing arsenal. In 2009, this requirement was estimated in around 50 rifles. Deliveries had to be made in 2010, and the selection was down to two competitors: the Accuracy International AS50 and a modified M82A1 Barrett variant. The requirement was specifically for a .50, semi-automatic, accurate enough to enable the sniper to engage sequentially 5 targets in 10 seconds. The rifle would have to immobilise a vehicle engine and penetrate laminate and toughened glass by day, out to a minimum requested range of 1800m, with a desired range of 2000m.  
AS50 and M82A1 were selected for final trials, with 8 rifles of each type requested for appropriate evaluation. Unfortunately, I’ve been unable to find further information, and I don’t know if this branch of the Sniper System Improvement has progressed, or if it fell victim to budget cuts.

A wider adoption of Anti-Structure Precision Rifles is worth considering, as such heavy caliber weapons have gained a lot of recognition during operations. The US Army and Marines identified the .50 sniper rifle as one of the most important capabilities they had available in Iraq, where the sniper war was incredibly complex and ferocious.

.50 Sniper rifles are used by Canada, US, Italy and many others. The US case is particularly interesting. In the US BCTs, the Infantry company is given a Sniper Team made up by 3 men: one is armed with the XM107 Barrett .50, one has the M24 in 7.62mm caliber and one man is in the close protection role, armed with an assault rifle, complete with under slung grenade launcher, which provides a chance to break free of engagements.  

In the Italian “medium-weight” brigades, the Infantry Company is given a sniper team of two men. The plan is to give the “sniper” a .50 Barrett, while the “spotter” gets a SAKO TRG 42 in the same .338 Lapua Magnum caliber of the L115A3.

The british sniper team, conversely, uses the .338 caliber weapon as main sniper rifle, with the scoped L129A1 apparently selected as weapon for the spotter/No. 2. On paper at least, the intended force is a Sniper Platoon of 16 men in 8 teams per each infantry battalion, even if the aim is to give each platoon a sniper (pair, ideally). 

The combination L115A3/L129A1 makes a good sniper team, but in my mind using .50 sniper rifles only for Special Forces, stand-off counter-IED and niche roles, as purely anti-material (anti-boat most of the time!) weapons is depriving the wider Army of a very useful capability. As part of the Sniper enhancement programme, in my opinion a reassessment of the .50 precision weapon is necessary. 


Improved bullets?

In June 2010, the MOD and BAE announced that a first batch of a million 5.56x45 mm rounds would be produced for experimentation, with Qinetiq to evaluate the effective eventual improvements.
Officially, this had nothing to do with Afghanistan, but unofficially, improved range and lethality quickly available for use in Afghanistan were desired.  

The current L2A2 round (SS109 NATO) uses a steel–tipped, lead core bullet, while the new, improved SS109 was intended to have a full-steel core, removing lead entirely from the equation (and so doing also removing the concerns of lead poisoning, making greenpeace happy). Nicknamed the “Dirty Harry” round, its current status is unclear. Just this week, the Guardian wrote that the Army has no lead-free bullets, and no plans to adopt them. Either the Guardian is wrong, or Dirty Harry did not progress.
If successful, the new type of bullet would be adopted for 7.62 mm rounds as well.  

The US Army has long been trying to improve the 5.56 round’s lethality. Their M885A1 round, development of the baseline M885, encases a steel core in a thin copper jacket which fragmentates in high speed impacts. The UK refuses to adopt this solution due to strict interpretation of the Hague convention, which would appear to make this unlawful.
The US have also used the MK 262 open tip match bullet, but even this solution is considered banned.  

Efforts to improve the bullets, making them much lighter, if not more effective, continue.  


Sights and Night Vision

Following a variety of UORs which brought into service a wide range of day and night sights, from the ACOGs to the MaxiKite, the Synergistic Individual Surveillance Target & Acquisition (SISTA) UOR brought into service a number of VIPIR2+ night thermal weapon sights, which had already been preceeded by 300 hand-held VIPIR-S surveillance sights ordered in March 2006 and by a further 450 ordered in January 2007. 

VIPIR2+ sights installed on a GPMG and SA80. Now that FIST STA solved the problem of providing night sights to the dismounts, it is likely that the VIPIR2s will more and more frequently be seen on support weapons, from GPMG to HMG and GMG


The Army was finally able to move onwards with FIST STA in 2009, and place a coherent order for the complete re-equipping of pretty much the whole army.
In fact, the initial order, signed in September 2009 was for delivery and in-service support of 95 Infantry Company ‘packs’, but in December 2010 a follow-on order of 51 further packs brought the total to 146 Companies, enough for whole (or almost) of RAF Regiment, Royal Marines and British Army. The first 95 Company Packs will all be delivered by 2014, with the rest to follow.

FIST STA includes:

Lightweight Day Sight ELCAN Specter OS4X each man in the Section gets one. It is the intended replacement for the SUSAT, with the (still evolving) plan predicting a gradual retirement of the SUSAT, to be complete by 2025. The ELCAN is a 4x sight, and is fitted as backup for close range engagement with the Shield-produced Mini Sight Reflex Red-Dot, said to be the smallest and most compact red-dot sight in the world.


The introduction in service of the L129A1 rises an interesting question, as the sharpshooter in the Section envisaged by FIST was to employ the L86A2 LSW, with the 4x sight. As we have said, the L129A1 is using a 6x ACOG sight, and it would be a retrograde step to reduce the magnification available to the marksmen. As I write, it is currently unclear what the long term solution will be. Perhaps bringing into FIST the ACOG 6x, or adding a dedicate procurement of the ELCAN 6x…?  



Fist Thermal Sight (FTS) a high performance un-cooled Thermal Weapon Sight that provides the User with 24hr target detection, acquisition & engagement capabilities out to extended ranges, in every weather conditions and even in total absence of any external light source. The FTS is equipped with a 640x480 format un-cooled thermal core, and is powered from AA batteries.
The FTS has an integrated Infra Red Laser Aimer (IRLA) for enhanced target identification, along with the integrated fall-back Close Quarter Battlesight (CQB) red dot sight from Shield, as we said earlier.
The FTS also has the ability to be controlled remotely via the weapon hand guard, again demonstrating an enhancement in the wider integration context.


In each 4-man Fire Team, the FTS is assigned to the Leader and to the LMG Gunner.

Common Weapon Sight the Pilkington Kite night sight is a Generation III Image Intensification (II) night sight capable to use starlight or moonlight to provide night vision. In the Army is known as Common Weapon Sight, and has been around for some time. Under FIST STA, the sight is upgraded and fitted with the Shield red dot, and then re-issued. It is used by the Grenadier and provides 4x magnification. It weights 990g excluding the 2 batteries and offers night detection of a standing man out to 500 meters with sole starlight available. 

MaxiKite 2 is the big brother of the CWS, and just as CWS it was already in service prior to FIST STA contract. Like the CWS, it gets upgraded and fitted with the red-dot before being re-issued. The Maxikite offers 6x magnification and allows targeting at night over long range (a standing man will be seen at 750 meters) and will be issued to the Sharpshooter. It weights 1.36 kg and can operate for 70 hours with a couple of batteries.

 
Grenadier UGL Fire Control System the SA80A2 with UGL is fitted with a UGL sight provided as a UOR by Istec Services of Hertfordshire, coupled with the FIST-specific Rapid Acquisition Aiming Module fire control system jointly developed by Vectronix of Switzerland and Wilcox Industries. RAAM instantly calculates the distance, angle of declination or inclination, and adjusts the point of aim accordingly.
The combined solution is valid day and night, and reduces the Circular Error Probable to 5 meters over a 300 meters range. 



MOSKITO Commander’s Target Locator a binocular day/night target acquisition system, weighting less than 1.2 kg and offering 5x daylight and 3x night magnification with a 24 hours of night vision observation duration with a set of batteries. MOSKITO measures range, azimuth and vertical angle, locating NATO standard targets up to 4 km away.

Ruggerized Digital Camera a sturdy, highly resistant digital camera to take photos or short videos valuable for intelligence examination. Issued one per Section. This commercial off-the-shelf camera produced by Olympus was specified for FIST due to its ability to transmit and receive images from patrols. Weighing only 200 grams (6.4 oz.), it is designed for harsh conditions. The camera reportedly operates even after being immersed in 10 meters (33 ft.) of water or dropped 2 meters.

Lightweight Infantry Periscope produced by Uniscope, Israel, this foldable periscope is issued one per Section and enables soldier to look past a corner without exposing themselves. It is seen as an interim solution: cameras integrated in the rifle sight relaying imagery to a head mounted display were trialed, but judged not yet mature enough. Besides, with the freezing of the “C4I” elements of FIST, there is currently no data architecture and no selected display to use in such a system, which features, instead, in Soldier Systems such as Italy’s Soldato Futuro, France’s FELIN, the various US projects and so along. This architecture makes it possible to fire accurately exposing only the weapon past the cover, something that with the LIP is not possible.  
The LIP offers a 12-deg. field of view and 3X magnification.

Overview of the FIST STA items, and how they fit into a 4-man fireteam as of 2011. Note that on operations, the L129A1 is used in the Sharpshooter role, one per Section. Since a Section has 2 fireteams, in the future one of the two Sharpshooters might continue to use the LSW. The LIP (Lightweight Infantry Periscope)  is issued one per Section, as is the Ruggerized Digital Camera (RDC). The MOSKITO Commander's Target Locating System (CTLS) is issued to each fireteam leader, so 2 per Section. Everyone gets the Light Laser Marker and the HMNVS night vision. 

While not procured under FIST STA, the Light Laser Marker (LLM) is an important component of the Lethality package. Issued in measure of one per soldier, the LLM-01, a design by Oerlikon Contraves, is a small unit mounted on the personal weapon and combining Visible Red Laser Beam Marker; Invisible IR laser marker for use with night vision equipment; IR illuminator, again for facilitating use of Night Vision equipment and II weapon sights and a Lamp Head (Visible Light torch) or Laser Head available in Marker and Illuminating variants. 

LLM unit: (1) Visible Red Light Laser (2) Invisible IR laser (3) IR illuminator provides invisible light for use with NVG (4) Visible Lamp Light or IR Invisible Lamp Light
 
In the same role, the Special Forces favor the AN/PEQ-2, which is standard issue of the US forces.  

This well known photo of a squad from the Special Forces Support Group (1 PARA) shows an H&K 417 sharpshooter rifle (second man knelling from the left) and SA80 rifles all very evidently fitted with the AN/PEQ-2
Also not directly a FIST STA component, the Head-Mounted Night Vision System (HMNVS) AN/PVS-14 is fundamental. This monocular sight, used extensively by the US forces as well, is now the standard night sight for the british armed forces, with 32.000 units in inventory as of 2011 and some 10.000 more planned, enough to give night vision to all deployed soldiers, in each section. An additional order (for all of the 10.000 planned?) has been placed in early april this year, with deliveries to be completed by 2016.    

AN/PVS-14 can also be used hand-held or rifle mounted

The British Armed Forces also use the LUCIE sight, and will use it at least out to 2023 according to current plans. LUCIE is an image intensified (II) night vision goggle.  
In this area, in 10 years, the British Army made huge leaps, as this historic figure from a 2003 Written Answer show: back then, Night Vision was pretty much stuff for special forces, with available numbers of sights for the PBI (Poor Bloody Infantryman) low or extremely low.

In the future, FIST envisages a Head Mounted Sight (a function of a multirole Head Mounted Display, I believe, like in other Soldier Modernization programmes) and a new kind of “all-doing” weapon sight combining optical, Image Intensifier and Thermal Imaging modes to provide a day/night all-weather system.
Research and development should start in 2014/15, and proceed towards a FIST 2 capability which will start delivering from 2018. FIST 1 is the current FIST package in delivery: it had to comprise Increment 1A (the weapon sights as listed above) and a Situational Awareness/C4I package under Increment 1B.
Increment 1B was cancelled, and FIST restructured in “epochs” (1, 2 and 3). Epoch 2 will be particularly important as it is a bridge, comprising the many UORs moving into Core post-Afghanistan, towards the targets of the full FIST platform for the 2030.

Another Surveillance and Target Acquisition instrument available to the Army at Team level and above is the Thales Surveillance System And Range Finder (SSARF), 707 of which have been procured with deliveries completed in 2011. The SSARF is similar in concept to the MOSKITO, but features an un-cooled thermal sight element, and is used by Fire Support Teams to detect targets for subsequent mortar, artillery or air attack.  

Observing with SSARF

Again, the British Army ordered in March 2012 a significant number of Sagem (Safran group) JIM LR (Long Range) multifunction infrared binoculars for the “Long Range Thermal Imager” requirement. The JIM LR offers day/night (infrared) vision, rangefinding, laser pointer, North seeker, GPS and data transmission. The British Army variant also provides Image Fusion between the infrared and visible channels, to penetrate camouflage during the day, and to provide true all-weather vision (through smoke, etc.). It will also be able to record imagery on USB supports.
VIPIR-S, SSARF and JIM LR should more than make up for the soon to come retirement of the old LION short range and SOPHIE Medium Range thermal imagers, by providing greatly increased Short, Medium and Long range thermal imaging and surveillance capability. 



Moving ahead

The Army has a list of programs and priorities for the next few years, and in the “Lethality” sector, we can summarize them in the following list: 



-          Reduce weight as an absolute priority as part of the long term aim of achieving a maximum 40 kg load per soldier by 2020 and a 30 kg load by 2025, with a 25 kg load considered ideal.
-          L129A1 expected to live on “well past 2015”, being brought into core
-          NLAW and ASM fully in service
-          60mm Mortars to stay
-          SA80 replacement initial gate in 2014, with fielding in the early 2020s. A SA80A3 upgrade remains a possibility.
-          The polymer-made lightweight magazines procured as UOR are intended as an interim solution, with a Lightweight Magazine Long-term replacement planned.
-          A Lightweight Bayonet is planned
-          A Lightweight GPMG is planned
-          The LMG Minimi will be “reconfigured”, likely to reduce weight and install a longer barrel
-          Weapon Paint Rounds systems for training
-          Powered rails on the personal weapon, connected to the Soldier’s power system for easy attachment of accessories and reduction in the number and weight of batteries to be carried
-          Round counting   
-          Rationalization of Hand Held Thermal Imaging equipment
-          Lightweight binoculars and monoculars
-          Development of an Universal Helmet Mounting system


Personally, I’m adding to the list the already mentioned .50 sniper rifle reassessment, plus considerations for adoption of the 120mm mortar-cannon. In future posts I’ll also explain my opinion on the need for re-establishing the Platoon-level Maneuver Support Section and the need for a powerful Fire Support Group at Company Level.


Finally, a note to this and other posts of this series: the argument I’m treating is immense, and very complex. A huge numbers of UORs and years of delays, changes and rethinks on a variety of programs have made this subject very complex to treat in full detail.
Despite my best efforts, I might be missing something here and there, or even making some mistakes. Believe me when I say, however, that I’ve tried to cross-cue as much as possible, using as many, as reliable and as up to date sources as possible. I will welcome any useful contribution you can make to improve this and other posts. 


Friday, August 3, 2012

Royal Engineers and Army 2020

As i had imagined and anticipated in the previous posts on Army 2020, all Field Army Engineer formations are being removed from the single brigades and grouped together under 8 Engineer Brigade, under Force Troops command.

"All capabilities have been retained, and in some case enhanced" is the official position. I hope "all" means "all" and not "most". My worries mainly relate to the M3 rigs (mothballed out to 2015 as the RE focuses on Afghanistan, and with their Regiment, 28th, now planned to disband as part of Army 2020) and the long-term retention of the precious, hard-won capability provided by Talisman in the route clearance role.  Unfortunately, for the moment there is no greater detail in the exact composition of the force elements.

The greater integration with the Territorial Army reserve personnel is a target, obviously, but the Royal Engineers are not meeting their current targets, and have recruitment and retention problems already now, and this, of course, does little to inspire confidence for the future. As of June 2012, the TA element of the Royal Engineers numbers 230 officers (70% manned) and 2230 other ranks (just 55% manned) with more than 600 undergoing training.

Wednesday, August 1, 2012

Typhoon's present and future


The Typhoon’s future


Farnborough brought forth a much celebrated agreement between UK, Germany, Italy and Spain for the go ahead to the next phases of the Eurofighter Typhoon’s enhancement programme. Good news, undoubtedly, but is it really something worth celebrations?

Sadly, looking into the details, the situation isn’t properly one which inspires pulling out champagne bottles from the fridge. In fact, the Typhoon evolution is finally about to move one step onwards, but seems to have effectively been slowed again for other aspects, and it continues to be hampered by lack of money and unity of intents and action between the four partner nations.

There is, however, a ray of hope as I’ll explain in this article. Please bear with me as we delve in a world made of Tranches, Blocks, Software Releases, Change Proposals and countless other confusing elements.  



Phase 1 Enhancement (P1E)

The thick of the Typhoon fleets in Europe currently is made up by Tranche 1 Typhoons with a very limited air to ground capability.
The Tranche 1 Typhoons were initially delivered with Basic Air Defence capability (Block 1), then came the Block 2 and 2B with more complete AA capabilities, and finally the Block 5, which introduced some air to ground strike capability. All Tranche 1 Typhoons are being upgraded to Block 5 standards under the R2 retrofit program.

Block 5 Typhoons, known in the RAF as FGR4, (Fighter/Ground attack/Reconnaissance) come with the capability of employing laser guided ammunition (Paveway II for the UK, GBU-10 and GBU-16 for the other partner nations), but only with laser designation provided by a third party (either a land-based designator or a pod installed on another aircraft, much like the Tornado GR1 in the Gulf War, which launched paveways on laser designations made by the old Buccaneers!

This same level of capability is provided by the Block 8 airplanes, part of the Tranche 2 order.

The sole Royal Air Force in 2006 launched an urgent national initiative for fitting Tranche 1 Typhoons with a better “austere land attack” capability, as a replacement for the Jaguar airplane and as a step in preparing the Typhoon for an anticipated deployment to Afghanistan in 2011. The deployment actually never happened, but the initiative became a £73m deal signed on 20 July 2006. Known as Change Proposal 193 (CP193) within the Typhoon program logs, this modification gave the Typhoon Tranche 1 Block 5 of the RAF the capability to employ the Litening III laser designation pod, removing the need for third-part designation. It also enabled carriage of the Enhanced Paveway II, which adds GPS to the laser seeker so to enable all-weather attack capability.

Good work was made on the Litening III integration, which incorporates a ROVER 3 (remotely-operated video enhanced receiver) air-to-surface secure full-motion video data link, which allows pictures and data to be transmitted from the Litening pod directly to a forward air controller on the ground via a laptop-type terminal, with minimal lag or latency. This enhances close air support effectiveness by improving target identification and minimising miscommunication. ROVER also provides a limited real-time reconnaissance capability, since Litening III can record still imagery as well, “taking photos” like a recce pod. The system is also compatible with the later Rover 4 and Rover 5, and with the Rockwell ‘StrikeHawk’ Miniature Tactical
Video Downlink Receiver adopted by the British Army’s Fire Support Teams.

In 2007, finally, the other partner nations joined in the Air to Ground development effort with Change Proposal 210, which basically introduces in all nations the capabilities the RAF added with CP193. The agreement came too late to have this capability included in the Tranche 2 Block 8 airplanes, so that, while they incorporate over 400 improvements, the current Tranche 2 Typhoons have less air ground usefulness than Tranche 1 Block 5.

The Phase 1 Enhancement contract, born from CP210, was finally signed on 30 March 2007.
Improvements will be delivered in two incremental software releases: P1EA will come with the SRP10 software  while P1EB will come with the SRP12 software.

Test activities began on 24th October 2008, using the Alenia-owned IPA5 development airplane to start flight trials with the 500-lb Paveway IV.
It was then joined in 2009 by IPA-7, owned by Germany’s Cassidian, which flew handling trials with the Paveway IV bombs loaded and the new P1EA Missile Warner system installed.
Spain’s IPA-4 airplane flew with the 1000 pounds EGBU-16 between February and April 2009, and made five drops of the bomb, and finally, from 18 june 2009, BAE’s IPA-1 began drop trials of Paveway IV, making 15 bomb drops over the Irish Sea. In February 2011 there was the first guided launch of Paveway IV, and in early 2012 the final demonstration, validating in full the self-designation capability and employment of Paveway IV in all its modes, was started.

[NOTE: IPA stands for Instrumented Production Aircraft. These are five production standard aircraft plus 2 converted Series Production aircrafts fitted with telemetry instruments for dedicated flight testing and further systems development. They are owned and operated by the various companies part of the Eurofighter team:

BAE has the IPA1, IPA5 and IPA6.
Alenia (Italy) has the IPA2
EADS (Germany) has the IPA3 and IPA7
EADS Casa (Spain) has the IPA4

IPA6 is a Typhoon Tranche 1 standard (BS031), taken up from the RAF order and fitted with Tranche 2 avionics for testing prior to Tranche 2 deliveries to the air forces.

There are also 6 DA Typhoons (Development Airplanes), some of which have now been assigned to museums, while others remain in use for testing. One DA airplane, Spain’s one, was lost to an engine failure in 2002.]

As of now, P1EA flight testing is complete, and the NETMA agency is going to give its documentation to the partner nations, which will then complete their own process for clearance and entry into service.

According to Eurofighter, P1EA introduces the following improvements:

-          Integration of Paveway IV and EGBU-16
-          Dedicate Air-Ground mode for the 27 mm gun control software
-          More mature integration of the laser designation pod
-          Expanded communications fit, new radios
-          IFF mode 5 upgrade
-          Multifunctional Information Distribution System (MIDS) enhancements
-          New Differential GPS navigation system
-          Complete digital integration of IRIS-T short range air to air missile

The more mature integration of the laser pod comes down mainly to enabling it to work at wider angles than those cleared with CP193.
The IRIS-T so far was not completely integrated. To the UK this is of little interest, since it uses ASRAAM, and this was fully integrated already in Tranche 1 Block 5.

P1EA also includes unspecified improvements to a range of systems including Rover terminal integration (to share imagery from the targeting pod with air attack controllers on the ground equipped with the Rover laptop), IFF, Forward Looking Infra Red FLIR, Chaff/Flare and DASS self-protection system, with improved accuracy of threat detection and enhanced countermeasures technologies.

SRP 10 software will also allow up to six non-sequential or four simultaneous surface strikes in a single pass.

P1EA will finally hit service in the first quarter of 2013, if all goes according to plan. By September, the RAF expects the Paveway IV bomb to finally be operational on the Typhoon.

The P1EB software will add new display formats for the air-to-ground role, significantly improving the Human Machine Interface (HMI), minimising the pilot’s workload in the most complex scenarios and facilitating simultaneous swing-role operations by allowing a pilot to continue a bomb run while at the same time fighting off air attacks. Pilot workload will be further reduced by expanded and enhanced Data Link 16 / Multifunctional Information Distribution System (MIDS) functionality, with much greater data transmission capacity.

There will also be a two-stage delivery of Direct Voice Input upgrades, with the first package of enhancements increasing the vocabulary to almost 90 commands, and allowing the pilot to request information to be displayed for any target or waypoint by voice command.
It will also allow the pilot to manipulate the Laser Designator Pod and even to create a waypoint at a point of interest with just two commands. Combined with the HEA (Head Equipment Assembly), with the Striker head-mounted display, this will dramatically improve combat effectiveness, as the pilot will be able to engage targets in all directions without having to physically turn the fighter around. He will also have complete access to all relevant information on his display, regardless of where his head is pointed, without the need for looking down at the HUD or cockpit screens.

P1EB flight trials should have already begun: the plan was to start the test flying on July 20 with BAE’s IPA6 airplane.



But Brimstone and Storm Shadow? Keep waiting.

P1E is to be followed, in the future, by a Phase 2 Enhancement program (P2E), again released in incremental steps.
There is a first commitment to this next phase, a “contract one” signed, but we are still quite far from having a precise plan for the future. According to Eurofighter:

In the future, it is anticipated that Nations can continue to develop the product but maintain a common baseline product and reduce the dependency on funding being available from other nations. This approach has already been successfully applied to the Tranche 1 product (Note: with RAF money with CP193).

As it has done with AESA development, industry has self-funded some forward development work on advanced air-to-ground capabilities in support of the export campaigns.

There is a growing recognition that with the partner nations all under budgetary pressure, in order to sustain the technology base, Eurofighter may have to share the development of new technologies with partners beyond Europe. As a result, export customers will have the same ability to push the pace of weapon integrations, even if the weapon required is not a priority for the partner nations.

The ability to integrate a new targeting pod and new weapons (ones not previously associated with the Typhoon), and in such a rapid timescale, speaks volumes for the adaptability and agility of the aircraft – and of its manufacturers.

With the India order a broken dream, it is Saudi Arabia that has to drive things forwards, along with the UK.
And, luckily, the Saudis are quite active: this year their Tranche 2 airplanes will be modified to use a Laser Designation Pod, and they will be the first nation having self-designation capability on Tranche 2 airplanes, for the issues described earlier. The pod selected is the French Damocles LDP, already used by the Saudis on their Tornado fleet. Saudi Arabia purchased Paveway IV bombs from the UK for 457 million USD, initially for use on Tornado, and then on Typhoon, in early 2011, but the US are opposing the sale, and Saudi Arabia is reportedly considering buying France’s AASM if the issue can’t be solved. It would be a major blow for Raytheon UK, caused by what is supposed to be “the best ally”, the nation which, more than anyone else, pours technology and weapons into Saudi Arabia. But the US do not want to take risks on the US-produced advanced Anti-Jamming GPS unit used on the Paveway IV, and the diplomatic conflict continues to rage, albeit behind curtains of silence.  

In addition, Saudi Arabia has abandoned earlier plans of producing the last 48 of its 72 Typhoons locally. Difficulties with the industry complex meant a change of plans, and now BAE Systems will build at Warton, in the UK, all of the Saudi Typhoons. In exchange, the last 24 airplanes will have Tranche 3 features, and Saudi Arabia is pushing for the airplanes to come fitted for (and possibly with) electronically scanned array radars and conformal fuel tanks. They are pressing ahead energically with P1E enhancements, which they might achieve before of the four original partner nations.
Saudi Arabia likes the Typhoon, but wants it to develop its air-ground capability. Quickly. Providing them with the capability they want is crucial for securing a widely anticipated second Typhoon order, which could be for another 72 airplanes.

The UK might find the best ally in Saudi Arabia, in the fight for ensuring that the airplane is finally fully developed and armed.
Going with the original European partners seems to slow everything down. According to Eurofighter:

The four nation future capability plan is also under evaluation, though it is likely that Storm Shadow/Taurus cruise missiles will be integrated by 2015, with the advanced Dual Mode Brimstone multi-role close air
support weapon following.

Ignoring the fact that Dual Mode Brimstone will start being supplemented and replaced by Brimstone 2 already next year, it must be noted that we are facing another delay in the plan. It had been hoped to see Storm Shadow and Brimstone fielded by 2014.
Both weapons are said to have Saudi Arabia’s interest, so perhaps the RAF and RSAF could go ahead on their own.

Again, Eurofighter adds:

The Typhoon will wait until mid 2016 for clearance of the Meteor BVR air-to-air missile under a specific Meteor Integration Contract, though development and risk reduction activities are moving ahead, and the planned AESA radar will be introduced in 2015.

Mid 2016 now…? Well, not bad, considering that the Typhoon was originally planned to have Meteor by 2011! Until this Eurofighter news came out, the planned ISD in the RAF was July 2015, but even this target will apparently be missed by a good bit.

Even the AESA radar bit is not as good a news as it would seem. Even if the AESA radar was available by 2015, would it be actually be fitted into the airplanes? Would it be provided at build on Tranche 3 aircrafts at least? For Tranche 2 it is too late already, and a retrofit will be needed if AESA is to be fitted.
Worst part is that it might be late even for Tranche 3 production: orders for Captor radar components for the Tranche 3 Typhoons have already been placed, and work started. Large parts of the system should be the same, but it is not clear what the plan exactly is.

In 2010 the RAF had walked ahead of the other partner nations by placing a 16 million pounds national contract with Selex Galileo for the development and demonstration of an AESA radar solution for Typhoon. It should fly on a RAF Typhoon next year, and is known under the program name Bright Adder. The radar is to have a big air-ground focus, but also, reportedly, the capability to work as a communication data link and an electronic warfare weapon.
The radar aerial is not fixed like in current AESA radars, but mounted on a repositioner, giving a 200° field of view, against a common 120°. 
Similar, yet not the same, is the Captor-E main AESA effort, being brought forwards by the Euroradar consortium. It first flew on a Typhoon in May 2007, and earlier still there was CAESAR (Captor AESA Radar), test flown on a BAC-111 test-bed aircraft.
However, progress was scarce, and the RAF decided to go ahead on its own to have a Plan B in case things would not work.

Finally, in July 2010 the Euroradar consortium made a formal offer to provide an AESA solution for the Eurofighter, following which industry funded the development of a production-series standard AESA radar system, and this is what is now being pushed forwards.
The unit is based in part on the back end of the existing CAPTOR, and on the Selex Vixen 1000E or Raven ES-05 currently under development for the Gripen NG. It uses a similar wide field of regard repositioner for wide field of view, like Bright Adder.
Intended capabilities include greater simultaneous radar functionality, with faster and more accurate detection and tracking of multiple aircraft.

The UK Typhoon Tranche 3 should be at least fitted for (and hopefully with...) adoption of two dorsal 1500 liters Conformal Fuel Tanks. These would prove incredibly useful in the land attack role, as they equate the capacity of 3 auxiliary fuel tanks but do not take away any of the weapon pylons.
This is crucially important because the sole 2 pylons rated for Storm Shadow carriage are the “wet” pylons: either it carries Storm Shadow, or the fuel tanks.
The third auxiliary fuel tank would go in ventral position, where the Laser Designator Pod is normally installed, even if for a long time the LDP has been shown in Eurofighter images fitted at one of the semi-conformal hardpoints under the fuselage. 
It is obvious that having conformal tanks solves a few awkward problems!

BAE Systems curiously reports a story slightly different: according to them, there is no longer a P2E phase, this having been abandoned 

“… in favour of a more organic ‘heartbeat upgrade cycle’. This will see new capabilities being integrated according to a two-year software upgrade cycle featuring SRP 14, SRP 16, SRP 18 and SRP 20, rather than one single big upgrade.”

One possible interpretation of this difference is that, as I suggested, the UK might be looking to a national plan, coherent with the larger Eurofighter plan, but at the same time different. BAE, RAF and RSAF might be about to go onwards on their own path. And indeed BAE adds:

In the wake of the recent ‘Contract One’ signature, the UK now has the power to be able to press ahead with such upgrades even without the participation of the other partner nations. This is a new and important development, and, in concert with the demonstrated new ability to rapidly integrate new
weapons (shown by recent Saudi Typhoon plans), should ensure that the RAF can equip its Typhoons
with the capabilities it requires more quickly than would otherwise have been the case.

Many new capabilities will of course, still be required by all of the Typhoon partner nations, and incorporated as part of a four-nation approach, including – for example – AESA radar.

According to some sources the Storm Shadow/Taurus air-launched cruise missile and the Brimstone air-to-surface missile should be integrated under SRP 14.
Similarly, SRP 14 should also introduce an initial operating capability for the Meteor air-to-air missile, with SRP 16 adding full Meteor operating capability.

The planned AESA radar (known as Captor E) should be introduced with either SRP 16 or SRP 18, though at one point this was expected with SRP 14 (in the case of aircraft built for India) and with SRP 16 for the four partner nations to meet an entry-into-service target date of 2015.

The situation is complex, between Tranches, Blocks, SRPs and, now, even the contradictions between BAE’s words and Eurofighter’s words.
I must also admit that I really can’t understand how the “2-year cycle” for software releases actually works. If SRP16 means 2015 ISD, SRP14 should arguably mean ISD in 2013, no? Instead, in 2013 we’ll get SRP10.

The feeling is that software releases are actually years late into active service…



RAF Fleet growth

Number 1 (Fighter) Squadron will reform officially at the RAF Leuchars Jubilee Air Show on 15th September becoming the fourth front line squadron to operate the Typhoon in the UK. According to the MOD Business Plan 2012, the new squadron will achieve Initial Operating Capability in March 2013.

The fifth Typhoon squadron, again to be based in Leuchars (until the planned move to Lossiemouth, at least) will stand up and achieve IOC between April 2013 and March 2015. The identity of the squadron is not yet known.

Full Operating Capability for the Typhoon force is expected in March 2018.

The latest reports, via Jane’s, suggest that the plan of retiring the Tranche 1 Typhoons by 2019 will be abandoned. They will instead be retained, and two more squadrons will be formed, to keep up RAF strength as the Tornado GR4 bows out, by 2019 according to the latest plan.
In addition there would be 48 F35B for the Carrier Strike fleet, procured apparently between 2013 and 2023.

There are some problems in retaining the Tranche 1s, however. The role for which they could more easily be retained is the Air Defence / Quick Reaction Alert role, but even for this, the airplanes would ideally need the AESA radar, since Meteor is best exploited with such a radar system. Other improvements would also be necessary, and of course the missile integration would have to be validated on the older Typhoons. As it is, Meteor is being integrated on Tranche 2 and Tranche 3 only.  

On the other hand, using them in the Swing Role / Land Attack role in the long term is hardly conceivable, as it would require a massive weapon integration effort, plus even more modifications to software and hardware.
And unfortunately, Tranche 1 airframes are weaker than Trance 2 and 3 ones: there are narrower payload limits, and other differences that make it impossible / economically unfeasible to upgrade them to a common standard. It’s the first reason why the plan for an early retirement in 2019 came up to start with.
Development of Tranche 1 Typhoons was indeed to end with SRP 4.3 / Block 5 under the main Typhoon contract. Fortunately, an agreement has been found between the partner nations to continue delivering “Drops” of software upgrades into Tranche 1 airplanes.

It’ll be interesting to see how the RAF approaches the unique challenges of keeping the Tranche 1 in service into the 2020s, if this ends up being the path chosen as it now appears likely. For sure, it’ll be years still before the Typhoon becomes a complete system.



Typhoon’s performance in Libya

All Typhoons employed in Libya were Tranche 1 Block 5 ones, due to the awkward situation we talked of earlier, which sees Tranche 2 airplanes being currently less capable in Air to Ground work than the older Tranche 1.
The Typhoon was limited by its AG armament, limited to the sole 1000 pounds Enhanced Paveway II and Enhanced Paveway II+  (The Plus is a UOR development which couples the Paveway II to the anti-jamming GPS module used by the Paveway IV), but in one area at least it came with a great advantage on Tornado GR4.
The Typhoon is fully network-integrated, and thanks to its Data Ling 16 MIDS it can see the situational awareness picture all the time, sharing data in real time with Sentry, Sentinel, Reaper, with all NATO combat airplanes and with suitably equipped ground stations.

The Tornado GR4, unfortunately, to this day is left without a Data Link capability. It is a very relevant limitation, which makes everything more complex: Flight Lieutenant John Robins-Walker, of 14 Squadron, said after an Afghanistan tour that the lack of Data Link connectivity left them without situational awareness, almost like they were blind. To know the situation in the crowded Afghan sky, they could only relay on radio calls to the AWACS assets in flight at the moment.
For a Tornado GR4, sharing data with other assets is currently impossible, other than via voice communication on the radio, whereas a Link 16 enables a constant upgrade on the position and status of all allied platforms and also makes it possible for the troops on the ground, of any NATO nation, to send standard 9 lines messages for calling Close Air Support, in near real-time and without translation issues, an important factor in a multinational scenario of operations.

The RAF is aware of this problem, and in December 2007 a contract was signed for the Capability Upgrade Strategy (Pilot) programme. This was confirmed in the SDSR 2010 when the decision was made to keep Tornado in service:  

[…] 96 Tornado GR4 aircraft will receive capability upgrades between 2011 and 2014 at an estimated cost of around £300 million. This number of aircraft is sufficient to maintain the operational capability of the Tornado GR4 Forward Available Fleet until OSD. There are currently no plans for the aircraft to receive any further capability upgrades after 2014.

Under CUS(P), General Dynamics UK was selected to provide the Tactical Data Link (TDL) sub-system of the Tactical Information Exchange Capability (TIEC) programme for the Royal Air Force Tornado GR4 and Harrier GR9 aircraft, integrating the Link-16 and Improved Data Modem (IDM) on the aircrafts. TIEC integrates the Link-16 and IDM messaging functionality with the aircraft systems to provide the aircrew with enhanced situation awareness that will enable the prosecution of Time Critical and Time Sensitive Targets and will support dynamic re-tasking of the platform and provide a significant enhancement in the area of coalition operations.

The Harrier GR9 was ahead of Tornado in terms of network integration, and flew with its own TIEC version in June 2010.

The TIEC is/was to enter service in 2012 on Tornado GR4, but current status of the programme is not known. A Tornado GR4 fitted with TIEC first flew in November 2010, however, and hopefully we’ll hear something soon about Entry into Service.
The Tornado GR4 is also due to get Secure Communications on Tornado (SCoT), a packet of software-controlled radios developed by Ultra under a 2005 contract. SCoT flew in 2010, but it is not yet in service. Its main purpose is to simplify the pilot’s life by memorizing frequencies and radio networks, allowing the crew to select the needed channel for talking with other airplanes or troops on the ground much more quickly and easily, using a simple interface.

As a UOR, in the meanwhile, Tornado was fitted with the CAGNET multi-band transceiver (based on a Rohde & Schwarz MR6000L software radio) which embodies the Have Quick II waveform used for air-ground communications with JTACs. CAGNET is effectively an half-way house for the longer-term SCoT in which Rohde & Schwarz figures as a principal subcontractor. SCoT in fact uses the very same transceiver, but has additional waveforms including SATURN.

The current MOD position is that whatever improvement Tornado needs, it must get it by 2014, because there won’t be funding for any other upgrade after that date, due to the currently anticipated Out of Service date being 2019. The Tornado’s force at readiness is also going to shrink massively by 2015 as Afghanistan needs end, dropping from 40 elements at readiness to 18.
In the meanwhile, Typhoon force elements at readiness will increase, and their air to ground capabilities will expand. As we’ve seen, though, Tornado GR4 is going to stay the sole Storm Shadow/RAPTOR/Brimstone platform for quite a while still.

In Libya, the Tornado GR4 and Typhoon flew together so that the Tornado crews could be briefed on the radio by the accompanying Typhoon crew about the Data Link 16 picture that the GR4 can’t see. The Typhoon also worked as a “mini-AWACS” of sort, thanks to its powerful radar and data link, and its DASS self-protection system would keep track of any menacing radar transmission in the area, helping to keep the pilots aware, both on the Typhoon and on the Tornado accompanying. In exchange, initially, Tornado GR4 pilots guided the far less experience Typhoon pilots in the ground attack missions, and for a while laser-designated the targets for the Typhoons.
Eventually, when enough operational experience was built up, Typhoons started to carry Litening III and self-designated their targets.

To understand what kind of impact Data Link 16 and MIDS have, I’m reporting the words of Wing Commander Patounas, 3rd Squadron RAF, as appeared in the BAE book “Typhoon: a year on the road”.

As I coasted out from Sicily, I could move my map down to Libya, see every single aircraft that was in the AOR, click on any track, open it up and it would tell me the call sign, how much fuel it had, the height and heading, and its type, tanker, UAV, fighter, ISTAR, the whole hit.
“I had a picture of what was going on in the AOR and the disposition of the maritime fleet, so I could see where the carrier group (sadly not a UK Carrier group…) was, where any destroyers were, and see which types they were.
“And if ASTOR or Joint STARS were out there and painting ground tracks, that information would also be available. I could have details of ground tracks of interest and still have an hour transit to go. I was able to form a picture of what’s going on before I got there.”
 “We’d get airborne about 20 minutes after the Tornados and put them up on our radar, typically 100 miles ahead. We’re all heading to a point in space where we’re supposed to meet the tanker. Looking at the display I can see that there is no tanker; sometimes tankers break. So I already know there’s no fuel and spoke to C2 [the command] using JVOICE, which is the voice capability on Link 16, who advise me that a tanker is coming. Once I know the position to meet the tanker, I would instruct the Tornados and meet them at that point. That saves the Tornados a whole stack of gas because they have not gone hundreds of miles in the wrong direction.
“That’s one part of the link. If I received tasking away from a Predator, I would always want to know where it was and would ask to speak to the Predator crew to see if they had identified anything of interest. Because we can travel quickly, we can pop over to the Predator’s location and help, or add perspective to what the crew is watching on their screen, and often bring weapons to something that the crew wouldn’t engage.
“You can be pro-active in your search, go to where you’re told but you don’t know what you’re looking for because you don’t know what’s going to be there or what’s going to occur, it was all very dynamic.
“Rather than just sitting [on Close Air Patrol] unaware of what’s going on around you, [MIDS allows] you
to see there’s nothing going on where you are and that everyone’s at a different location. By suggesting that you move there to help we could help C2 out that way.
“And also you can send effectively text messages, so if you have radio problems, you can just send people messages over and above, so it really, really does enhance stuff.”

Provided the aircraft is on the link, the pilot has connectivity and can speak and communicate. “It’s like a wireless internet connection: when you’re on it you can use all the functionality,” said Patounas.
MIDS also helped pilots to de-conflict. Even in a tactical fighting situation flight safety is paramount and MIDS allowed aircraft to be identified in the battle space.
“C2 can’t tell you everything, but before we even get there [using MIDS] I can advise that there’s a pair over there, and we’re heading to that same area. Often you’d see them ahead of when you would have ordinarily picked them up.”
MIDS is also a huge advantage with locating the positions of unmanned aircraft, which move slowly and are difficult to spot. They are displayed and could be seen nine times out of ten when in the vicinity, according to one Typhoon pilot.