Sunday, November 23, 2014

Type 26 frigates: new info and some thoughts


My earlier post on the reported troubles with firming up costs for the Type 26 and with getting to contract award have been generating a healthy discussion in the comments section, and that is great. Someone has been reading in my post a sort of hostility from me against the Type 26. I deny this very firmly. My point is another: for what we know about the ship requirements (settled in May 2012 and stable since then) and MOD-endorsed design (which has been frozen in its main lines for quite a long while, now), there is nothing excessively revolutionary that should make this platform unaffordable, considering how much equipment will be carried over from the Type 23 frigates.
It is not my invention, but a fact, that the Royal Navy has deliberately shaped Type 26 as a program which builds on earlier, incremental improvements adopted on the Type 23s and then moved across, without seeking innovation at all costs. A rough figure has been suggested, putting Type 26 in the field of "80% old, and 20% new".
This does not mean that Type 26 won't deliver a step change in capability from the current Type 23s, but rather that it will deliver so using already existing technology, and indeed re-using a fair amount of equipment.
The savings obtained by re-using equipment and by sticking with proven technology and systems are to be employed, in the idea behind the programme, to ensure a decent number of hulls get built, and to ensure that those hulls come with some new and exciting capability thanks to their large size, large aviation spaces and vast "flexible" mission space and, importantly, a large vertical launch silo that will open up routes the Type 23 has simply never been able to pursue.
I very much like the general idea, and my only wish is to see it working as intended.

I'm writing this new article because i've come across some excellent material that provides some great details about the Type 26 design that has been finalized and is being costed ahead of the Main Gate. The document is a letter, dating October 2014, from the Secretary of State for defence to the house of common's defence committee. The SoF replies to a series of direct questions, and provides some excellent information.

First of all, the Flexible Mission Bay. There is no indication of its size and shape, but the SoF finally provides a confirmation that the helicopter hangar is directly connected to the Mission Bay, with a passage large enough to enable the transfer of manned and unmanned aircraft from hangar to mission bay.
Hangar size unsurprisingy at least matches that of the Type 45: the destroyer is slightly larger in beam, but the hangar is not full-width, as it has the RHIB bays on both sides. On Type 26, there are no boat bays, although it is likely that the helicopter bay will be flanked by logistic and aviation stores spaces and by the delivery end of the new mechanized Air Weapons Handling System, designed by Babcock, which is to store, retrieve and deliver the weapons for the embarked helicopter to the Weapons Preparation Area.
Apparently, the AWHS will also handle the Stingray torpedoes for the ship's launch tubes (if they will be fitted, see further down in the article).
The hangar thus can be assumed to match the Type 45's one and it might actually be larger: the SoF says it "comfortably" fits one Merlin or 2 Wildcat. Using the Mission Bay space, more aviation resources could be carried: UAVs, both fixed and rotary wing, but also additional manned helicopters. It would be possible, albeit with limitations, to embark a second Merlin in the Mission Bay, the SoF specifies.
The ability of the mission bay to communicate directly with the hangar (and thus with the flight deck) is an eminently sensible feature to have, and it is good to have the confirmation that it will be there, and with ample chances of exploiting it over the long life of the ships (at least 25 years of design life).

It is also confirmed that the Flight Deck is being sized to allow a Chinook to land and deploy the ramp to enable comfortable embarkation and disembarkation. The compatibility with Chinook, while not strictly necessary, is useful as the heavy transport helicopter could make good use of the ample Embarked Military Force contingent that can sail into a Type 26, and it could also be used to bring aboard capability modules and stores.
Moreover, the Chinook-sized deck should also, and probably mainly, be seen as a way to ensure that simultaneous UAV and manned helicopter operations can happen with suitable space available for necessary deconfliction.
These features add a huge amount of flexibility to the design.


The mission bay itself is a large open space stretching from side to side, with large doors on both sides for deploying boats, unmanned surface and subsurface vehicles, as well as to embark mission modules which can come in containers as big as 20 feet standard TEU.
The mission bay can hold up to four 12 meters boats (and probably a few containers of additional equipment in the middle of the bay, judging from images seen this far) or up to 10 modules / 20 foot containers.
This flexibility will be invaluable in adapting to future missions and in enabling the adoption of future unmanned vehicles which are almost certain to become not just the main MCM system, but also more important in ASW. Having space and infrastructure is, consequently, very desirable for warships which have to last long into the future.
The UK is actively collaborating with France to develop modular payloads for MCM operations, and such developments are happening in other nations across NATO: the UK has taken the lead, according to the letter, for a project that aims to set international standards for the module interfaces, so that foreign systems in future can be embarked and operated where necessary.
One thing which isn't yet detailed is what kind of equipment the ship will have for embarking and disembarking containers and modules: will she depend on external infrastructure, or will the slide-out gantry crane be able to lift not only boats, but also the containers? It will be interesting to see which solutions are adopted. The mission bay will require a strong deck, as reinforced as the flight deck itself. A fully loaded TEU can weight some 24 tons, so a useful payload margin of at least 240 tons is apparently requested. The mission bay estimated size, considering what it can fit, is probably not inferior to a 15 meters long, 20 wide space.


The Type 26 will have a crew of 118, and room for 72 other personnel for the aviation element, for boarding teams, pre-landing forces of the Royal Marines, or for specialists coming to operate the modular mission systems. From the SoF letter, it becomes clear that some real attention has been paid into giving the frigate excellent capability to host the Royal Marines pre-landing party.
In recent times, HMS Montrose, a Type 23 frigate, experimented with a sizeable pre-landing force of over 70 Marines in 2012: must have been a real tight fit on a Type 23, but on the Type 26 there will be space and infrastructure to do much better.

In terms of weapons fit, the letter specifies that the vessels will be fitted at build with a sizeable Flexible Strike Silo numbering 24 cells, for anti-ship, land attack and anti-submarine weapons. The letter specifies that the cells will be american MK41. This is a surprise, since earlier info suggested that since MK41 is somewhat larger than Sylver modules, only two launchers (for 16 cells in total) could be fitted: it appears it is not so, and the higher number of cells has been confirmed in the finalised design.

Confirmed are the 48 Sea Ceptor canisters as well, almost certainly in the two silos configuration seen in CGIs and models so far, so with 24 cells on the bow, ahead of the strike cells, and 24 aft of the funnel mast, amidship.
The Type 26 will have a 127mm gun, too, replacing the old MK8. I'm told that, although it has not yet been officially announced, only the MK45 Mod 4 remains in the frame, with the Oto Melara 127/64 out of the race. Jane's had reported a while ago that the MK45 had been given preferred bidder status, so it seems things are moving in that direction. The new gun will "allow" the Navy to buy into the new long-range guided ammunition being developed for the calibre, which is a NATO standard, unlike the 114 mm of the MK8.
There will also be two 30mm light guns, as expected, and the possibility to fit two Phalanx CIWS.

The list shown in the letter comes without one notable piece, however: it makes no mention of Stingray torpedo tubes, which is very surprising considering that the Type 26 is an ASW platform, and that the launcher systems could reasonably be transferred from the Type 23s.
It is an omission that causes questions to arise: it seems unlikely that there would not be such a fit on this kind of vessel, especially since vertical launch anti-submarine rockets, which are mentioned in the letter, are not in british service, and would have to be somehow procured (read: financed, as that is the issue). It is not a product line where there is much choice: the americans have the ASROC, the italians have the MILAS (which is not vertically lauched, however) and the South Koreans are producing a system of their own. Japan also has its own anti-submarine missile system. None of these is fitted with a british Stingray torpedo, obviously, although this could probably be fixed quite easily.
Not fitting the torpedo tubes would be a puzzling decision, if confirmed. The ship's tubes are admittedly more of a snap self-defence fit than anything else, considering the limited range of the lightweight torpedo fired from them means that the frigate launching them would probably already be under attack by the enemy submarine; but doing away with them entirely, besides while not having a clear path to a vertical launch solution, is questionable.
Might it be just a case of them having been "forgotten" in the letter? Can't be excluded.

The letter also has another nice little bit of a news in itself: the FASGW(L) missile, the Thales Light Multi-mission Missile, has been given the name MARTLET in british service. This hadn't been disclosed to the public before, as far as i'm aware, unlike Sea Venom which was named earlier this year.

(Secretary of State for Defence - Type 26 letter to the defence committee)




A displacement of 8000 tons? 

Type 26 is going to be a large and "dense" warship. The 6000 tons displacement quoted by BAE is pretty much certainly not the weight of a fully loaded Type 26, and indeed some recent news reports have suggested that the ship might now be an "8000 tons full load displacement vessel". I'm however not sure i can believe the 8000 tons value at this point, because it sounds excessive in relation to the specifications and the size of the vessel, but it will be an heavy ship, that's for sure. The SoF letter does not provide any helpful indication about this subject.

Type 26 is 148,5 meters long and around 20 meters in beam. Not too far from the 144,6 and 19,7 meters of the italian variant of the FREMM frigates (the french ones are slightly shorter, as the italian ships are being lenghtened post-build by some 3,5 meters adding an additional section in the stern) which have a declared displacement of 6700 tons, sometimes indicated in more than 7000. The italian navy has released some different, contradictory figures for the displacement, which consequently isn't identifiable with certainty. Even the reason for the lenghtening isn't yet fully clear: officially, the expansion was mainly due to the need to improve all-weather operations with the AW-101 Merlin helicopter and was exploited to provide additional accommodation space, 100 tons of additional fuel (bringing endurance to 6700 nautical miles against 6000 earlier) and a second RAS station. The weight increase coming from the lengtening was indicated in 250 tons.
Unofficially, there have been strong suggestions that the lenghtening has been inspired by the wish to correct weight distribution, as the italian FREMM have been given the same huge main mast of an Horizon destroyer, carrying the heavy, powerful EMPAR radar system, and this has, again reportedly, made the ship remarkably bow-heavy, with consequences on handling, particularly in rough seas.

In many ways, the italian FREMM is a good comparison to Type 26: the italian navy is taking delivery of two variants, the General Purpose and ASW. The first replaces the towed sonar of the second with a stern ramp for the deployment of a 11-meters RHIB. The other main differences are that the GP is armed with a 127 mm gun and a 76 mm gun-CIWS, while the ASW has two 76 mm guns. The GP is, for now at least, not fitted with the SLAT anti-torpedo decoy system, which is instead standard on the ASW.
Both ships carry two helicopters in two hangars: one, slightly larger than the other, can house an AW-101 Merlin, while the other is sized for the NH-90 helicopter. The frigates can employ one AW-101 and one NH-90, or two NH-90.
In fairness, i've heard comments suggesting that the AW-101 hangar is quite tight, and considered more adequate to carry a NH-90 and offer spaces for its maintenance rather than allow the actual enduring embarkation of an AW-101 Flight. The smaller hangar bay has been described as just large enough to house the NH-90, without work spaces, so it does seem more practicable to go with two NH-90s, which is by the way more likely as Italy is procuring 40 to 46 NH-90 NFH, while the AW-101s are much fewer (10 ASW, 8 amphibious assault / transport and 4 AEW) and generally meant for use on the Cavour aircraft carrier.  
Both ships employ one 11-meters RHIB and one 7-meters one, with the GP adding a second 11-meters in the stern, as already said.

It would be interesting to have an accurate displacement value, as it could provide a useful ballpark idea for what the Type 26's own displacement might be.

The italian FREMM has accommodation for at least 200 following the modifications (180 on the french FREMM), but also has a core crew considerably larger than the french variant (108 including 14 men of the helicopter flight): the GP was meant to have a crew of 131, and the ASW of 133. Use of the platform at sea has since inspired an expansion of 34 men, as well as some 23 for the aviation department.
The increase in crew size has had some impact on the vessel: currently, the space originally preserved to fit two 8-cell Sylver A70 launcher modules for strike missiles has been sacrificed to provide additional accommodation spaces.
The standard of accommodation, especially in the original rooms, is very high. The room with more bunks has only 4 beds. That's a lot of volume used in what does not appear to be a very efficient way.  

The Type 26 is aiming for a core crew of 118, with accommodation for another 72 personnel. On the Type 45, junior rates sleep 6 per room. On the Queen Elizabeth class, the 6 bunks rooms are larger, but come with two folding beds which can be used to embark 2 more personnel.
On the Type 26, which will need some pretty well optimised use of space for fitting accommodation for 190 plus a large flexible mission bay and a substantial number of VLS, the arrangement of bunks has not yet been detailed. However, back at Euronaval 2012 some reporters talked about 9-bed rooms, a bit of a sacrifice in terms of crew spaces to make everything fit.

Sensor-wise, the italian FREMM is fitted with the EMPAR, as said earlier, a system considerably larger than ARTISAN 3D: the antennas of the two systems weight 2,45 tons against 0,7 tons.

In armaments, the italian FREMM carriers two 8-cell Sylver A50 modules, with the SAAM - Extended Self Defense control system, which enables limited area defence employing not just Aster 15 but Aster 30 as wll. The limitation in area defence performance comes, effectively, from the fact that the FREMM does not support the EMPAR with a long-range radar as happens instead on the Horizon destroyers.  
Type 26 will be able to employ up to 48 CAMM / Sea Ceptor missiles, distributed in two silos. Weight-wise, despite the big difference in numbers, it is the SAAM-ESD that weights the most, since each Aster 15 in its canister weights a full 550 kg, with Aster 30 reaching the 700 kg, while each CAMM canister is in the region of the 100 kg, and being a cold-launch weapon it does not need a VLS as bulky and complex as Sylver (over 8 tons per module, but exact weight not available).
The FREMM armament is completed, in the GP case, by a 127/64 gun (34 tons with turret ammunition drums filled with 56 shells) plus 305 shells in an automated handling two-storey ammunition depot; two 25 mm guns, two triple MU-90 torpedo tubes, eight TESEO anti-ship missiles (770 kg each in their canister) and a 76mm gun on top of the hangar, weighting 7,9 tons without ammunition.

The Type 26 however will have, as of October 2014 information, 24 MK41 strike lenght cells available in addition to Sea Ceptor. Each module, bare of weapons, weights some 14,5 tons. If each cell was filled with a MK14 Mod 2 canister containing a Tomahawk missile (the heaviest, at 2,777 kg each), the weight would rise rapidly! The maximum weight of the Flexible Strike Silo, launchers plus Tomahawk canisters, could be in the region of an impressive 110,15 tons.
However, to this day there is no real indication yet of what the Royal Navy wants to fit. Tomahawk appears to be likely, but the Royal Navy also needs to replace Harpoon, and the only MK41 candidate which could be readily available by then would be the american LRASM solution. The anti-submarine "rocket", if it will be actually pursued at some point, would be another novelty.

The italian FREMM carries enough fuel for 6700 nautical miles, and enough stores for 45 days, officially. The Type 26 reportedly aims for no less than 7000 nautical miles and 60 days, so there might easily be dozens of tons of difference in the amount of fuel carried, and a significant difference in the volume and weight of stores, as well, but providing exact figures is not possible at this point.
The propulsion systems have in common the presence of a gas turbine and four diesels, but that's about it. The italian FREMM uses a 32 MW LM2500+ G4 gas turbine and 4 Isotta Fraschini VL1716 diesels and 2 Jeumont Electric motors, while the Type 26 will have a 36 MW Rolls Royce MT30 and 4 MTU V20 diesels generating 12 MW. However, the FREMM is a CODELAG ship which can run the gas turbine and the diesels at once to sustain high speed in rough sea or obtain greater max speed, thanks to a RENK 170-175 gearbox set weighting some 120 tons; while the Type 26 will be CODELOG, which means the diesels will be used to generate electric power for silent cruise speed, but will be detached when max speed is requested, leaving the sole MT30 to directly drive the two shafts.
The electric motors of the Type 26 are to be supplied by General Electric, and the gearbox by David Brown.

Overall, it is quite natural to expected a loaded Type 26 to exceed 7000 tons and the weight of the slightly smaller and less armed FREMM, but 8000 tons would seem to be an exaggeration.



Costs  

It is a good thing that the Type 26 does seek to reuse much of the expensive equipment fit (main radar, Future Local Area Air Defence System / Sea Ceptor, light guns, navigation radars and other equipment) and build on existing technology (including the shared infrastructure common combat system, which is being rolled out across the Royal Navy's surface fleet in the coming years, having already been installed on HMS Ocean, ordered for the Type 23s and mandated for the new build OPVs), because otherwise there would be no chance to meet the ambitious cost targets set for the programme.
The hull is going to be big and capable, and very dense, with such big spaces being requested for the Strike VLS, mission bay, fuel and stores. The Strike VLS fit is not new (it builds on something that is operational on hundreds of ships around the globe) in general terms but is a new entry in the Royal Navy, so will need to be acquired anew.

Ultimately, we do not know which is the current target pricetag for the Type 26. The newspapers have recently made headlines about Type 26 being a 4 billion project, but this isn't too helpful because government has notoriously indicated that there is likely to be a first contract for 8 ships, to be followed (hopefully) by 5 more later. If 4 billion applied to the first 8 hulls only, the cost per ship would 500 million pounds, rather non ambitious at all. On the other hand, 4 billion for 13 ships would likely be too little, at little more than 307 million per hull. Result maybe not beyond the realm of the possible in general terms, but looking too ambitious for british shipbuilding, which isn't really famous for being cheap.

Maybe the danes could get it done: they have very successfully built the IVER HUITFELDT class frigates, three capable air area defence warships which have cost an amazingly low 313 million USD each.
These impressive vessels, however, build their hulls on the experience of the commercial operator Maersk, a factor not to be underestimated. The design has also benefitted from previous work done to design the Absalom class, another success story.

The IVER class use a fully-diesel propulsion with 4 large MTU sets which can push the ship for 9300 nautical miles at 18 knots, but that can also thrust her to over 29 knots speed with a 120 seconds acceleration time. The base crew of 116 isn't too far from Type 26's target, nor is total accommodation available, set at 165+ men.
The IVER is a 6649 tons displacement vessel, about as large in beam as Type 26, but around 10 meters shorter.
The ships are fitted with an advanced combat system and with the excellent APAR multi-function radar used also on the german SACHSEN ships, supported by the SMART L, the long range radar which equips the Horizon and Type 45 destroyers (in the S-1850M variant). They have a 32-cells MK41 Strike Lenght silo amidship, supplemented by 24 additional cells for ESSM missiles and by space for more ESSM or for up to 16 Harpoon. They are fitted with two 76 mm guns, and a Millenium CIWS, but could soon enough swap one 76 for a MK45 MOD 4 gun. The other 76 could stay or be replaced by another Millenium.



Amazingly cheap, these ships deliver formidable value for money. The budget for all three was 940 million USD, supplemented by 209 million in re-used equipment (ESSM cell modules, Harpoon and 76 mm guns, mainly). The budget did not include the purchase of the SM-2 missiles for air area defence, so for now the MK41 is empty and only ESSM is available, and the 127 mm gun is planned but not yet purchased.
Deep in the hull, they have space reserved for a towed sonar, and further space for other equipment with a footprint equivalent to four 20 feet containers. 







It will be a big challenge for the british shipbuilding industry to keep Type 26 costs down. There is no revolutionary system being requested, but on the other hand there is admittedly quite a lot of capability being designed into a dense hull.
The amount of re-use of existing equipment migrating from the Type 23 could be a real lifesaver for the programme: the abundant carry over should represent a big "saving" of sort (money will have of course have been spent for all items, but early and separately), especially since it covers most of the big-money items of the combat equipment.

Saying how much it will cost to fit the new MK45 main gun and the MK41 silo is not easy, but thanks to an immensely useful USN document detailing the cost of new build DDG-51 destroyers by major subsystems, i've put together a ballpark estimate. Take it with prudence and salt, of course: this is a very rough method for estimating costs, but i think it is interesting enough to be included as a basis for discussion and reflection.



To provide a rough cost indication, i've scouted US Navy documents which helpfully provide a major breakdown of the cost of a DDG-51 by major subsystems and related components and activities, looking at the years 2013, 2014 and 2015. There are, as always happens in these things, some pretty large variations in price from a year to the next, but it is at least possible to get an idea. The yearly data suggests that ordering many in the same years significantly lowers the costs with economies of scale. (USN document)




The MK41 fit on a DDG-51 is a 12 launch modules affair, with a cost in the region of the 48 million dollars. 12 modules, however, are the fit of 4 Type 26s, according to the info we now have. So it might take around around 160 million USD to put 24 MK41 cells on all Type 26s. Rough estimate, of course, i want to say that again. The number of modules is lower per hull, but there are more ship sets. However, there should not be a big difference per se in terms of ship sets installation. Dropping 36 modules in three hulls or 39 in 13 hulls shouldn't be excessively different, but for the fact that they would be separate operations happening on different years. This might raise the cost, but overall i would like to think that things would even out in a reasonable way.

If it is decided that the Type 26s have to be able to successfully employ Tomahawk, they need the Tactical Tomahawk Weapon Control System fit too, and that could require up to some 16 million USD per ship (cost for a single ship set in 2014, the unitary cost drops as low as 11 million with 3 sets in 2013 and 13 million with 2 sets in 2015). 16 million for all 13 ships would add up to 208 million for the class. Again, rough estimate. All costs inclusive of technical support, engineering, initial spares etcetera. I don't know if LRASM has a comparable, separate mission planning system. Probably not, but there would be of course integration costs of its own with it having its own backend in a shape or another.

The rest of course depends on the missile, and how many All Up Rounds are purchased. The last Tomahawk contract, which included 20 submarine torpedo tube TLAM for the UK, was a firm fixed price order for 231 rounds (147 Vertical Launch rounds for US surface warships, 64 encapsuled rounds for US navy submarines with VL cells and 20 torpedo tube launch TLAM rounds for the UK) for 251,13 million dollars.


In theory, and i'll say it again in theory and in rough estimates, 24 MK41 cells + Tomahawk mission system + 231 missiles (using the 231 figure and its cost, even though the torpedo tube missile is more expensive than the VL) = 619.13 million dollars, or around 396 million pounds, at today's rates. And that's with a 231 TLAM order thrown in for good measure, that we all know isn't going to happen. Probably there would be a finite, much smaller number of missile loads purchased, and the deploying ships would stop by the Upper Harbour Ammunitioning Facility prior to deployment to take the rounds on board, since pretty much never are we going to see all 13 vessels on operations at once anyway.

All this, just to have a ballpark idea based on something. Better than speaking purely on wild speculation.
If you follow the link to the US Navy document, you'll see that it quotes Unitary Item Costs which are all much lower than the amounts i used. I did that deliberately, by looking at the total expense per ship related to the various items so to include, albeit of course in a rough way, the spares, engineering and services costs which are very much inevitable. Using the unitary cost alone would not be realistic, as the amounts resulting would be much lower than the real ones. In this other way, the cost figures should be much closer to the truth. 
This is mainly to indicate that it won't be the fitting of MK41 launchers that will break the programme's budget on its own: they fit 32 MK41 cells on the cheapest high end combat ships out there, as we saw.

As for the MK45 Mod 4, it is also of some interest to see its cost is in the region of some 25 million apiece, apparently. Again, the cost for a british purchase might be different, and it is indeed likely to be somewhat higher since for the UK it will be a totally new system, while it is business as usual for the US Navy. 



In this long piece, i've wanted to share the quality info i've found about what the design of Type 26 offers, and i've also tried to explain why i talked the way i did about the reports of cost issues and the delay in clearing Main Gate. The requirements, taken as a whole, are ambitious in several ways, and i won't deny that. But they have maintained steady over time, and they are being mitigated by a responsible approach to the programme. I hope that now the whole package can be made to work, and work well. Because one thing is certain: this programme is of vital importance to both the Navy and the british shipbuilding industry. It is in the interests of both that it goes as planned. 
If it did, it really might be a renaissance for british yards, because this ship, while not revolutionary in its subsystems, is very much (r)evolutionary in terms of what it delivers as a whole. A good product at a reasonable price: what is needed for the Navy to survive, and for export orders to return to british shipyards.


Thursday, June 26, 2014

News from the forces - Check for updates


IPA-7 to fly this year to experiment new Typhoon aerodynamics feature; Brimstone 2 and CFTs

The german instrumented aircraft IPA-7 is preparing to fly with a package of aerodynamic modifications including LERX and strakes. The german side of Eurofighter has been working on LERX surfaces for quite a long time, to demonstrate that the Typhoon's agility can be improved.

FlightGlobal reports on the expected benefits of the changes: http://www.flightglobal.com/news/articles/eurofighter-new-aerodynamics-set-for-2014-test-flight-400762/

The article does not cover the annoying part of this new aerodynamics program, which instead appeared in the mega special issue on Typhoon 20th anniversary by AirForcesMonthly, which by the way is strongly recommended to anyone with an interest in Typhoon. The information is that Conformal Fuel Tanks can have "quite a severe impact" on stability margins for Typhoon, causing strakes to be considered "essential enablers". 

It seems, in other words, that the Tranche 3A is not as "ready to take" the CFT as we've been told for a while. This means cost and complexities to re-introduce the new aerodynamics afterwards. My confidence on seeing CFTs on RAF Typhoons has dropped a lot when i read that. Even though inserting LERX and strakes should not be particularly challenging, we all know how tight the budget is, and while the RAF has opened a program and a funding line for AESA radar, one for CFT was missing, even before these news.

Then a 5 million contract for early studies on Brimstone 2 integration on Typhoon was awarded to BAE, with the aim of having the missile available by 2018, in time to avoid a gap as Tornado GR4 sis withdrawn. Good news, but again with a bitter part: the Brimstone integration contract covers only four pylons instead of the once planned six, leaving out the "wet" pylons needed for external fuel tanks. My confidence on ever seeing CFTs on RAF Typhoons dropped even lower still, because logic suggests that, if there was confidence in adopting CFTs, having the Brimstone integrated on all main underwing pylons would make sense. Paveway was integrated on all pylons, for example. Integration on all pylons would give flexibility in terms of max load and mixing of Paveway IV and Brimstone, with the CFTs more than compensating the loss of the under-wing fuel tanks (possibly even giving 3000 litres instead of 2000).

It was once expected that Brimstone launchers would be integrated on all six A-S pylons under the wings, like Paveway. It does not seem to be the case.

But without CFTs, external tanks will pretty much always be there, and that would explain the "no bothering with wet pylons" approach.


A first configuration of LERX was flight tested already years ago

Worst part by far in a possible no-CFTs scenario is the Storm Shadow carry config. No way to avoid the loss of 2000 litres of fuel, in that configuration, which ranks among the most fuel thirsty because of Storm Shadow weight and drag. A bad deal, if that proves to be the case. I can only hope that we will actually see CFTs brought in, despite the challenges.

Meanwhile, the Typhoons of 6 RAF Squadron completed their transfer to Lossiemouth on June 20, and celebrated the event by flying in a big Six formation.

Picture by AirForcesDaily.com

Typhoons in the refurbished Hangar No3 at Lossiemouth

The Typhoon has also had a few sad news in recent times, with one spanish unit crashed and one air collision in Germany which sent a Learjet with two people on board crashing. The air collision is likely to add new urgency to the RAF's work, revealed in december 2013, for testing and adopting a Collision Avoidance system for installation on Typhoon.
The Honeywell TCAS II collision avoidance system has been in the meanwhile purchased for installation on Tornado GR4, after many years of hesitations and delays.



F-35A ground fire putting pressure on plans to deploy F-35B to the UK

Following the fire which developed in the aft section of an USAF F-35A taking off from Eglin AFB, F-35A and F-35B flying has been put on a safety pause while the damaged aircraft is examinated to determine the likely cause of the accident.
A full investigation and report could easily take between 60 and 90 days, and that would be a very serious issue. At the moment, the F-35 fleet is not grounded, and flying is expected to resume immediately if the preliminary findings are favorable. Commanders with responsibility for the test, training and operational fleets will decide whether to authorize flying or not, on a daily basis, until full confidence is restored.
The deployment of 4 F-35Bs to the United Kingdom remains planned, with the first useful window for the transatlantic flight from Patuxent River being on June 29. Time margins are most evidently tight, and pressure is undoubtedly mounting.



Tide class tankers construction begins in South Korea

DSME cut the first steel for the future RFA Tidespring on June 24, the first of four new tankers to be built under the MARS Fleet Tanker programme. Hull manufacturing will take just 10 months from first steel cut to launch, while the blocks making up the ship are expected to be joined up in just 50 days. Handover of the basic ship, ready for the sea, to the MOD is planned for 15 October 2015 in South Korea.



A crew of around 30 from the RFA will sail the ship to the UK, where it will be extensively customized and fitted out with all the role-specific equipment. Entry in service in 2016.

Photo by BMT


According to the schedule, DSME will hand the last ship in the class (Tideforce) to the MOD on 15 April 2017. All deliveries will happen six months apart.



First three Chinook HC6 active in Odiham

The first three new Chinook HC6 have been re-assembled and put in service in RAF Odiham. Reportedly, their digital flight control system is performing excellently, so much so that the RAF is already trying to work towards a new upgrade program for the rest of the fleet, to roll out digital flight controls on all other Chinooks.


The Digital Automatic Flight Control System on the HC6 provides improved handling qualities and aircraft stability, and increases safety of operations in brown out conditions. Deliveries of the HC6 are due to complete before the end of 2015, and Full Operational Capability in No 7 Squadron is due by 2017. 

Plans on how to employ and base the expanded fleet of 60 Chinooks are not yet finalized. RAF Odiham is not large enough to support intense usage of all 60 helicopters, the station commander went on record saying. Some of the helicopter might end up parked in hangars as back-ups instead of genuine additional helicopters. To avoid this scenario, the hope is to stand up a "new" Chinook squadron, by re-roling one of the current two Merlin HC3 squadrons, which will soon disband as the Merlin is handed over to the Commando Helicopter Force. 
The idea is to exploit the space available at nearly Benson to stand up a Chinook OCU squadron on the base (which already hosts the simulators and training rooms for the type), while keeping the current squadrons in Odiham as frontline fleet. 



Commando Helicopter Force takes over the Merlin HC3 in September

September 30 is the date planned for the takeover of the Merlin force by the CHF. Immediately after, in early October, AgustaWestland will begin the phase 1 conversion of 7 Merlin HC3 in HC3I, with basic navalisation. 
These helicopters will cover the gap between the withdrawal of Sea King HC4 and the arrival of the first fully marinised Phase 2 Merlins HC4 in 2017. The HC3I (Interim) will be brought to full Phase 2 / HC4) standard at the end of the program. 
The deliveries might have been speeded up, with the end date earlier indicated as March 2022 being now apparently 2020. 

The current RAF Merlin squadrons will disband: 78 Sqn should disband already in September, replaced by the reformed 846 NAS, while 28 Sqn will stand down in mid-2015. 



FRES SV Troop carrying variant showcased 

The only big news from DVD2014 so far is the unveiling of the pre-production prototype of the Protected Mobility Reconnaissance Support variant of the FRES SV family. 
This vehicle, mainly intended to replace Spartan, carries 8 dismounts and is equipped with a variety of systems: 


Its extensive capabilities include acoustic detectors, a laser warning system, a local situational awareness system, an electronic countermeasure system, a route marking system, an advanced electronic architecture and a high performance power pack.

Like the Scout is planned to be, the PMRS variant seems to be also equipped with a Vitavox public address system that allows the vehicle's commander to speak to people outside the vehicle without exposing himself to danger. The vehicle in static exposition sports a RWS with .50 machine gun, and a 360° degrees situation awareness system, integrated with very thick add-on armour kit. Details, however, still are few.





I will avoid the easy (and sad) irony inspired by the "Ready to go" sign, considering the story of FRES. 

 
VitaVox was awared a 2.8 million contract for its Public Address system in January 2013


The cost of the demonstration phase has grown from 500 to 600 millions, as work on developing future variants (ambulance, possibly also engineer recce and command post) has been brought forwards and included in current activities. The MOD is now trying to cut the waiting and get to the signing of a production contract before the general elections and SDSR come in and impose the usual delays and uncertainty. 

Minister Dunne is sitting in the gunner's seat. An hatch above him allows access and reload of ammunition boxes on the Kongsberg Protector RWS. Armed with the .50 heavy machine gun, the RWS is stabilized to allow fire on the move. To the left of the minister, slighty ahead, the Commander's position can be partially observed. The driver sits further ahead, down in the front of the hull. The number of dismount seats, surprisingly, remains controversial: it varies from 3 to 8 in news reports. Official MOD and General Dynamics news releases made no clarity on this point.




UPDATE: the PMRS seen at DVD does indeed have only 3 seats for dismounts, all on the left side, facing a huge storage space on the right side. If this is the final recce support configuration, the Support Troop in reconnaissance Sabre Squadrons, assuming it remains on four vehicles, will still have 24 (1 officer, 23 soldiers) men, spread six per vehicle as with the far smaller and lighter Spartan APC. The Spartan, however, carries 4 dismounts and 2 crew, while PMRS has a crew of 3.

Photo by Defence Photography. Visit the gallery: http://www.defencephotography.com/blog/2013/our-unique-look-at-scout-sv.html

Photo by Defence Photography. Visit the gallery: http://www.defencephotography.com/blog/2013/our-unique-look-at-scout-sv.html

Immensely interesting images of the inside of the vehicle and of the engine hatch open for maintenance are available thanks to Defence Photography: http://www.defencephotography.com/blog/2013/our-unique-look-at-scout-sv.html



WalesOnline and Forces TV have a few more interesting photo of PMRS: http://www.walesonline.co.uk/business/business-news/show-first-time-british-armys-7326484
http://www.forces.tv/75369002

And video: http://www.forces.tv/35658155


Regarding numbers, Lochkeed Martin hopes to produce 245 turrets, suggesting that 245 Scout vehicles will be produced. Including PMRS, Recovery and Repair vehicles, the FRES SV Block 1 should include in total between 400 and 580 vehicles.




Challenger 2 Life Extension Programme

At DVD, something is on the move about the LEP programme for Challenger 2. The programme is in its concept phase, and taking shape for initial gate decisions planned in the first quarter of 2015.




Unfortunately, the budget, once hoped to be in the 1.2 billion pounds range, has been reduced to 700 millions. The risk now is that upgrading all the 227 tanks left in the Army might not be possible, creating a two-tier fleet which might even result in a further cut, as the non-upgraded tanks could become simply impossible to use. 

This follows a years long drop in the ambitions related to Challenger 2 modernisation, which already saw the dropping of the project for fitting a smoothbore, NATO-standard gun and, most likely, the abandonement of any ambition about replacing the powerpack as well.




Bridging for the future 

Another army programme that should pick up momentum in the next months is the renewal of bridging equipment to extend its service life and increase its Military Load Class capability to ensure gap crossing for the heavier, up-armored and new generation army vehicles. 

BR90 equipment will likely get refurbished and upgraded with a CSP programme, but new buy is also an option: WFEL is at DVD2014, proudly displaying its Dry Support Bridge, a strong contender for the british army requirement. With the capability to bridge a 46 meters gap with a Military Load Class 120, this strong bridge more than meets the requirements set forth by the MOD.

The british army will decide the way forwards with a competition under Project Tyro, to be launched in October. At this point, the BR90 ABLE launching equipment and the Unipower bridge carrying trucks might indeed change. Earlier ambitions included mounting the bridging equipment on a more standard and wide-used army vehicle, ideally the MAN support trucks, to achieve logistic commonality with the SV fleet, and there might still be a chance to see it happening. At DVD2014, the Dry Support Bridge was seen on the Iveco Trakker truck, which is also in british army use, albeit in the low hundreds instead of in the thousands like MAN SV. The Trakker has the advantage of being a cheaper truck, though, and that might help. 






Warrior CSP and ABSV 

The Warrior CSP should finally progress. There have been several months of delay from original expectations, but manned firing trials should take place over the end of this year and in early 2015. The Critical Design Review should be completed in the second quarter of 2015, and then the army should finally be able to start acceptance trials. 


11 vehicles in all variants will be prepared for the trials. Their production is expected to take 9 months, and will happed at the UK DSG facilities in Telford. The CSP prototypes will include six FV510 Section Vehicles, two FV511 Infantry Command Vehicles, one recovery and one repair vehicles (FV512 and FV513) and one FV514 Artillery Observation.

The final number of vehicles to be upgraded is not yet set in stone. The decision is expected to be made in the new year. The bottom target figure is 381 vehicles, including 250 turreted ones. The NAO report 2013 suggests 445 vehicles are the army's plan for the upgrade, but it is not clear if this figure includes ABSV.

Note that 250 turreted vehicles (FV510 and FV511) would not be sufficient to cover the six planned armoured infantry battalions and training fleet needs. Considering that each battalion needs about 50 turreted Warriors, a total of 250 would realistically cover only 4 battalions, plus training margins.



It has now been reported that the ABSV program has been formally separated from Warrior CSP. The programme should progress towards Initial Gate before the year's over, and in-service date is tentatively fixed for 2019, to stay roughly in line with the introduction of the upgraded Warriors.

Using surplus Warrior hulls for ABSV remains an option, but is no longer considered the automatic choice. The Army will look at the available options.
ABSV is to deliver much needed replacement for FV430s used in Command Post, Mortar and Ambulance roles. An Anti-Tank variant is tentatively envisaged: currently, british armoured infantry battalions do not have vehicle-mounted anti-tank systems, but employ Javelin teams disembarking from slightly modified FV510 Section vehicles (turreted).
An ABSV anti-tank variant, if it ever happened, would replace the FV510 in this role and thus reduce the number of FV510s upgraded needed.
The Army will have to balance these considerations, and stay inside tight budget constraints.

BAE has shown at DVD a turretless Warrior ABSV demonstrator in mortar carrier configuration, fitted with slat armour, 360° Situational Awareness camera fit and a Selex Enforcer RWS. 







British Army will trial lots of french kit 

A rifle company from 4 RIFLES battalion will deploy to southern France in september for an 8-month training and trial programme on the french VBCI vehicle. The trial is known as Project Brittany, and will inform requirements for the future FRES UV restart. 
The VBCI was one of the contenders in the 2008 evaluations for the ill-fated earlier life of the FRES UV programme, but lost out early because it did not adequately respond to key british requirements: the engine couldn't be removed and replaced in the field, and the growth margin was insufficient. 

In these years, however, the VBCI underwent upgrades and is now offered with new suspensions and transmission enabling weight growth to 32 tons; engine replacement in the field, 4th wheel steering for improved tight turning; upgraded air conditioning and engine power; repositioned fuel tanks and better optimization of internal available volume. 

British personnel will also trial the CAESAR self-propelled truck mounted 155/52 howitzer, and the 120mm heavy mortars to inform future requirements as the out of service dates of AS90 and L118, already pushed to the right several times, draw nearer. It will be years, though, before anything actually moves on.





Type 26 new contracts 

General Electric to supply the electric motors
Imtech Marine to supply HVAC and low voltage power systems
Babcock at work on advanced Air Weapons Handling System



FASGW(Light) contract for final development and Wildcat integration signed 

Thales has been awarded a 48 million pounds contract for the final development of the 5-pack LMM launcher and for its integration on the AW159 Wildcat helicopter.